r-
+4
- e T5 At Telephone (412) 393-6000 Nuclear Group P.O. Hon 4 Shippingport, PA 15077-0004 October 7,1994 Beaver Valley Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthly Operating Report U. 5 Nuclear Regulatory Commission D:>cument Control Desk Was'sington, D.C. 20555 Gr.ntlemen:
In accordance with Appendix A,
Technical Specifications, the Monthly Operating Report is submitted for Unit 1 and Unit 2 for the month of September,1994.
Respectfully, T. P. Noonan Division Vice President, Nuclear Operations /
Plant Manager DTJ/mmg Enclosures cc: NRC Regional Office King of Prussia, PA
- o<rc-
.c0ULLo k
w :
The Nuclear Professionals 9410180261 940930 g
PDR ADOCK 05000334 R
PDR J
i
i t
NARRATIVE SGNUE OF
-i i
10fflMLY OPIRATING EXPERIENCE UNIT 1 i
i SEPIDEER 1994 1
i t
September 1
'Ihe Unit operated at a raninal value of 100% output for the.
l through entire report period.
September 30 I
i l
-j i
?
f i
t I
I I
k e
l 1
1
AVERAGE DAILY UNIT POWER I1 VEL l
DOCKET NO.
50-334 UNIT BVPS Unit 1 l
DATE October 4, 1994 034PLEITD BY David T. Jones i
TELEPHONE (412)'393-7553 l
Mormi' September 1994 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 825 17 813 2
825' 18 817 3
829 19 816 i
4 821 20 817 5
817 21 825 i
6 821 22 821 1
7 817 23 825 l
8 829 24 817 r
9 825 25 817
[
10 813 26 821 e
11 817 27 825 r
12 825 28 821 13 817 29 829
[
t 14 813 30 829 15 817 31 16 813 i
-i
)
INSTRUCTIONS On this form, list the average daily unit power level HWe-Net for each day in f
the reporting month. Compute to the nearest whole megawatt.
i
OPERATING DATA REPORT-DOCRET No.:
50-334 REPORT DATE:
10/04/94 f
COMPLETED BY: DAVID T. JONES l
TELEPHONE:
-(412) 393-7553
\\
OPERATING STATUS i
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT.1 Notes
- 2. REPORTING PERIOD: SEPTEMBER 1994
- 3. LICENSED THERMAL POWER (MWt):
2652.
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX DEPENDABLE CAPACITY (Gross MWe):
860
- 7. MAX. DEPENDABLE CAPACITY (Net MWe):
810
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
e t
i
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None 1
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH YEAR TO DATE CUMULATIVE Z
- 11. HOURS IN REPORTING PERIOD:
720.0 6551.0 161447.0-
- 12. h'O. OF HRS. REACTOR WAS CRITICAL:
720.0 4816.9 104347.8
'i
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4482.8
- 14. HOURS GENERATOR WAS ON LINE:
720.0 4785.5 102328.7
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1902497.0 12325748.0 245731224.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
625530.0 4021430.0 79178953.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
590680.0 3762190.0 73981710.0
- 19. UNIT SERVICE FACTOR: (PERCENT)
~100.0 73.0 65.3
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 73.0 65.3
- 22. UNIT CAPACITY FACTOR (DER): PCT 98.3 68.8 57.3
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 27.0 16.4
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
The Unit is scheduled to shutdown for its tenth refueline outare on i
January 2.
1995.
The refueline outare is scheduled to last for 60 days.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
126. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A 3
INITIAL ELECTRICITY N/A N/A j
COMMERCIAL OPERATION N/A N/A
+
-,e UNIT SMUTDOWNS AND POWER REDUCTIONS (220%)
Docket No.
50-334 Unit Name 8'PS Unit #1 v
Date _ October 4.
1994 REPORT MONTH SEPtEM8ER 1994 Completed By A vid T. Jones Telephone (412) 393-7553 L
i Method of-Licensee Cause & Corrective Duration Shutting Event-System Component Action to No.
Date Typel (Nours)
Reason 2 Doun Reactor 3 Report #
Code 4
. Code 5 Prevent Recurrence l
i NONE 1
2 3
F-Forced Reason:
4 Method:.
Exhibit F-Instructions for S Scheduled
- A-Equipment Failure (Emplain) 1-Manuel Preparation of Data Entry Sheets e-Maintenance or Test 2-Manual Scram for Licensee Event Report (LER) File C-Refueling 3-Automatic Scram (NUREG0161).
D-Regulatory Restriction 4-Cont'd, from Previous Month E-Operator Training & License Exam 5-Reduction 5
F - A.inini s t rat ive 9-Other G-Cperational Error (Emptain)
Exhibit N-Same Source <
H-Other (Explain) 1
~
L------
-- - =
__ __ _M
NARRATIVE SWHARY OF MJtfIHLY OPERATING EXPERIENCE LNIT 2 SEPITEBER 1994 September 1
'Ihe Unit operated at a ncininal value of 100% output.
through September 14 September 15 With unusually warm atmospheric conditions present, a load i
reduction to a mininum output of approximately. 98.5% was connanced at 1628 hours0.0188 days <br />0.452 hours <br />0.00269 weeks <br />6.19454e-4 months <br /> to stabilize mderuser hotwell conditions.
Once corditions in the cordenser hotwell had improved, the Unit returned to full power at 1820 hours0.0211 days <br />0.506 hours <br />0.00301 weeks <br />6.9251e-4 months <br />.
September 16
'Ihe Unit operated at a ncminal value of 100% output for the through remainder of the report period.
Saptember 30 b
h
?
L l
l t
7 l
AVERAGE DAILY UNIT POWER LEVEL j
DOCKET NO.
50-412 3
UNIT BVPS Unit 2 DATE October 4, 1994 COMPLETED BY David T. Jones TELEPHONE (412) 393-7553 MONIH September 1994 I
DAY AVERAGE DAILY PCMER LEVEL DAY AVERAGE DAILY POWER LEVEL
.l (MWe-Net)
(MWe-Net) 5 1
828 17 820 2
831 18 829 3
830 19 830 4
828 20 828 i
5 829 21 825 i
6 828 22 825 i
7 826 23 826 8
822 24 820 t
9 819 25 817 10 824 26 825 11 827 27 827 12 824 28 829 13 816 29 830 t
14 811 30 828 15-807 31 16 813 INSIRUCTIONS On this fom, list the average daily unit p wer level MWe-lkt for each day in the reporting month. Cotipute to the nearest whole megawatt.
l
l OPERATING DATA REPORT DOCKET NO.:
50-412 REPORT DATE:
10/04/94 COMPLETED BY: DAVID T. JONES TELEPHONE:
(412) 393-7553 i
OPERATING STATUS i
'l'.' UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: SEPTEMBER 1994
- 3. LICENSED THERMAL POWER (MWt):
2652 i
- 4. NAMEPLATE RATING (Gross MWe):
923
- 5. DESIGN' ELECTRICAL RATING (Net MWe):
836
- 6. MAX. DEPENDABLE CAPACITY (Gross MWe):
870
- 7. MAX DEPENDABLE CAPACITY (Net MWe):
820
- 8. IF CHANGES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
l
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A i
i THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
720.0 6551.0 60230.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
720.0 6285.2 51615.5
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 1
- 14. HOURS GENERATOR WAS ON LINE:
720.0 6272.0 51268.6
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0 l
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1897976.0 16470364.0 126702249.0'
- 17. GROSS ELECT. ENERGY GEN. (MWH):
624984.0 5467221.0 41119226.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
593348.0 5187063.0 38837342.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 95.7 85.1
- 20. UNIT AVAIIABILITY FACTOR:(PERCENT) 100.0 95.7 85.1
- 22. UNIT CAPACITY FACTOR (DER): PCT 98.6 94.7
- 77. 1
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 4.3 3.1 7
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE,AND DURATION OF EACH):
The Unit is' scheduled to shutdown for its fifth refueline outare on March 24. 1995. The refueline outane is scheduled to last for 60 days.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i
l UNIT SHUTDOWNS AND POWER REDUCTIONS (220%)
Docket No.
__.50 412 Unit Name BVPS Unit #2 Date October 4.
1994 Completed By _ David T.
Jones REPORT MONTH SEPTEMBER 1994 Telephone (412) 393-7553 -
Method of Licensee Duration shutting Event System Component Action to Cause & Corrective No.
Date Typel (Mours)
Reason 2 Down Reactor 3 Report #
code 4 Code 5 Prevent Recurrence NOME I
1 2
3 F-Forced Reason:
4 Method:
S-Scheduled A-Equipment Failure (Explain) 1-Manus' Exhib't F-Instructions for B-Maintenance or Test 2-Manual.,: ram Preparation of Data Entry Sheets C-Refueling 3-Automatic Scram for Licensee Event Report (LER) File 0-Regulatory Restriction (NUREG0161).
4-Cont'd. from Previous Month E-Operator Training & License Exam 5-Reduction F-Administrative 5
9-Other G-Operational Error (Explain)
Exhibit M-Same Source.
M-Other (Explain)
_ _ _._. -...., _. _..,., _ _,. - _... _ _,. _.