ML20078H907
| ML20078H907 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/07/1983 |
| From: | Stolz J Office of Nuclear Reactor Regulation |
| To: | Arkansas Power & Light Co |
| Shared Package | |
| ML20078H909 | List: |
| References | |
| DPR-51-A-081 NUDOCS 8310170100 | |
| Download: ML20078H907 (3) | |
Text
.
~
a 8
UNITED STATES 8
NUCLEAR REGULATORY COMMISSION o
s w= imam. o. c.2a
\\*****/
ARKANSAS POWER & LIGHT COMPANY
~
DOCKET NO. 50 313 ARKANSAS NUCLEAR ONE. UNIT NO.1 AMENDMENT TO FACILITY OPERATING LICENSE 1
Amendnent No. 81 License No. DPR-51
[. The Nuclea~r Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Arkansas Power and Light Company (the licensee) dated August 8, 1983, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; 8.
The facility will operate in confomity with the application.
the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized i
by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and l
l E.
The issuance of this amendment is in accordance,with 10 CPR Part 51 of the Comission's regulations and all applicable requirements i
I have been satisfied.
c e
b 8310170100 831007 PDR ADOCK 05000313 p
2-2.
Accordingly, the license is amend:d by changes to the Technical Specifications as indicated in the attachment to this license '
amendment, and paragraph 2.c.(2) of Facility Operating License No. DPR-51 is hereby amended to read as follows:
Technical Specifications The Technical Specifications contained in Appendices i
A and B, as revised through Amendment No. 81, are hereby -incorporated in the license. The licensee shall operate the facility in accordance with the' Technic:1 Specifications.
3.
This license amendment is e'ffective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY ComISSION Jo :n. F: 4tolz, Chief-Op rating Reacters Br h f4 i
D ision of L'icensing *
Attachment:
Changes to the Technical l
Specifications
j
(
Date of Issuance: October 7, 1983 e
l i
am 9
O O
O e
o e
_.....-y,..,,m,_.,...,,_,,-w.,
_.r....,.,--%m-. -
ATTACHMENT TO LICENSE AMENDMENT N0.81 FACILITY OPERATING LICENSE NO. DPR-81 DOCKET NO. 50-313 Replace the following page of the Appendix "A" Technical Specifications with the enclosed page. The revised page is identified by Amendment number and contains vertical lines indicating the area of change.
Remove Insert 77b 77b e
e e
e e
e o
S e $
e 4
e e
e 9
9 9
e h
9 6
O e
O
,. _,.,, -. _, - _,, _ -. _,.. _.,.. _,,., ~.,, -, - -,,, -, - - - -,,, _,.
,-a_,
Table 4.2-1 ANO-1 CAPSULE ASSEMBLY WITHDRAWAL SCHEDULE AT DAVIS-BESSE 1 CAPSULE INSERTION /WITH0RAWAL ANI-E Has been withdrawn for testing ANI-S Withdraw following ist cycle at Davis-Besse 1 ANI-A Withdraw following 3rd cycle at Davis-Besse 1 ANI-C Withdraw following 7th cycle at Davis-Besse.1 ANI-0 Insert in location YZ (upper) prior l
to 4th cycle at Davis-Besse 1; withdraw following 12th cycle ANI-F' Insert in location YX (upper) prior to 5th cycle at Davis-Besse; withdraw following lith cycle Bases The surveillance program has been developed to comply with the applicable edition of Section XI and addenda of the ASME Boiler and Pressure Vessel Code, Inservice Inspection of Nuclear Reactor Coolant Systems, as required by 10 CFR 50.55a, to the extent practicable within limitations of design, geometry and materials of construction.
The number of reactor vessel specimens and the frecuencies for removing and testing tnese specimens are provided to assure comoliance with the requirements of Appendix H to 10 CFR Part 50.
For the purpose of Technical Specification 4.2.8, the definition of Regulatory Guide 1.16, Revision 4 (August 1975) applies for the term
" commercial operation". Cumulative reactor utilization factor is defined
[(cumulative thermal megawatt hours since attainment of commercial as:
operation at 100% power) x 100] + [(licensed thermal power) x (cumulative hours since attainment of commercial operation at 100% power)].
I I
l 77b Amendment No. 7E 77,81
-.