Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20078H978 + (05:33:57, 15 December 2024)
- ML20078H972 + (05:33:58, 15 December 2024)
- RC-94-0297, Responds to NRC Ltr Re Violations Noted in Insp Rept 50-395/94-22.Corrective Actions:Becon Field Engineers Review All Working Wp&I at End of Each Shift to Verify That Required Signoffs Have Been Properly Completed + (05:33:58, 15 December 2024)
- ML20078H969 + (05:33:59, 15 December 2024)
- 05000328/LER-1994-015, :on 941208,failure to Perform Hourly Fire Watch as Required by TS Occurred.Caused by Inadequate Mgt Attention for Spent Fuel Pit Rerack Project.Fire Watch Personnel Briefed on Locked Doors + (05:34:04, 15 December 2024)
- ML20078H962 + (05:34:05, 15 December 2024)
- ML20078H967 + (05:34:05, 15 December 2024)
- U-602395, Suppls Util 941228 Response to Concern in NRC Re Individual Sleeping in Radwaste Operations Center & Provides Addl Info About Util Investigation of Incident as Requested by Rj Caniano of NRC on 950105 + (05:34:06, 15 December 2024)
- 05000293/LER-1994-007, :on 941228,primary Containment Pressure Boundary Degraded Due to Uninstalled Instrument Plug.Caused by Personnel Error.Isolation Valves Will Be Installed on Selected Instruments + (05:34:08, 15 December 2024)
- ML20078H943 + (05:34:09, 15 December 2024)
- ML20078H922 + (05:34:10, 15 December 2024)
- ML20078H921 + (05:34:11, 15 December 2024)
- ML20078H915 + (05:34:12, 15 December 2024)
- ML20078H907 + (05:34:13, 15 December 2024)
- ML20078H901 + (05:34:13, 15 December 2024)
- ML20078H897 + (05:34:14, 15 December 2024)
- ML20078H887 + (05:34:15, 15 December 2024)
- ML20078H873 + (05:34:15, 15 December 2024)
- ML20078H870 + (05:34:16, 15 December 2024)
- ML20078H872 + (05:34:16, 15 December 2024)
- ML20078H850 + (05:34:17, 15 December 2024)
- ML20078H839 + (05:34:18, 15 December 2024)
- ML20078H848 + (05:34:18, 15 December 2024)
- ML20078H835 + (05:34:19, 15 December 2024)
- ML20078H820 + (05:34:19, 15 December 2024)
- U-602322, Requests Approval for Use of ASME Section Xi,Div 1 Code Cases N-498-1,N-416-1 & N-517 by Early Oct 1994 in Order to Support Fifth Refueling Outage (RF-5) at CPS Currently Scheduled to Start Mar 1995.Code Cases Encl + (05:34:20, 15 December 2024)
- ML20078H789 + (05:34:21, 15 December 2024)
- ML20078H800 + (05:34:21, 15 December 2024)
- ML20078H786 + (05:34:22, 15 December 2024)
- ML20078H783 + (05:34:23, 15 December 2024)
- ML20078H780 + (05:34:24, 15 December 2024)
- ML20078H782 + (05:34:24, 15 December 2024)
- ML20078H777 + (05:34:25, 15 December 2024)
- ML20078H755 + (05:34:26, 15 December 2024)
- ML20078H743 + (05:34:27, 15 December 2024)
- ML20078H748 + (05:34:27, 15 December 2024)
- ML20078H731 + (05:34:29, 15 December 2024)
- ML20078H739 + (05:34:29, 15 December 2024)
- ML20078H722 + (05:34:30, 15 December 2024)
- ML20078H713 + (05:34:31, 15 December 2024)
- ML20078H699 + (05:34:31, 15 December 2024)
- ML20078H692 + (05:34:32, 15 December 2024)
- ML20078H693 + (05:34:32, 15 December 2024)
- ML20078H685 + (05:34:33, 15 December 2024)
- 05000373/LER-1983-052-03, During Valve Calibr Procedure LES-MS-01,MSIV 1B21-F028C RPS Trip Channel,Limit Switch A2,failed to Operate Properly.Caused by Misalignment of Limit Switch Actuating Arm.Arm Readjusted + (05:34:34, 15 December 2024)
- ML20078H665 + (05:34:35, 15 December 2024)
- ML20078H662 + (05:34:36, 15 December 2024)
- ML20078H628 + (05:34:37, 15 December 2024)
- ML20078H653 + (05:34:37, 15 December 2024)
- TAC:52483 + (05:34:38, 15 December 2024)
- ML20078H622 + (05:34:38, 15 December 2024)
- ML20078H613 + (05:34:39, 15 December 2024)