Monthly Operating Repts for Sept 1994 for Beaver Valley Power Station Units 1 & 2
ML20076F934
Person / Time
Site: Beaver Valley
Issue date: 09/30/1994
From: David Jones, Noonan T
DUQUESNE LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9410180261
Download: ML20076F934 (9)


Text

r-

+4

  • e T5 At Telephone (412) 393-6000 Nuclear Group P.O. Hon 4 Shippingport, PA 15077-0004 October 7,1994 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. 5 Nuclear Regulatory Commission D:>cument Control Desk Was'sington, D.C. 20555 Gr.ntlemen:

In accordance with Appendix A,

Technical Specifications, the Monthly Operating Report is submitted for Unit 1 and Unit 2 for the month of September,1994.

Respectfully, T. P. Noonan Division Vice President, Nuclear Operations /

Plant Manager DTJ/mmg Enclosures cc: NRC Regional Office King of Prussia, PA

o<rc-

.c0ULLo k

w :

The Nuclear Professionals 9410180261 940930 g

PDR ADOCK 05000334 R

PDR J

i

i t

NARRATIVE SGNUE OF

-i i

10fflMLY OPIRATING EXPERIENCE UNIT 1 i

i SEPIDEER 1994 1

i t

September 1

'Ihe Unit operated at a raninal value of 100% output for the.

l through entire report period.

September 30 I

i l

-j i

?

f i

t I

I I

k e

l 1

1

AVERAGE DAILY UNIT POWER I1 VEL l

DOCKET NO.

50-334 UNIT BVPS Unit 1 l

DATE October 4, 1994 034PLEITD BY David T. Jones i

TELEPHONE (412)'393-7553 l

Mormi' September 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 825 17 813 2

825' 18 817 3

829 19 816 i

4 821 20 817 5

817 21 825 i

6 821 22 821 1

7 817 23 825 l

8 829 24 817 r

9 825 25 817

[

10 813 26 821 e

11 817 27 825 r

12 825 28 821 13 817 29 829

[

t 14 813 30 829 15 817 31 16 813 i

-i

)

INSTRUCTIONS On this form, list the average daily unit power level HWe-Net for each day in f

the reporting month. Compute to the nearest whole megawatt.

i

OPERATING DATA REPORT-DOCRET No.:

50-334 REPORT DATE:

10/04/94 f

COMPLETED BY: DAVID T. JONES l

TELEPHONE:

-(412) 393-7553

\\

OPERATING STATUS i

1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT.1 Notes
2. REPORTING PERIOD: SEPTEMBER 1994
3. LICENSED THERMAL POWER (MWt):

2652.

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN ELECTRICAL RATING (Net MWe):

835

6. MAX DEPENDABLE CAPACITY (Gross MWe):

860

7. MAX. DEPENDABLE CAPACITY (Net MWe):

810

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:

e t

i

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None 1

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A THIS MONTH YEAR TO DATE CUMULATIVE Z

11. HOURS IN REPORTING PERIOD:

720.0 6551.0 161447.0-

12. h'O. OF HRS. REACTOR WAS CRITICAL:

720.0 4816.9 104347.8

'i

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 4482.8

14. HOURS GENERATOR WAS ON LINE:

720.0 4785.5 102328.7

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0

16. GROSS THERMAL ENERGY GEN. (MWH):

1902497.0 12325748.0 245731224.5

17. GROSS ELECT. ENERGY GEN. (MWH):

625530.0 4021430.0 79178953.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

590680.0 3762190.0 73981710.0

19. UNIT SERVICE FACTOR: (PERCENT)

~100.0 73.0 65.3

20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 73.0 65.3
21. UNIT CAPACITY FACTOR (MDC): PCT 101.3 70.9 59.0 4
22. UNIT CAPACITY FACTOR (DER): PCT 98.3 68.8 57.3
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 27.0 16.4
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

The Unit is scheduled to shutdown for its tenth refueline outare on i

January 2.

1995.

The refueline outare is scheduled to last for 60 days.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

126. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A 3

INITIAL ELECTRICITY N/A N/A j

COMMERCIAL OPERATION N/A N/A

+

-,e UNIT SMUTDOWNS AND POWER REDUCTIONS (220%)

Docket No.

50-334 Unit Name 8'PS Unit #1 v

Date _ October 4.

1994 REPORT MONTH SEPtEM8ER 1994 Completed By A vid T. Jones Telephone (412) 393-7553 L

i Method of-Licensee Cause & Corrective Duration Shutting Event-System Component Action to No.

Date Typel (Nours)

Reason 2 Doun Reactor 3 Report #

Code 4

. Code 5 Prevent Recurrence l

i NONE 1

2 3

F-Forced Reason:

4 Method:.

Exhibit F-Instructions for S Scheduled

- A-Equipment Failure (Emplain) 1-Manuel Preparation of Data Entry Sheets e-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram (NUREG0161).

D-Regulatory Restriction 4-Cont'd, from Previous Month E-Operator Training & License Exam 5-Reduction 5

F - A.inini s t rat ive 9-Other G-Cperational Error (Emptain)

Exhibit N-Same Source <

H-Other (Explain) 1

~

L------

-- - =

__ __ _M

NARRATIVE SWHARY OF MJtfIHLY OPERATING EXPERIENCE LNIT 2 SEPITEBER 1994 September 1

'Ihe Unit operated at a ncininal value of 100% output.

through September 14 September 15 With unusually warm atmospheric conditions present, a load i

reduction to a mininum output of approximately. 98.5% was connanced at 1628 hours0.0188 days <br />0.452 hours <br />0.00269 weeks <br />6.19454e-4 months <br /> to stabilize mderuser hotwell conditions.

Once corditions in the cordenser hotwell had improved, the Unit returned to full power at 1820 hours0.0211 days <br />0.506 hours <br />0.00301 weeks <br />6.9251e-4 months <br />.

September 16

'Ihe Unit operated at a ncminal value of 100% output for the through remainder of the report period.

Saptember 30 b

h

?

L l

l t

7 l

AVERAGE DAILY UNIT POWER LEVEL j

DOCKET NO.

50-412 3

UNIT BVPS Unit 2 DATE October 4, 1994 COMPLETED BY David T. Jones TELEPHONE (412) 393-7553 MONIH September 1994 I

DAY AVERAGE DAILY PCMER LEVEL DAY AVERAGE DAILY POWER LEVEL

.l (MWe-Net)

(MWe-Net) 5 1

828 17 820 2

831 18 829 3

830 19 830 4

828 20 828 i

5 829 21 825 i

6 828 22 825 i

7 826 23 826 8

822 24 820 t

9 819 25 817 10 824 26 825 11 827 27 827 12 824 28 829 13 816 29 830 t

14 811 30 828 15-807 31 16 813 INSIRUCTIONS On this fom, list the average daily unit p wer level MWe-lkt for each day in the reporting month. Cotipute to the nearest whole megawatt.

l

l OPERATING DATA REPORT DOCKET NO.:

50-412 REPORT DATE:

10/04/94 COMPLETED BY: DAVID T. JONES TELEPHONE:

(412) 393-7553 i

OPERATING STATUS i

'l'.' UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes

2. REPORTING PERIOD: SEPTEMBER 1994
3. LICENSED THERMAL POWER (MWt):

2652 i

4. NAMEPLATE RATING (Gross MWe):

923

5. DESIGN' ELECTRICAL RATING (Net MWe):

836

6. MAX. DEPENDABLE CAPACITY (Gross MWe):

870

7. MAX DEPENDABLE CAPACITY (Net MWe):

820

8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:

l

9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):

None

10. REASONS FOR RESTRICTIONS, IF ANY:

N/A i

i THIS MONTH YEAR TO DATE CUMULATIVE

11. HOURS IN REPORTING PERIOD:

720.0 6551.0 60230.0

12. NO. OF HRS. REACTOR WAS CRITICAL:

720.0 6285.2 51615.5

13. REACTOR RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0 1

14. HOURS GENERATOR WAS ON LINE:

720.0 6272.0 51268.6

15. UNIT RESERVE SHUTDOWN HOURS:

0.0 0.0 0.0 l

16. GROSS THERMAL ENERGY GEN. (MWH):

1897976.0 16470364.0 126702249.0'

17. GROSS ELECT. ENERGY GEN. (MWH):

624984.0 5467221.0 41119226.0

18. NET ELECTRICAL ENERGY GEN. (MWH):

593348.0 5187063.0 38837342.0

19. UNIT SERVICE FACTOR: (PERCENT) 100.0 95.7 85.1
20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 95.7 85.1
21. UNIT CAPACITY FACTOR (MDC): PCT 100.5 96.6 78.2
22. UNIT CAPACITY FACTOR (DER): PCT 98.6 94.7
77. 1
23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 4.3 3.1 7
24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):

The Unit is' scheduled to shutdown for its fifth refueline outare on March 24. 1995. The refueline outane is scheduled to last for 60 days.

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i

l UNIT SHUTDOWNS AND POWER REDUCTIONS (220%)

Docket No.

__.50 412 Unit Name BVPS Unit #2 Date October 4.

1994 Completed By _ David T.

Jones REPORT MONTH SEPTEMBER 1994 Telephone (412) 393-7553 -

Method of Licensee Duration shutting Event System Component Action to Cause & Corrective No.

Date Typel (Mours)

Reason 2 Down Reactor 3 Report #

code 4 Code 5 Prevent Recurrence NOME I

1 2

3 F-Forced Reason:

4 Method:

S-Scheduled A-Equipment Failure (Explain) 1-Manus' Exhib't F-Instructions for B-Maintenance or Test 2-Manual.,: ram Preparation of Data Entry Sheets C-Refueling 3-Automatic Scram for Licensee Event Report (LER) File 0-Regulatory Restriction (NUREG0161).

4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction F-Administrative 5

9-Other G-Operational Error (Explain)

Exhibit M-Same Source.

M-Other (Explain)

_ _ _._. -...., _. _..,., _ _,. - _... _ _,. _.