ML20076F926

From kanterella
Jump to navigation Jump to search
Requests Meeting to Discuss NRC Policies on Senior Operator Licensing Exam Tech Spec Memorization Requirements.Summary of Tech Spec Sections Covering Required Memorization Encl
ML20076F926
Person / Time
Site: Hatch, Vogtle, 05000000
Issue date: 03/11/1983
From: Beckham J
GEORGIA POWER CO.
To: Wilson B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20076F913 List:
References
NED-83-158, NUDOCS 8306140493
Download: ML20076F926 (2)


Text

,

  • ,t. .Gebfg a Power Company .

333 Pedmont Avenue ATTACHMENT 1 Atlanta, Georg.a 30308 Te:ephone 404 526 7020 Maarg Accress Post Oftco Bor 4545 Attanta Geerg:a 30302 g-Georgia Power J. T. Beckham. Jr.

Vce Pres: cont and Gene'a! Manage Nuclear Genmaton NED-83-158 March 11,1983 Mr. Bruce Wilson, Chief Operator Licensing Branch, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, NW Atlanta, Georgia 30303 NRC DOCKETS 50-321, 50-366 OPERATING LICENSES DPR-57 , NPF-5 EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 NRC DOCKETS 50-424, 50-425 CONSTRUCTION PERMITS CPPR-108, CPPR-109 ALVIN W. V0GTLE NUCLEAR PLANT UNITS 1, 2 SENIOR OPERATOR LICENSING EXAMINATION TECFNICAL SPECIFICATION MEMORIZATION REQUIREMENTS Gentlemen:

During recent examinations at Plant Hatch and Plant Vogtle, Georgia Power Company license candidates were asked questions on their written examinations which we feel were beyond previous requirements to memorize Technical Specifications. The attachment to this letter summarizes what we believe are the sections of T mhnical Specifications which should be memorized. The recent examinations have raised the question of whether the IRC has changed its internal policies concerning Technical Specification memorization requirements. We question if our understanding, as specified in the attachment, satisfies your policy.

Georgia Power Company requests your guidance on the subject. A meeting or a copy of your internal policies would answer our request. Please contact George Bockhold, Jr., Manager Nuclear Training, at (404) 526-7021 to respond to this request.

Very truly yours, t $ _ M_ ,L 1

. T. Beckham, Jr.

/mb 8306140493 830524 PDR ADOCK 05000321 V PDR L _

e . . .

GeorgiaIbwer d

_ Technical Specification Memorization Requirements for Written SRO Examinations Specification Memory Requirement Definition Candidates should be able to define any listed definition.

Safety Limits Candidates should be able to list the safety limits. The bases for the limits should be understood, but exact numbers are not required.

Limiting Safety System Settings Candidates should be able to list the Limiting Safety Systen Settings. The bases for the settings should be understood.

Limiting Conditions For Operation Candidates should know which systems must be operable for each " CONDITION" and which

" ACTION" steps require operator action within one hour of a component failure. The bases for the Limiting Conditions For Operation should be understood, but exact numbers are not required. The following do not have to be' memorized: l (a) ACTION" steps when operator action is not required during the first hour.

(b) " SURVEILLANCE REQUIREENTS" when operator action is not required during each 8 hour-shift.

Adninistrative Controls Candidates should be able to i

list the shift organization requirenents, reportable occur--

rence requirenents and action l- for prompt and 30-day reports, l

safety limit violation action, procedure requirements, and j '

radiation and high radiation l requirements.

1 700775

^

_,,,-y _ - , _ _

. . . . _ . - . - , . - . - , _,m,.,,, , , _ , _ , , _ . - . - - . . . , _ . . . . . . - _ . . . . - , , , , , , . .