40 pweurm q,Ce met Pmisay Pe t ON t3 ikx WS Wm yhos A'i-tauna 3!Q1 bypnane M tufM1 W G Hauston, HI M
m, n.~..,
Altil)tiriitiPower tu w cm e October 1, 1991 7,,
,,,, y,, n Docket No. 50-348 10 CFR 2.201 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Joseph H. farley Nuclear Plant, Unit 1 Reply to Notice of Violation Report Number 50-348/91-16-01 NRC Inspection of July 12_- August 19. 1991 Gentlemen:
This letter refers to the violation cited in the subject inspection report.
The violation states:
Technical Specification 6.8.1 requirus that applicable written procedures recommended in Appendix A of Regulatory Guide (kG) 1.33, Revision 2,1978 shall be established, implemented and maintained.
Procedure FNP-0-AP-16, Conduct of Operations - Operations Group, Revision 21, Section 3.2.9.2 requires plant operators to take timely and proper actions that will not create a hazard to safe operations to the facility.
Contrary to the above, on August 2, 1991, at approximately 12:01 a.m. the unit operator in concert with the system operator, without verifying the function of an electrical circuit opened the circuit breaker which supplies power to the "lC" reactor coolant pump breaker indication circuitry.
Opening this breaker caused a reactor coolant pump breaker open signal to be generated in the reactor protection system.
This resulted in an unplanned automatic reactor trip.
This is a Severity Level IV violation (Supplement 1).
Admission or Dental The above violation occurred as described in the subject report.
Reason for Violation This violation was caused by personnel error.
The Plant Operator granted permission to reset the breaker which provides power to the IC RCP breaker position indication contact without verifying the function of the breaker or determining the cause of the apparent tripped condition.
9110070119 911001
,\\
(
PDR ADOCK 0";000J: 4 G Q
PDR I
h
- , Mi - ?? _
~:f:'As.<:
9 j-.,
.,. Wuclear Regulatory Commission Page 2 1' N
[
7,,
. m,v SWT.ccihe 6.t.1190_laken and ResulLLfchieved g
. j,,
x_,
~
u
[m%
,s,ge, i)
The plant was returned to servir.e the followinq day.
$b,,M h4,
m 'ddent.
nW order entry was made informing Operations Staff personnel of e-
$9 Vf4 Y,,.,.l }' y.
- p;N -
^
- ' 4
^(A (pfmtave steos to Aypid further Vjf htions i,
p?
1)
The plant t.psator involved has been counseled.
T
+
2)
This event will be included in the next cycle of licensed and U1 nonlicensed retraining including Operations, Chemistry and Health Physics retraining. This training will include the specific incident and general instruction on the proper decision process which should be
- I,,,,*
utili7ed when a component or system is discovered in an u. expected condition.
3)
A caution label which reads " Opening this breaker may cause a reactor trip" has been placcd on the four associated breakers in Unit ' and four associated breakers in Unit 2.
Date of full Comoliangs March 24, 1992 Affirmatiqn I affirm that this response is true and complete ia the best of by knowledge, infcrmation, and belief. The information t.ontained in this letter is not considereo to be of a proprietary nat.n e.
Respectfully submitted, ALABAMA POWER COMPANY cf. $ hoM.~fC W. G. Hairston, 111 WGH, Il!/B;iW: map 1066 cc: Mr. S. D. Ebneter