Forwards Rev 51 to Security Plan.Plan Withheld
ML20078H835
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 01/31/1995
From: Johnson I
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TAC-M65376, TAC-M65377, NUDOCS 9502070053
Download: ML20078H835 (2)


Text

-

/N Commonwealth Edison o

12$ South Clarb street. Chicago, lilinois p

.. g Address Revy to: Post Office Box 767 Chicago, Illinois 60690-0767 January 31,1995 CERTIFIED MAIL U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555

Subject:

LaSalle Nuclear Power Station Units 1 and 2 LaSalle Station Security Plan NRC Docket Nos. 50-373-50-374 TAC Nos. 65376/65377 Enclosed are the original and three (3) copies of Revision 51 of the LaSalle Nuclear Power Station Security Plan. This submittal contains the following changes:

Chapter 1: Clarifies watchman as an unarmed position.

Chapters 3, Reclassifies guard to a member of the security 7, 8, 9,10 organization

& 14 Chapter 6:

Changes " security officer" to " personnel".

Chapter 7:

Eliminates the hourly patrol of vital area doors due to cardreader failure; alarm and lock remain operative.

Changes the patrol of vital area doors due to alarm failure; lock and cardreaders remain operative, from once per hour to four (4) times per shift.

Chapter 12: References Chapter 7 for badge control procedures.

Chapter 14: " Guard" changed to " Security" Appendix B: The age requirement for unarmed security is J

being established at 18 years of age.

The requirement for a polygraph examination is being repositioned to include only our armed personnel.

9502070053 950t3t hDR ADOCK 05000373

,{4 eor

F 1

U.S. Nuclear Regulatory Commission Page Two t

Apoendix 8: The model of_ shotgun is being changed from 870 to 1187.

+

The ability to use simulated equipment i.e,

+

handgun and radio, when performing the agility test.

l Prerequisites of Job Analysis 8.0; Security Control Center, has been expanded to include successful completion of Job Analysis 1.0 through 7.0.

Appendix C: Corrected a typographical error.

Pursuant to 10CFR 50.54(p), the signed original and three copies of the Security Plan revisions are being provided to your office. A copy of this letter and

[

t two copies of the Security Plan revisions are being sent to Region 111.

We have concluded that these changes do not decrease the safeguards j

effectiveness of the plan. These enclosures contain Safeguards Information which must be protected from public disclosure pursuant to 10CFR 73.21.

p i

Sincerely, t

o pwg Irene M. Johnson l

Licensing Operations Manager Enclosurea cc:

John B. Martin (w/two encls.)

THE ENCLOSURE CONTAINS SAFEGUARDS INFORMATION i

Uoon seoaration. this oaae is decontrolled

-