Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079P227 + (03:56:41, 15 December 2024)
- ML20079P222 + (03:56:42, 15 December 2024)
- ML20079P224 + (03:56:42, 15 December 2024)
- ML20079P204 + (03:56:44, 15 December 2024)
- ML20079P211 + (03:56:44, 15 December 2024)
- ML20079P202 + (03:56:47, 15 December 2024)
- ML20079P200 + (03:56:48, 15 December 2024)
- ML20079P198 + (03:56:48, 15 December 2024)
- 05000395/LER-1983-009, Forwards LER 83-009/03L-0.Detailed Event Analysis Encl + (03:56:50, 15 December 2024)
- ML20079P195 + (03:56:50, 15 December 2024)
- ML20079P192 + (03:56:51, 15 December 2024)
- ML20079P190 + (03:56:52, 15 December 2024)
- ML20079P185 + (03:56:53, 15 December 2024)
- ML20079P187 + (03:56:53, 15 December 2024)
- ML20079P180 + (03:56:54, 15 December 2024)
- ML20079P179 + (03:56:55, 15 December 2024)
- 05000416/LER-1983-041-03, /03L-0:on 830131,maint Personnel Began Opening Eight Penetrations in Control Bldg to Allow Conduit Routing. Caused by Planned Maint.Hourly Fire Watch Conducted on Each Penetration.Updated Rept Will Be Submitted on 830501 + (03:57:02, 15 December 2024)
- ST-HL-AE-3910, Special Rept:On 911006,standby Diesel Generator 21 Tripped & Coasted to Stop.Caused by Malfunction in Amerace Relays in 62CL Circuit Due to End Life.Relays Replaced + (03:57:03, 15 December 2024)
- ML20079P173 + (03:57:04, 15 December 2024)
- ML20079P175 + (03:57:04, 15 December 2024)
- ML20079P170 + (03:57:05, 15 December 2024)
- ML20079P169 + (03:57:06, 15 December 2024)
- ML20079P167 + (03:57:06, 15 December 2024)
- ML20079P166 + (03:57:07, 15 December 2024)
- ML20079P165 + (03:57:08, 15 December 2024)
- ST-HL-AE-3903, Suppl to Special Rept:On 901126,fuel Oil Leak Noted at Injection Pump 1L of Standby Diesel 23.Caused by Crack on Threaded Portion of Delivery Valve Holder.Injection Pump Delivery Valve & Valve Holder Replaced on 901127 + (03:57:09, 15 December 2024)
- ML20079P159 + (03:57:10, 15 December 2024)
- ML20079P158 + (03:57:10, 15 December 2024)
- 05000416/LER-1983-041, Forwards LER 83-041/03L-0 + (03:57:17, 15 December 2024)
- ST-HL-AE-3921, Submits Special Rept Re Tube Plugged in SG 2D.Tube Experienced anti-vibration Bar Wear of 38% Through Wall Over Two Fuel Cycles of Operation.Tube Wear Did Not Exceed TS Limit of 40% + (03:57:18, 15 December 2024)
- ML20079P144 + (03:57:19, 15 December 2024)
- ML20079P141 + (03:57:19, 15 December 2024)
- ML20079P133 + (03:57:20, 15 December 2024)
- ML20079P121 + (03:57:21, 15 December 2024)
- ML20079P119 + (03:57:21, 15 December 2024)
- ML20079P113 + (03:57:22, 15 December 2024)
- RBG-35-877, Forwards Nonproprietary Suppl 1 to EA-PT-91-0003-S, River Bend Station Plant Transient Analysis Methodology - Delta Methodology & Addl Benchmarks + (03:57:22, 15 December 2024)
- ML20079P105 + (03:57:23, 15 December 2024)
- 05000362/LER-1983-003-03, /03L-0:on 830118,pressurizer Safety Valve Position Indicators Declared Inoperable.Caused by Poorly Attached Position Indication Brackets.Brackets Replaced & After Functional Test & Calibr,Indicators Declared Operable + (03:57:25, 15 December 2024)
- ML20079P101 + (03:57:26, 15 December 2024)
- ML20079P099 + (03:57:26, 15 December 2024)
- ML20079P098 + (03:57:27, 15 December 2024)
- 05000362/LER-1983-003, Forwards LER 83-003/03L-0 + (03:57:28, 15 December 2024)
- ML20079P092 + (03:57:28, 15 December 2024)
- ML20079P076 + (03:57:29, 15 December 2024)
- L-83-103, Responds to IE Bulletin 82-04, Deficiencies in Primary Containment Electrical Penetration Assemblies. No Bunker- Ramo Electrical Penetrations Installed at Facility + (03:57:30, 15 December 2024)
- ML20079P072 + (03:57:30, 15 December 2024)
- ML20079P067 + (03:57:31, 15 December 2024)
- ML20079P068 + (03:57:31, 15 December 2024)
- ML20079P056 + (03:57:32, 15 December 2024)
- 05000416/LER-1983-044-99, /99X-0:on 830124,equipment Hatch on Auxiliary Bldg 139 Ft Elevation West Corridor Removed.Caused by Need to Transport Matls to 119 Ft Elevation for Installation of Drywell Chiller Sys + (03:57:33, 15 December 2024)