OPERATING DATA REPORT I

DOCKET NO.

50-369 DATE 01-13-84

~

COMPLETED BY J. A. Reavis

?j TELEPl!0NE 704-373-7567

[

OPERATING ST ATUS Notes

  • NOTE:

Nameplate Rating I "

McGuire Unit 1 h.. Reporting Per.Deconber 1,1983-Decarber 31, 1983 (Gross MWe) calculated as io u, ;

1450.000 MVA x.90 power 34 H

3. Lice.wed Thennst Power tMWts:

factor per Page lii, 1305*

4. Nameplate Rating (Grow alw ):

NUREG-0020.

e 1180

5. Design Electrical Rating (Net MWe1:
6. Maximum Dependsble Capacity (Grow MWe):

1180

7. Maximum Dependable Capmty (Net MWe):

S. If Chsnges Occur in Capacity itstmys tirems Number 3 Through 7) Since Last Report.Gise Res>nns:

9. Power Level To Which Restricted.lf Any t' Net MWe):

4

10. Reason, For Restrictions. lf Any:

This Month Yr.-r, Date Cumulative 744.0 8 760.0 18 264.0

- 11. Hours in Reporting Period 6J/.4 4 934.9 12 073.1

12. Number Of Hours Resetor Was Critical
13. Reacter Reserve Shutdow111ours
14. lionrs Generstar On Lir.c 687.3 4 856.8 11 949.1

=

15. Unit Resene shutdown flours 2 011 387 13 934 651 27 437 069
16. Gross Thermal Energy Genersted OlWii) 1~. Gross Electriesl Energy Genersted (MWil) 713 913 4 890 574 9 517 165 684 389 4 634 932 8 956 255_
13. Net Electrical Ener;y Generated (MWil)
19. Unit Service Factor 92.4 55.4 65.4 92.4 55.4 65.4
20. Unit Avsi!sbility Factor
21. Unit Cspacity Factor IU3in; MDC Neti 7R O 44.R 41.6 78.0 44.8 41.6
22. Unit Capacity Factor (Using DER Net) 7.6 17.7 20.5
23. Unit Forceu Outace Rate R
24. Shutdown 3 Scheduled Oscr Nest 6 Wnth< (Type.Dste. sod Duration of Esch1:

Refueling - February 26, 1984 - 7 Weeks.

l M? If Shut Down At End Of iteport 1%riod. Estimated Date of Startup:

u;-

26. Units la Test $tstus (Prior to Commercial Operation):

Forecast Achie ed INITI \\ L CRITICA LITY INITI A 1. l' L EC 1 RICI T Y CoststEltCIA L ort.it A fl0N hh 7'I 8401200014 831231 PDR ADDCK 05000369 R

PDR (9/771 Em

AVERAGE DAILY UNIT ?OWER LEVEL 50-369-DCCKET NO.

g3g7 McGuire Unit 1 01-13-84 D ATE 0

COMPLEHD BY

_J.

A. Reavis TELEPHONE 704-373-7567 MONTH he, 1%3 DAY

. AVERAGE DAILY ?OWER LEVEL DAY AVERAGE DAILY POWER LEVEL t>the-Net I

  1. 31We-Neti 231 1

g.

969 3

882 M2 13 3

1 067 972 39 4.

1 066 1 078 20 g

1 093 539

,3 6

1 114 n

36 1 114 1 005 7

,3 3

1 114 4

1 075 9

895 1 07'5 25 10 1 072 1 076 26 11 1 072 498 1 072 12 3

674 g3 E173

9 1 079

.g4 971 1 088 30 g3 969 33 1 116 6

970 INSTRUCTICNS Cn t.".:s for:: :t. !ist :."e ner:ge f::!y =st h :wer :e.<a ;., '.tWe Net : _ r ese- :. -.e.,-- n;.. e:-

-.;te.

.: nearest.wheie. : pw:::.

...-i

y DOCKET NO.-

50-369 UNITSilUTDOWNS AND POWER NEI)UCTIONS UNIT NAME - AGuire 1 DATE 01/13/84 ~-

' COMPl.ETED HY -

.1 A _ Daaw h REPORT MONTil _ December.1983 TEI.EPilONE' 704/373_7s;s7 1

..fg lg 3 3ifk

' t.icensee

.h (ansea co rective No-Ibte i

3y j

jjE Event yy 93 Action tu jU-I'revent Reentrence fE O

j gy, g Repoes u vi O H

-(

6

.l A

CH PUMPXX Repair B feedwater pump controls.

47-p 83-12-01 F

'CC VALVEX

  1. 4 governor valve isolated.

A 48-p 83-12-01 F'

'21 83-12-01 F

15.67 A

3 CH FILTER Clogged air supply fi.lter shut cooling water ISOL valve to B feedwater. pump turbine..

.CC-VALVEX~

  1. 4 governor valve isolated.

A 49-p 83-12-02 F

A CC' VALVEX

  1. 4 governor valye isolated.

50 p 83-12-05

-F A-CH PUMPXX B FWPT speed control: power supply 51-p 83-12-09 F-A CC

VALVEX, breaker tripped due to ground.
  1. 4 governor-valve isolated.

52-p 83-12-09 F

ZZ ZZZZZZ Load follow test.

B 53-p 83-12-12 S

A CC VALVEX

  1. 4 governor valve isolated.

54 p 83-12-13 F

55-p 83-12-14 S

B ZZ ZZZZZZ Load follow test.

.A CC VALVEX

  1. 4 governor valve isolated.

56 p 83-12-14 F

.B ZZ ZZZZZZ Load follow test.

57-p 83-12-14 S

A CC VALVEX

  1. 4 governor valve isolated.

58-p 83-12-15 F

ZZ ZZZZZZ' Load follow test.

B 59 p 83-12-16 S

CC VALVEX

  1. 4 governor' valve Isolated.

A 60-p 83-12-16 F

l I

2 1

4 F: Forced -

Reamn:

Methost:

Exhibit G Insienctions -

S Lheilotet!

A Equipment Failure (lixplain) 14f anual for Picparation of D.ua li Maintenance of Test 2-Manual Scrani.

Entry Sheets l'or I.icensee-C. Refueling 1-Autoniatic Scram.

Event Rel* ort (l.I!R) Fde int! REG-1-Other (lixplain) 01bl1 D.Itegulatory Restiiction 1: Opetafor Training & l.icense Examination F-Administrative thhibit I Same Somee G Ope ational laror (Explam)

I'2/77)

II Other ( Explain)

P 50-369 DOCKET NO.

UNIT SilUTDOWNS AND POWliR REDUCTIONS.

UNIT NAMI: McGuire 1

.DATE. 01/13/84 COMPLETED HY J_ A_ Reavi<t December, 1983

- REPORT MONTil TELEPilONEL 704/373 7567 Licensee

,E-r, h,

.!E 3

) 5'i Cause & Cosrective '

No.

Dne i

5?

j jyE Event 3,7 M _

Action to yE d

3 ;f, g Repint u mo 8O Prevent Recurrente H

u-go B

ZZ ZZZZZZ.

Load follow test.

61-p 83-12-17 S

A CC VALVEX

  1. 4 governor valve isolated.

62-p 83-12 F 63-p 83-12-18 S

B ZZ ZZZZZZ Load follow test.

64-p 83-12-19

.F A

CC VALVEX

  1. 4 governor valve. isolated.

22 83-12-21 F

28.27 A

1 CB PUMPXX Repair reactor coolant drain tank pumps.

A CC VALVEX

  1. 4 governor valve isolated.

i 65 p 83-12-23 F

23 83-12-27 F

12. 77 A

3 HA INSTRU Water shorted the control cards in DEH cabinet.

A CC VALVEX

  1. 4 governor valve isolated.

66 p 83-12-28 F

67-p 83-12-30 F

.A CC VALVEX

  1. 4 governor valve isolated.

t

)

l 1

2 1

-l F: Foreet!

Reason:

Meiluiti:

Exhibit G Imiructions -

A li nipment Failure (Explain)

- I -Man ual fier Preparation of' Data S: Scheduleti i

it Maintenance of Test 2 M inual Scram.

Entiy Shecis for I.icenwe C Refueling 1-Automatic Scram.

Event Report (t.ElO File (NtlRI.G.

40ther (Explain) 01b1)

D. Regulatory Restiiction I:-Opciator Training & License lixamination F. Administ rative 5

Exhibit I - Same Souice G-Opciational lis tor ( Explain)

I'l/77)

Il Other (lixplain)

O

DOCKET No: 50-369 UNIT: McGuire 1 DATE: 01/13/84 NARRATIVE

SUMMARY

Month:

December, 1983 McGuire Unit'l entered the month reduced to 50% power to complete repairs to the "B" feedwater pump controls. Repairs were completed and power increased within a couple of hours. At about 8:00 AM on the 1st., a clogged air supply filter on the "B" feedwater pump turbine cooling water isolation valve caused the pump to trip.. The unit tripped during the attempted runback on steam generator level. The unit was ret.cned to service later the same day.

.ecember 9th. the-unit ranback to 50% power when the breaker supplying power to

.the "B" feedwater pump turbine speed control tripped due to a ground on another component.

December 21st. the unit was shutdown to repair both of the reactor coolant drain tank pumps. Repairs were completed and the unit was back online in just over one day.

December 27th.~the turbine tripped when water leaked into the DEH cabinet and shorted some control cards. The unit was returned to service early the next norning.

Output throughout the month was limited to a maximum of 95% due to ti.e stuck governor valve being isolated. Output was further reduced to 50% each night for a one week long test of the unit's load following abilities.

____-m_

.m.__._

MONTHLY REFUELING INFORMATION REQUEST cGuire Unit-1

1. ' Facility name:

2.

. Scheduled next refueling shutdown:

March 1984 3.

Scheduled restart following refueling:

May 1984 4.

. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? Yes If yes, what will these be?

Technical Specification charges needed to support transition co optimized fuel.

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

No 5.

Scheduled date(s) for submitting proposed licensing action end supporting information: November 1983 6.

Important licensing cor.siderations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

Optimized fuel to be used.

Improved thermal design procedure used in safety analysis.

7.

Number of fuel assemblies (a) in the core:

193 31 (b) in the spent fuel pool:

8.

Present licensed fuel pool capacity:

500 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity:

DUKE POWER COMPANY Date:

January 13, 1984 Name of

Contact:

J. A. Reavis Phone:

OPERATING DATA REPORT 0-370 DOCKET NO.

'DATE 01-13-84 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 OPERATING STATUS

1. Unit Name:

McGuire Unit 2 Notes: Nameplate Rating

2. Reporting Period: Decaribel 1.1983-Decanber 31, 1983 (Gross Mwe) calculated as
3. Licensed Thermal Power (}lwen: 170 1450.000 MVA x.90 power
4. Nameplate Rating (Gross MWe): 1305*

factor per page lii, NUREG-0020-1180

3. Design Electrical Rating (Net 31We):
6. Maximum Dependable Capacity d Gross MWel:
7. Staximum Dependable Capacity (Net MWei:

1180 S. If Changes Occur in Capacity Ratings (!! ems Number 3 Through 7) Since Last Report. Gise Reasons:

9. Power Level To Which Restricted. If Any INet MWe):
10. Reasons For Restrictions. If Any:

This Month Yr..to.Date Cumulative

11. Hours In Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours 14.- Hours Generator On.Line
15. Unit Reserve Shutdown Hours NOT IN COMMERCIAL OPERATION
16. Gross Thermal Energy Generated (MWH) 17 Gross Electrical Energy Generated (MWH)
13. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit Avadability Factor
21. Unit Capacity Factor IUsing MDC Net)
22. Unit Capacity Factor IUsing DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eachi:
25. If Shur Down At End Of Report Period. Estimated Date of ',tartup:
26. Umts in Test Status Prior to Commercial Operations:

Forecast Achieved INITIAL CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION N.177 )

t McGUIRE NUCLEAR STATION Operating Status Report 1.

Personnel Exposure For the month of November, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.

2.

The total station liquid release contribution to whole body dose for November has been compared with the Technical Specifications annual value of 3 mrem; the total release for November was less than 10 percent.

The total station gaseous release contribution to any organ dose for November nas been compared with the Technical Specifications annual value of 15 mrem; the total release for November was less than 10 percent of this limit.

9

l-4

~

DUKE POWER GOMPANY P.O. box 33180 CHAMLOTTE, N.C. 28242 HALH. TUCKER mp,,og M

"~'8 m2.$."/O January 13, 1984 Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Attention: Document Control Desk s

Re: McGuire Nuclear Station Docket No. 50-369, -370

Dear Sir:

Please~iind attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of December, 1983.

Very truly yours, d k<

_y -

- -s Hal B. Tucker JAR:scs s

Attachments cc: Regional Administrator Mr. Ralph Birkel U. S. Nuclear Regulatory Commission Office of Nuclear Reactor Regulation Region II U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 2900 Washington, D. C.

20555 Atlanta, Georgia 30303 Mr. Phil Ross Mr. Bill Lavallee U. S. Nuclear Regulatory Commission Nuclear Safety Analysis Center NNBB-5715 P. O. Box 10412 Washington, D. C. 20555 Palo Alto, California 94303 INPO Records Center Senior Resident Inspector Suite 1500 McGuire Nuclear Station 1100 Circle 75 Parkway Atlanta, Georgia 30339