Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079G492 + (04:38:54, 15 December 2024)
- ML20079G484 + (04:39:00, 15 December 2024)
- ML20079G481 + (04:39:01, 15 December 2024)
- ML20079G483 + (04:39:01, 15 December 2024)
- 05000346/LER-1991-002, :on 910901,determined That Surveillances Tests for source-range Neutron Flux & Rate Intruments Not Performed Prior to Entry Into Mode 3.Caused by Inadequate Administrative Controls.Procedure Revised + (04:39:03, 15 December 2024)
- ML20079G476 + (04:39:04, 15 December 2024)
- ML20079G474 + (04:39:11, 15 December 2024)
- ML20079G472 + (04:39:12, 15 December 2024)
- 0CAN099103, Revises ERDS Implementation Schedule Contained in .Software Development Expected to Be Completed by 920430, W/Hardware Installation Completed by 920515.Util Anticipates That ERDS Sys Will Be Operational by 920630 + (04:39:13, 15 December 2024)
- ML20079G453 + (04:39:13, 15 December 2024)
- ML20079G448 + (04:39:14, 15 December 2024)
- ML20079G445 + (04:39:15, 15 December 2024)
- ML20079G447 + (04:39:15, 15 December 2024)
- ML20079G440 + (04:39:16, 15 December 2024)
- ML20079G436 + (04:39:16, 15 December 2024)
- ML20079G427 + (04:39:18, 15 December 2024)
- ML20079G424 + (04:39:19, 15 December 2024)
- ML20079G422 + (04:39:19, 15 December 2024)
- ML20079G413 + (04:39:20, 15 December 2024)
- ML20079G419 + (04:39:20, 15 December 2024)
- ML20079G410 + (04:39:21, 15 December 2024)
- ML20079G402 + (04:39:23, 15 December 2024)
- ML20079G409 + (04:39:23, 15 December 2024)
- ML20079G391 + (04:39:24, 15 December 2024)
- ML20079G400 + (04:39:24, 15 December 2024)
- ML20079G384 + (04:39:25, 15 December 2024)
- NRC-84-0004, Forwards Purge Valve Operability Rept,Snupps Project, Per Licensing Confirmatory Issues 28,II.E.4.2 & B.28,II.E.4.2. Rept Demonstrates Valves Have Capability,W/Margin,To Perform Containment Isolation Function + (04:39:26, 15 December 2024)
- ML20079G378 + (04:39:26, 15 December 2024)
- PLA-1106, Interim Deficiency Rept Re Inconsistencies in Vertical Dynamic Model for Reactor/Control Bldg.Stress Analysis of Typical Floor Slabs & Supporting Beams Showed Adequate Margin to Ensure Integrity.Next Rept Before Fuel Load + (04:39:27, 15 December 2024)
- ML20079G355 + (04:39:27, 15 December 2024)
- ML20079G353 + (04:39:28, 15 December 2024)
- ML20079G342 + (04:39:29, 15 December 2024)
- ML20079G344 + (04:39:29, 15 December 2024)
- W3P83-4133, Forwards Rev 3 to Safeguards Contingency Plan.Rev Withheld + (04:39:30, 15 December 2024)
- ML20079G336 + (04:39:33, 15 December 2024)
- ML20079G331 + (04:39:33, 15 December 2024)
- ML20079G330 + (04:39:35, 15 December 2024)
- TAC:49287 + (04:39:37, 15 December 2024)
- ML20079G324 + (04:39:37, 15 December 2024)
- ML20079G320 + (04:39:38, 15 December 2024)
- ML20079G317 + (04:39:39, 15 December 2024)
- ML20079G318 + (04:39:39, 15 December 2024)
- ML20079G314 + (04:39:41, 15 December 2024)
- 05000289/LER-1982-006-03, /03L-0:on 820427,monitor RM-A9,which Monitors Reactor Bldg Purge Particulate,Iodine & Gaseous Effluents, Valved Out of Svc Due to Improper Valve Line Up.Valve Misalignment Caused by Illegible Valve Position Markings + (04:39:42, 15 December 2024)
- 05000289/LER-1982-006, Forwards LER 82-006/03L-0 + (04:39:43, 15 December 2024)
- ML20079G299 + (04:39:45, 15 December 2024)
- ML20079G301 + (04:39:45, 15 December 2024)
- ML20079G283 + (04:39:46, 15 December 2024)
- 05000333/LER-1982-022-03, /03L-0:on 820501,during Normal Operation,Emergency Diesel Generator D Declared Inoperable W/A Also Inoperable Requiring Reactor Shutdown Initiation.Cause Not Determined. Generators Declared Operable & Returned to Svc + (04:39:48, 15 December 2024)
- ML20079G270 + (04:39:51, 15 December 2024)
- ML20079G271 + (04:39:51, 15 December 2024)
- ML20079G269 + (04:39:52, 15 December 2024)