Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079L176 + (04:15:32, 15 December 2024)
- ML20079L169 + (04:15:33, 15 December 2024)
- ML20079L163 + (04:15:33, 15 December 2024)
- ML20079L162 + (04:15:34, 15 December 2024)
- ML20079L161 + (04:15:34, 15 December 2024)
- ML20079L159 + (04:15:35, 15 December 2024)
- ML20079L157 + (04:15:48, 15 December 2024)
- ML20079L155 + (04:15:49, 15 December 2024)
- ML20079L151 + (04:15:49, 15 December 2024)
- PY-CEI-NRR-1379, Proposed Tech Specs 3.1.3.2, Control Rod Max Scram Insertion Times, Clarifying Under What Conditions Shutdown of Plant to Hot Shutdown Is Required + (04:15:50, 15 December 2024)
- ML20079L150 + (04:15:50, 15 December 2024)
- 0CAN109114, Advises That Special Amend 9A Issued to SAR to Address Generic Ltr 86-10 Re Addition of Fire Protection Program Into SAR & Generic Ltr 88-12 Re Transfer of Applicable Fire Protection Tech Specs Into SAR + (04:15:51, 15 December 2024)
- ML20079L136 + (04:15:51, 15 December 2024)
- ML20079L122 + (04:15:58, 15 December 2024)
- ML20079L119 + (04:16:00, 15 December 2024)
- AECM-84-0010, Submits Info Re Knowledge & Use of Taiwan Power Co Kuosheng Nuclear Station Operating Experience,In Response to NRC Informal Request.Startup Test Procedures & Sys Operating Instructions Changed as Result of Info Exchange + (04:16:01, 15 December 2024)
- ML20079L118 + (04:16:01, 15 December 2024)
- AECM-84-0033, Forwards First of Several Submittals Intended to Demonstrate Justification for Control Room Envelop Inleakage Higher than Originally Assumed in Fsar.Wind Tunnel Testing Complete. Results Being Evaluated + (04:16:02, 15 December 2024)
- BECO-91-146, Forwards Description of Util Plans for Implementation of Emergency Response Data Sys,Per Rev 1 to NUREG-1394.Station Operating,Emergency Planning & Engineering Procedures Will Be Revised for Conformance w/10CFR50,App E + (04:16:02, 15 December 2024)
- ML20079L105 + (04:16:03, 15 December 2024)
- JPN-91-062, Advises That Phase II of Control Room Enhancement Program Completed,Per NRC 910517 Request for Revised Implementation Schedule for Procedure Revs + (04:16:04, 15 December 2024)
- ML20079L101 + (04:16:04, 15 December 2024)
- ML20079L097 + (04:16:05, 15 December 2024)
- ML20079L098 + (04:16:05, 15 December 2024)
- ML20079L095 + (04:16:06, 15 December 2024)
- ML20079L091 + (04:16:07, 15 December 2024)
- ML20079L080 + (04:16:13, 15 December 2024)
- ML20079L081 + (04:16:13, 15 December 2024)
- ML20079L071 + (04:16:20, 15 December 2024)
- ML20079L065 + (04:16:21, 15 December 2024)
- ML20079L055 + (04:16:22, 15 December 2024)
- PY-CEI-NRR-1405, Advises That Rev 4 to Emergency Procedure Guideline on Secondary Containment Control Incorporated Into Plant Instructions,Per Util 890626 & s & Sser 8 + (04:16:22, 15 December 2024)
- ML20079L044 + (04:16:29, 15 December 2024)
- 0CAN109110, Forwards Rev 14 to ANO QA Manual Operations + (04:16:30, 15 December 2024)
- ML20079L039 + (04:16:31, 15 December 2024)
- ML20079L040 + (04:16:31, 15 December 2024)
- ML20079L034 + (04:16:32, 15 December 2024)
- ML20079L031 + (04:16:32, 15 December 2024)
- ML20079L028 + (04:16:33, 15 December 2024)
- ML20079L019 + (04:16:45, 15 December 2024)
- ML20079L015 + (04:16:46, 15 December 2024)
- ML20079L016 + (04:16:46, 15 December 2024)
- ML20079K984 + (04:16:47, 15 December 2024)
- 1CAN032001, Supplemental Information Related to License Amendment Request to Revise Loss of Voltage Relay Allowable Values + (04:16:48, 15 December 2024)
- ML20079K966 + (04:16:55, 15 December 2024)
- 05000416/LER-1982-159, Forwards LER 82-159/03L-0 + (04:16:56, 15 December 2024)
- FVY-82-114, Responds to NRC Re Violations Noted in IE Insp Rept 50-271/82-14.Corrective Actions:Line Above Catwalk Covered W/Lead Blanket Shielding Reducing Dose Rate on Catwalk to Half Original Level + (04:16:56, 15 December 2024)
- RBG-16-702, Forwards Addl Info Re FSAR Changes & Supplemental Clarifications to Previously Submitted Responses,Per 820202 & 831114 Requests.Fsar Changes Will Be Included in Next Amend + (04:16:57, 15 December 2024)
- ML20079K944 + (04:17:01, 15 December 2024)
- ML20079K939 + (04:17:08, 15 December 2024)
- ML20079K931 + (04:17:19, 15 December 2024)
- 05000416/LER-1982-155, Forwards LER 82-155/03L-0 + (04:17:26, 15 December 2024)