Text
n y'
Consumers Power Company Generei Off6ces: 1946 West Parnell Road, Jackeen, Mt 40201 * (517) 788-0550 May 26, 1982 James G Keppler, Administrator Region III US Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137 DOCKET 50-255 - LICENSE DPR-20 PALISADES PLANT - RESPONSE TO IE INSPECTION REFORT 82-08 IE Inspection Report No.
0-255/82-08, dated April 26, 1982 reported the results of a surveillance. program inspection conducted in March 1982.
The report contained one item of noncompliance to which a reply is required.
The item of noncompliance and response thereto are as follows:
' Item 1 Title 10, Code of Federal Regulations, Part 50, Appendix E requires, at Paragraph IV.E.9.d, provisions for communications with NRC Head-quarters and the Regional Office Operations Center from stipulated licensee facilities. Such communications shall be tested monthly.
1 i
' Contrary to the above, the' licensee has not performed monthly l
testing of the communications provisions since the effective date of Appendix E of August 1980.
Response to Item 1 A.
Corrective Action Taken and Results Achieved I
l The Emergency Notification System (ENS) telephones were tested in May,1982, and were found to be operating satisfactorily.
i Pending changes to procedures, provisions have been established to ensure this test will be performed on a monthly basis.
4 B.
Corrective Action to Prevent Recurrence A procedure will be developed to require monthly testing of ENS
.. telephones in the Ccatrol Room, Technical Support Center and.
near-site Emergency Operations Facility. To ensure that other requirements of 10 CFR 50 Appendix E have not been overlooked, a review of the Palisades Site Emergency Plan and Emergency Implementation Procedures will be conducted to ensure that l
all applicable Appendix E requirements have been addressed.
8206080424 820604 PDR ADOCK 0500025
,WY 2 8 1982 O
1
.,/
JGKeppler, Administrator 2
Palisades Plant Response to IE Inspection Report 82-08 May 26, 1982 i
i C.
Date When Full Compliance Will be Achieved The corrective actions described above vill be completed by July 31, 1982
)
t.ab edd Brian D Johnson Senior Licensing Engineer l
CC Director, Office of Nuclear Reactor Regulation Director, Office of Inspection and Enforcement NFC Resident Inspector - Palisades
y,*
t CONSUMERS POWER COMPANY PALISADES PLANT IE INSPECTION REPORT 82-08 Docket 50-255 l
License DPR-20 i
j At the request of the Commission and pursuant to the Atomic Energy Act of 195h and the Energy Reorganization Act of 1974, as amended, and the I
Commission's Rules and Regulations thereunder, Consumers Power Company submits our response to IE Inspection Report 82-08, dated April 26, 1982.
CONSUMERS POWER COMPANY BY..
~
J I
R B DeWitt, Vice President Nuclear Operations Sworn and subscribed to before me this 26th day of May 1982.
I e)
HelenIDempski,NotdyPublic Jackson County, Michigan My commission expires December lb, 1983.