Final Deficiency Rept DER 83-45 Re Cable Separations in Control Room Panels.Initially Reported on 830707.Procedures Revised to Ref Const Spec 13-EM-306 for Separation Criteria Requirements.Also Reportable Per Part 21
ML20078H662
Person / Time
Site: Palo Verde Arizona Public Service icon.png
Issue date: 09/26/1983
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Sternberg D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
REF-PT21-83 10CFR-050.55E, 10CFR-50.55E, ANPP-27895-BSK, DER-83-45, NUDOCS 8310140259
Download: ML20078H662 (15)


Text

,

TECOVED IUC Anzona Public Service Company P o. BOX 21666 e PHOENIX. ARIZONA 85036 FD CCI -7 Ni 2. t n September 26, 19.83_.

ANPP-27895-BSK/RQF'-

U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, CA 94596-5368 Attention: Mr. D. M. Sternberg, Chief Reactor Projects Branch 1

Subject:

Final Report - DER 83-45 A 50.55(e) Reportable Condition Relating To Cable Separations In Unit 1 Control Room Panels File: 83-019-026; D.4.33.2 Reference : (A) Telephone Conversation between P. Narbut and R. Tucker on July 7, 1983 (B) ANPP-27500, dated August 4,1983 (Interim Report)

Dear Sir:

Attached is our final written report of the Reportable Deficiency under j

10CFR50.55(e), referenced above.

Very truly yours, 6A, SLW-4 E. E. Van Brunt, Jr.

APS Vice President, Nuclear Projects Management ANPP Project Director EEVBJr/RQT:sn Attachment cc: See Attached Page 2 8310140259 830926

~

PDR ADOCK 05000528 S

PDR 37

7.-_

Mr. D. M. Sternberg DER 83-45

'Page 2 cc:

Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 T. G. Woods, Jr.

G. C. Andognini J. A. Roedel D. B. Fasnacht A. C. Rogers B. S. Kaplan W. E. Id e -

J. Vorees J. R. Bynum D. D. Green /P. P. Klute A. C. Gehr W. J. Stubblefield W. G. Bingham R. L. Patterson R. W. Welcher R. M. Grant D. R. Hawkinson L. E. Vorderbrueggen G. A. Fiorelli S. R. Frost J. Se'lf D. Canady Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway - Suite 1500 Atlanta, Georgia 30339 l

I r

I

(

i i

i

FINAL REPORT - DER 83-45 DEFICIENCY EVALUATION 50.55(e)

ARIZONA PUBLIC SERVICE COMPANY (APS)

PVNGS UNIT 1,~ 2 and 3 I.

DESCRIPTION OF DEFICIENCY During startup testing of Unit 1 some of the class IE panels were found to be in violation of separation requirements for field cabling within enclosures per construction specification 13-EM-306

- section 11.0.

The conditions occurred during incorporation of modifications within the panels by Bechtel and APS. The reason is attributed to not having and/or implementing specific construction, start up, and maintenance procedures in regard to separation requirements.

DER 81-53 identified and corrected a similar condition in 1982. As a result of DER 81-53, specification 13-EM-306 Revision 5 was issued to provide revised and clarified separation criteria. At that time, Engineering coordinated the corrective action as documented by 10M-E-9637 and NCR EC-1668 to bring the main control panels into full compliance; however, due to oversights, the clarified specification requirements were not promulgated into the working procedures used by construction, startup, and the station maintenance department.

Subsequently, all safety related cabinets in Unit I were inspected for separation requirements on a case by case basis, and the NCR's were issued for cabinets found in violation of separation requirements and the respective NCR's are listed below:

NCR NO.

Cubicle / Equipment SE-1847 IJ-HCBP-DSL5C SE-1861 IJ-RMC-B05 SE-2045 IJ'RMN-1306E SE-2046 IJ-RMB-04A and B SE-2312 IE-PGE-U36 SE-2313 IE-PBA-S 03I SE-2314 IE-PBA-S03B SE-2352 IE-PBA-S03P SE-2315 IE-PBA-S03R SE-2316 IE-PBB-SO4B SE-2317 IE-PBB-SO41 SE-2318 IE-PBB-SO4K SE-2319 IE-PBB-SO4L SE-2320 IE-PBB-S O 4R SE-2321 IE-PGA-L31E SE-2322 IE-PGA-L33D SE-2323 IE-PGA-L35D SE-2324 IE-PGA-L32E SE-2325 IE-PGB-L32E

Mr. D. M. Sternberg ANPP-DER 83-45 Page 2 NCR No.

Cubicle / Equipment SE-2326 IE-QBA-V01 SE-2333 IJ-S AA-C01-06 SE-2334' IJ-SAA-C01-08 SE-2329 IJ-SAA-C01-05 SE-2330 IJ-SAB-C01-06 SE-2331 IJ-SAB-C01-07 SE-2332 IJ-SAB-C01-08 SE-2335 IJ-SAA-CO3 SE-2336 IJ-SAB-C03 SE-2337 IJ-SAC-C03 SE-2338 IJ-SAD-C03 SE-2339 IJ-SAB-C04 SE-2340 IJ-SAC-C04 SE-2341

'IJ-SAD-C04

-SE-2342 IJ-SBA-C01 SE-2343 IJ-SBB-C01 SE-2344 IJ-SBC-C01 SE-2345 IJ-SBD-C01 SE-2346 IJ-SBA-C02A SE-2347 IJ-SBB-C02A/B SE-2348

_ IJ-S BC-C02 SE-2349 IJ-SBD-C02 SE-2351 IJ-SQA-C05 SE-2327 IJ-SQB-C01 SE-2350 IJ-SQB-C05 SE-2328 IJ-ZJA-C02A SE-2380 IJ'RMA-B01 SE-2379 IJ-RMB-B01 SE-2378 IJ-RMA-B02 SE-2377 IJ-RMB-B02 SE-2376.

IJ-RMC-B02 SE-2375 IJ-RMD-B02 SE-2374 IJ-RME-B02 SE-2373 IJ-RMA-B03 SE-2372 1J-RMB/C-B03 SE-2371 IJ-RMD-B03 SE-2370 IJ-RMB-B04 SE-2369 IJ-RMC-B04 SE-2368 IJ-RMD-B04 SE-2382 IJ-RMA-BOS SE-2383 IJ-RM-B/C-B05 SE-2384 IJ-RMA-B06 SE-2385 IJ-RMB-B06 SE-2386 IJ-RMC-B06

Mr. D.- M. Sternberg ANPP-27895 DER'83-45 Page 3 NCR No.

Cubicle / Equipment SE-2387 IJ-RMD-B06 SE-2388 IJ-RMN-B06E SE-2389 IJ-RMA-B07 SE-2390 IJ-RMB-B07 SE-2391 IJ-RMC-B07 SE-2392 IJ-RMD-B07 II.

ANALYSIS OF SAFETY IMPLICATIONS This condition is evaluated as reportable under the requirements of 10CFR50.55(e). Extensive instances have been identified where electrical isolation and physical separation were inadequate to provide compliance with separation criteria requirements.

Therefore, this condition is evaluated as safety significant.

In addition, this condition is considered as reportable under the requirements of 10CFR Part 21.

III. CORRECTIVE ACTION a) NCR's listed in Section I of this DER will be dispositioned to provide compliance with separation requirements of construction specification 13-EH-306 Section 11.

b) Construction WPP/QCI 255.0, APS start-up procedure. ADIOS and APS maintenance procedure 30AC-9ZZ01 have been revised to specifically reference construction specification 13-EM-306 for separation criteria requirements to preclude recurrence.

c) As documented by APS Corrective Action Request S-83-184-N the respective Engineering, Construction, Startup, Operations, and Quality Control Managers have reviewed this condition and will take action to preclude recurrence. This DER also completes the corrective action required for APS Corrective Action Request C83-94N.

d) Separate inspections for Units 2 and 3 will be scheduled prior to Fuel Load in each unit to identify and correct any cabling separation requirements not in compliance with specification EM-306.

All future nonconformance reports generated as a resuit of these activities will reference this DER.

ATTACHMENT 1 to DER 83-45 i.

Bechtal Powcr Corporation y

Interoffice Memorandum T*

W. J. Stubblefield E.11.03

~MDC 191507

.?

^

10H-E-9637 seart ANPP Job 10407 c"*

March 23, 1982 Electrical Separation in h is Control Board y

W. G. Bingham

)k ff Engineering

~

d LAPD 539 cewiss to N. B. Wilson gj F. Herman R. R. Sciens Jf

~

ter los 4:

[g /

V. Arors All w/enel.

g fvf f ):

s l

~

This will inform you that Engineering has performed a field walkdown to inspect Electrical Separation Problems in Unit I h in Control Boards as a result of Field h uo RE-056, dated October 14, 1981.

Project criteria for wire / cable safety separation is based on meeting Regulatory Guide 1.75 and is noted specifically in Specification 13-EM-306, Section 11.0.

A minimum of six (6) inches between redundant Class IE field cables or internal redundant Class 1E wiring is required when relying on air separation. The safety separation may be reduced to one (1) inch (wire to barrier) if acceptable barriers are utilised. Please be advised that as a result of the field inspection, non-compliances to this criteria l

were discovered.

To date, only an advance copy of NCR EC-1668, which addresses separation in hin Control Boards but doesn't include all the nor.-compliances cited during the field walk, has been received by Engineering. Specifics determined at the time of walkdown are enclosed for your information with Electrical's input provided to aid in determining formal dispositions. For cases where separation non-conformances have not been included in NCRs written to date it is suggested that the field perform the necessary modifications with consent of vendor in order to fix the separation deficiencies or issue appropriate NCRs for specific dispositioning.

We would also like to advise that special precautions be taken to avoid similar separation problems in Units 2 and 3 implemen-tations.

. C. Singham WGB:ST:lec

Enclosure:

Seperation Non-Conformances in NCE (15 pages,1 copy) s.ao-.

. ;ensieanet isne

RECEl'v'EU 4

g 2 'T 'eS3 ATTACHMENT 1 to DER 83-45

  • OPSe CORRECTIVE ACTION REPORT pp qAlQC DEPT.

Page 1

of 2 Classificatiotr of Adverse Condition: (See Back of Form)

CAR No. S-83-184-iN X 50NCO'!PLIANCE Deviation How Discovered:

. NCR Reportsoility Evaluat m: _gpu C Audit No.

H Other Processing NotReportable'@RQ.

83-W/5 Organi:stion Responsible:

Date Discoverec:

Date Reply Due:

Operations /Startup/ Construction 4/18/83 5/18/83

~

Initiator (s):

Controlling Document:

Discussed With:

D. A. Klinger 10 CFR 50, Appendix B, Criterion V " Instruction ; J. Houchen P. W. Sargent/

Procedures and Drawings" and Criterion XVI J. Kelly

" Corrective Action S. Moyer n

"Activiti s affecting Requirement: 10 CFR 50, Appendix B Criterion V states in part:

e Quality shall be prescribed by documented instructions, procedures or drawings of a type appropriate to the circumstances, and shall be accomplished in accordance with these instructions, procedures, or drawings."---

'(Con't on page 2)

Description of Adverse Condition: Action to preclude recurrence of electrical isolation and separation violations as stated in DER 81-53 has not been effective. Electrical isolation and separation violations continue, as documented by NCR's SE-1861, SE-1847 and S-327-1E. Nonconforming conditions are not promptly corrected, as demonstrated by NCR SE-0546, recorded date of 4/12/82 and remains open. DER 81-53 response to preclude recurrence is " compliance with installation specification 13-EM-306 Rev.

5".

(Con't on page 2)

Reco= ended Corrective Action:

Investigate cause and extent of isolation / separation violations; attach findings.

l Ensure existing documents specifically and specially identify when isolation / separation work will be involved and procedures provide instructions to meet isolation / separation requirements.

Corrective Action - Including Action to Prevent Recurrence:

(See Back of Form)

Reference:

B/ANPP-MF-009, dated 5/17/83 Response to CAR S-83-184-N Prepared Ey:

V Authorized By: M Date:

73 63 Corrective Action Evaluation:

Acceptable [ Not Acceptable Verification Required Yl:S Y NO

(

Comments

$!Z7)[f3 Evaluator:

Date:

Verificatlon:

{

Cc-entn Acceptable Not Acceptable Evaluator:

Date:

w-v--,,r w

y-wr vm c--

w..,

.-w-w--i-e


w- +e.e

ATTACHMENT 1 to D]i2 U1W6h$

CORRECTIVE ACTION REPORT CONTINUATION SHEET CAR No. S-83-184-K Page 2 of 2 l

l Organization Responsible:

Date Discovered:

Date Reply Due:

Operations /Startup/ Construction 4/18/83 5/18/83 Requifement (Con't from page 1):

10 CFR 50 Appendix B, Criterion X"I states in part: " Measures shall be established to cssure that conditions adverse to quality, such as---Deficiencies, Deviations---Noncon-formances are promptly identified and corrected---Measures shall assure that the cause of the condition is determined and corrective action taken to preclude repetition.---

Adverse Condition (Con't from page 1):

WPP/QCI 255.0 Rev. 12 Cable Terminations, does refer to specification 13-EM-306, however compliance is deficient / indeterminate as evidenced.hy_3CR':s.

SWP Procedure AD-105 Rev. 2 does not provide instructions or recuirements for Block llD, ceparation criteria affected.

Work Control Procedure 30AC-92201 Rev. 3 does not provide instructions or requirements for work involving cable isolation / separation.

l I

l l

l l

?

vek! kb 1k b-b-

OU.

I

ATTACHKENT 1 to DER @$-63

.4 l

CORRECTIVE ACTION REPORT g

CONTINUATION SHEET CAR No. S-83-184-N Page 3 of Drganization Responsible:

Date Discovered:

Date: Reply Due:

Operations /Starthp/ Construction 4/18/83 5/18/83

+

i Followup Report Evaluation: 7/13/83 1.

Construction responetble items are considered acceptable and no further action is required.

2.

Startup responsible items are considered acceptable. A followup report is required when all Startup personnel have had training conducted. Followup report due by 7/22/83.

3.

Operations responsible items are considered acceptable. A 1311owup report is required when Revision 4 to 30AC-9ZZ01 has been issued.. Followup repcet due by 7/22/83.

4.

When the audit of the Unit I safety related panels is complete, a followup report is required listing SFR/NCR generated. Followup report due by 7/22/83.

5.

Final closure of CAR S-83-184-N is pending completion of items 2, 3 and 4 above and the final disposition of DER 83-45.

l F-SU0AD-16.0-A-(Rev. 0)

ATTACIDENT 2 to DER 83-45 Bechtsi Powar Corporation Engineers-Constructors e

,Palo Verde Nuclear Generating Station P.O. Box 49 Palo Verde, Arizona 85343 B/ANPP-HF-Oll June 28, 1983 j

Arizona Nuclear Power Project P. O. Box 21666 - Mail Station 3003 Phoenix, Arizona 85036 Attention: Mr. G. E. Pankonin PVNGS Startup QA/QC Manager

Subject:

Arizcma Nuclear Power Project Bechtel Job 10407 CAR S-83-184-N Pbilow Up Report File:

0.32

Reference:

1) APS Ietter PVNGS/GEP/M83/320 dated 5/27/83 (Pankonin to Houchen);

Subject:

Startup QA/QC Review / Evaluation of Corrective Action Taken to Resolve Deficiency Identified in CAR S-83-184-N

2) BPC letter B/ANPP-MF-009 dated 5/17/83 (Houchen to Roedel);

Subject:

Response to CAR S-83-184-N

Dear Gil:

l

'Ihis follow up report is being transmitted in accordance with your letter (reference 1) and follows the same sequence as given in our response (refer-ence 2.)

1)

Bechtel Construction Procedures -

WPP/QCI 255.0 was revised by PCN 45, dated May 19, 1983, to speci-l fically refer to Engineering Specification 13-D6-306 for separa-tion requirements: Refer to attachTent #1.

1

June 28, 1983 ATTAg} DENT 2 to DER 83-45 Dschtel Power Corporation

- Page 2 4

i 2

2)

APS Startup Procedures -

Startup Procedure AD-105 "Startup Work Permit" was revised by APCN

  1. 5 dated June 6, 1983, tr. reference Engineering Specification 13-Di-306 for field cabling separation within enclosures.

Refer to Attachment #2.

Training of Electrical Startup personnel was cmpleted on the procedure revision on June 27, 1983.

Training of additional affected personnel will be cm pleted by July 15, 1983.

3)

APS Maintenance Procedures -

Work Control Procedure 30AC-9ZZ01, Revision 4, will be issued by July 5,1983, to reference Engineering Specification 13-D4-306 for field cabling separation within enclosures.

mfer to attachment

  1. 3 for a draft of the procedure revision.

Training of affected personnel was empleted on the draft proce-dure revision on June 23, 1983.

4)

Field Cabling Separation Verification Within Enclosures -

Ehgineering/Startup have started an audit of the Unit I safety related panels using the requimts of Specification 13-DS-306.

i I

'Ibe separation problems identified during the audit will be documented on SFR/NCR's and the corrections will be made before fuel load.

Very truly yours, B1DITEL POWER CORPORATICN lW 1

J. D. Houchen l

Assistant Project Manager 1

JDH:ba oc: (See Page 3) j

0/ANPP-MF-011 ATTAC y 2 to DER 83-45 Dechtel Power Corporation June 28, 1983 Page 3 e

s I

a cc:

G. C. Andognini W. G. Bingham J. R. Bynum J. D. Hayes J. E. Kirby

s. M. Moyers R. K. Nelson J. A. Roedel C. N. Russo W. J. Stubblefield W. H. Wilson

'1he following responsible managers have reviewed this response and will follow up on the outstanding corrective action:

k O.. %. L h m W. G. Bingham Bechtel Project Engineering Manager J. E. Kirby g

APS Startup Manager b+

J. R. Bynun L/

y APS Manager of Nuclear Operations i

1 p,.,,,,

,-,e-


r-

ATTACHMENT 3 to DER 83-45 Bechtel Power Corporation Engineers-Constructors

. Palo Verde Nuclear Generating Station P.O. Box 49 a

Palo Verde. Arizona 85343 B/ANPP-MF-009 May 17, 1983 l.

4 Arizona Nuclear Power Project P. O. Box 21666 - Mail Station 3003 Phoenix, Arizona 85036 Attention: Mr. J. A. Roedel Corporate Quality Assurance Manager

Subject:

Arizona Nuclear Power Project Bechtel Job 10407 Response to CAR S-83-184-N File:

0.32

Dear John:

Meetings have been held with Bechtel Engineering, Bechtel Construction, APS Startup, APS Maintenance and APS Startup QA to discuss the subject CAR. The following corrective action is necessary to address field cabling separation within enclosures:

1)

Bechtel Construction Procedures WPP/QCI 255.0, Rev. 12,

  • Cable Terminations," refers to Engineering Specification 13-h 306, " Installation Specification for Cable Splicing,

.Temination and Supports." Specification 13-DF306 in Section 11.0 sets forth the separation requirements for field cabling within enclosures.

'Ibese separation requirements are naaa by Construction QC when inspect-ing lE cable terminations and the Field Engineer when inspecting Non-lE cable teminations. Construction has given extensive training on this subject and in their judgnent farther training is not necessary.

In order to put additional emphasis on field cabling separation within enclosures, WPP/QCI 255.0 will be revised to specifically refer to 13-W306 for separation requirements. 'Ihis procedure revision will be issued by June 1, 1983.

r&-

9

-+

e t1991

my 17,1983 Bechtel Power Corporation

.. Page 2 ATTACHMENT 3 to DER 83-45 2

2)

APS Startup Procedures Startup Procedure AD-105, "Startup Nbrk Permit," will be revised to reference WPP/QCI 255.0 and Specification 13-D5-306 for field cabling separation within enclosures.

Rese separation requirements will be used by Startup QC when inspecting IE cable terminations and the Startup Engineer when inspecting Non-lE cable terminations.

his procedure revision will be issued by June 1,1983, and training will be given to the affected personnel by July 1, 1983.

3)

APS Maintenance Procedures Work Control Procedure 30AC-9ZZ01 will be revised to reference Speci-fication 13-Di-306 for field cabling separation requirements within enclosures. m is procedure revision will be issued by June 1, 1983, and training will be given to the affected personnel by July 1, 1983.

4)

Field Cabling Separation Verification Within Enclosures Since the foregoing organizations have been doing wiring and termination work within safety-related panels and separation problems are evident; a program is being developed by Engineering to audit Unit 1 safety-related panels using the requirements of Specification 13-Ei-306.

The audit team will be led by Engineering with assistance frcm Startup and Startup QC personnel.

The program will be emplete by June 15, 1983, and the separation audit / corrections will be cmplete before fuel load.

A similar audit is planned for Units 2 and 3 after the associated panel j

modification work is capleted.

Please advise me if you have any questions or ccrments on this response.

Very truly yours, BECHTEL POLER CDRPORATION

\\'%

J. D. Houchen Assistant Project Manaaer JDH:ba cc: (See Page 3) l l

l I

May 17, 1983 Bechtel Power Corporation l

Page 3 ATTACHMENT 3 to DER 83-45

=

l 5

cc:

G. C. Andognini W. G. Bingham J. R. Bynum J. L. Black W. E. Ide W. H. Wilson B. S. Kaplan J. E. Kirby S. M. Moyers G..E. Pankonin T. E. Quiggle C. N. Russo W. J. Stubblefield R. M. Taylor T. G. Woods J. L. Zerucha

'Ihe following responsible managers have reviewed this response and will follow-up on the rrective action:

ft W. G. Bingham l.

%.n Bechtel Project Engineering Manager LJD W. J. Stubblefield V

yl)~

Bechtel Field Construction Manager f /

g

/_

A. di' J. E. Kirby APS Startup Manager k.d h th J. R. Bynum i