Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076G151 + (07:40:56, 15 December 2024)
- BSEP-94-0411, Provides NRC W/Individuals Applying for Reactor Operator or Senior Reactor Operator Licenses + (07:40:57, 15 December 2024)
- 05000482/LER-1994-009, :on 940918,determined That Positive Reactivity Insertion Occurred W/O Operable Boron Injection Flow Path. Caused by EDG a Being Inoperable Due to Loose Switch.Loose Switch Replaced + (07:40:58, 15 December 2024)
- ML20076G139 + (07:40:59, 15 December 2024)
- ML20076G138 + (07:41:02, 15 December 2024)
- ML20076G137 + (07:41:02, 15 December 2024)
- ML20076G122 + (07:41:03, 15 December 2024)
- ML20076G121 + (07:41:04, 15 December 2024)
- 05000361/LER-1991-020-01, :on 911226,noted That Weekly Surveillance on Class 1E 125 Volt Dc Batteries Not Performed Due to Personnel Error.Event Will Be Reviewed W/Appropriate Personnel to Ensure Understanding of TS 4.0.3 + (07:41:05, 15 December 2024)
- ML20076G106 + (07:41:07, 15 December 2024)
- BSEP-83-1547, Responds to Rev 1 to IE Bulletin 82-03 Re Reactor Recirculation & RHR Sys.Defective Welds Repaired Using Weld Overlay Technique.Weld Indication Tables & Isometric Drawings of Defective Weld Locations Encl + (07:41:08, 15 December 2024)
- ML20076G094 + (07:41:08, 15 December 2024)
- ML20076G091 + (07:41:09, 15 December 2024)
- ML20076G085 + (07:41:10, 15 December 2024)
- ML20076G075 + (07:41:10, 15 December 2024)
- ML20076G073 + (07:41:11, 15 December 2024)
- ML20076G067 + (07:41:12, 15 December 2024)
- ML20076G063 + (07:41:12, 15 December 2024)
- ML20076G045 + (07:41:13, 15 December 2024)
- ML20076G040 + (07:41:14, 15 December 2024)
- ML20076G011 + (07:41:16, 15 December 2024)
- ML20076G018 + (07:41:16, 15 December 2024)
- ML20076G010 + (07:41:17, 15 December 2024)
- ML20076F988 + (07:41:18, 15 December 2024)
- ML20076F984 + (07:41:18, 15 December 2024)
- ML20076F979 + (07:41:19, 15 December 2024)
- L-83-287, Responds to NRC Re Violations Noted in IE Insp Rept 50-389/83-16.Corrective Actions:Process Sheets Will Include Const Hold Points That Will Be Signed Off,Providing Ongoing Status of Required/Completed Insps + (07:41:20, 15 December 2024)
- ML20076F978 + (07:41:20, 15 December 2024)
- ML20076F967 + (07:41:21, 15 December 2024)
- ML20076F949 + (07:41:22, 15 December 2024)
- ML20076F944 + (07:41:23, 15 December 2024)
- ML20076F946 + (07:41:23, 15 December 2024)
- ML20076F943 + (07:41:24, 15 December 2024)
- ML20076F940 + (07:41:25, 15 December 2024)
- ML20076F934 + (07:41:26, 15 December 2024)
- ML20076F929 + (07:41:27, 15 December 2024)
- ML20076F926 + (07:41:27, 15 December 2024)
- ML20076F920 + (07:41:28, 15 December 2024)
- ML20076F925 + (07:41:28, 15 December 2024)
- PLA-1697, Responds to IE Bulletin 83-03, Check Valve Failures in Raw Water Cooling Sys of Diesel Generators. Listed Check Valves in Essential Svc Water Flowpath Will Be Included in Rev 2 to 830630 Pump & Valve Inservice Test Program + (07:41:29, 15 December 2024)
- ML20076F910 + (07:41:30, 15 December 2024)
- ML20076F903 + (07:41:31, 15 December 2024)
- ML20076F909 + (07:41:31, 15 December 2024)
- ML20076F902 + (07:41:32, 15 December 2024)
- 05000458/LER-1994-026, :on 940915,deficiency in STP 055-0101, Ifts Pre-OP & Weekly Interlock Operability Test, Identified as Part of Ongoing TS Review Project.Caused by Inadequate Oversight of STP Development.Ts Implemented + (07:41:34, 15 December 2024)
- 05000373/LER-1983-087-03, /03L-0:on 830718,all Five Turbine Bypass Valves Went Open Due to Work on Electrohydraulic Control Sys & MDRFP Tripped on High Due to Swell.Caused by Loss of -22 Volt Dc Power Supply Due to Personnel Error + (07:41:39, 15 December 2024)
- 05000316/LER-1983-070-03, /03L-0:on 830726,channel 2 Containment Pressure Indication Failed Low.Caused by Dirty Contacts in Toggle Switch Test Circuit.Toggle Switch Cleaned & Exercised + (07:41:41, 15 December 2024)
- ML20076F883 + (07:41:42, 15 December 2024)
- 3F1094-05, Monthly Operating Rept for Sept 1994 for Crystal River Unit 3 + (07:41:44, 15 December 2024)
- 05000316/LER-1983-069-03, /03L-0:on 830718,east Component Cooling Water Pump Discharge Crosstie Valve CMO-412 Would Not Close Completely. Caused by Low Valve Operator Torque Switch Setting. Switch Adjusted + (07:41:45, 15 December 2024)
- ML20076F867 + (07:41:46, 15 December 2024)
- ML20076F863 + (07:41:47, 15 December 2024)