Rev 1 to Monthly Operating Rept for Aug 1983
ML20078H685
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 09/01/1983
From: Bogart A
FLORIDA POWER CORP.
To:
Shared Package
ML20078H630 List:
References
NUDOCS 8310140266
Download: ML20078H685 (1)


Text

.

OPERATING DATA REPORT T~-

DOCKET NO. 50'-302 DATE Q /1 /R 1

~

COMPLETED BY' D. Bocart.

TELEPHONE (904) 795-6486 OPERATING STATUS

!. Unit Name:

Crystal River Unit #3 Notes WW83

2. Reporting Period: 8/1/83 - 8/31/83 Rev. l.:orrections are
3. Licensed Thermal Power (MWt):

2544 circled.

4. Nameplate Rating (Gross MWe):

890

5. Design Electrical Rating (Net MWe):

825 850

6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

811

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

N/A

9. Power Level To which Restricted,1f Any (Net MWe):

608 MW

10. Reasons For Restrictions,1f Any:

RCP-1C seal is bad.

This Month

.Yr.-to-Dste Cumulative I

11. Hours In Reporting Period 744 5831 567 L1
12. Number Of Hours Reactor Was Critical 711.8 2742 34949.2
13. Readtor Reserve Shutdown Hours 0

0 1280.3

14. Hours Generator On-Line 694.5 2671.9 34138.8'

,15. Unit Reserve Shutdown Hours 0

0 0

16. Gross Thermal Energy Generated (MWH) 1282274 5892839 76417794
17. Gross Electrical Energy Generated (MWH)

[419050)

(2030396)

O5997013)

18. Net Electrical Energy Generated (MWH)

(3977643 (19325M Q467747(b i.*"

19. Unit Service Factor 93.3%.

45.8%

60.2%

93.3%

45.8%

60.2%

i

20. Unit Availability Factor
21. Unit Capacity Factor (Using MDC Net) -
65. 9J)

(2i0. 9%)

55.1%

22. Unit' Capacity Factor (Using DER Net)
64. 8D 60.2 0 52.7%
23. Unit Forced Outage Rate -

6.7%

2.1%

24.6%-

24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):

Maintenance outage to replace RCP-1C' seal' package scheduled for October 1 to last 11 days.

g.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Acitieved INITIAL CRITICALITY 1/14/77 INITIAL ELECTRICITY 1/30/ -

COMMERCIAL OPERATION 3/13/77 8310140266 831011 PDR ADOCK 05000302 R

PDR (Q/77)

I