Requests That Simultaneous Review of Both Facility Tech Specs Be Performed in Interest of Standardization & Review Efficiency
ML20079P101
Person / Time
Site: Wolf Creek, Callaway, 05000000
Issue date: 03/02/1983
From: Petrick N
STANDARDIZED NUCLEAR UNIT POWER PLANT SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
References
SLNRC-83-011, SLNRC-83-11, NUDOCS 8303040524
Download: ML20079P101 (2)


Text

-.. - __.

A r-94UPPS Standardized Nuclear Unit Power Plant System March 2, 1983 5 Choke Cherry Road nock me.ueryi.s 20sso SLNRC 83- 011 FILE: 0543 (301186b8(Ho SUBJ: SNUPPS Technical Specification Review Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Re: Docket Nos. STN 50-482, STN 50-483 Ref: 1. KMLNRC 82-230 dated 8/5/82

2. ULNRC-564, dated 6/29/82
3. SLNRC 82-049, dated 12/15/82

Dear Mr. Denton:

The referenced letters transmitted material for the Callaway Plant and Wolf Creek Generating Station draft Technical Specifications. Last summer, the NRC staff agreed to perform a review of those sections of the draft Technical Specifications common to both SNUPPS units (Callaway and WolfCreek).. The simultaneous review of the Technical Specifications for both units was explored since it would make the most effective use of NRC and SNUPPS staff time.

Through further discussions with the NRC staff, it is now apparent that if the entire Technical Specification review is not completed through the

" proof and review" stage at the same time for Callaway and Wolf Creek, then the efficiency gained by applying the Technical Specification review of the first SNUPPS unit to the second unit will be lost. The portions of the proposed Technical Specifications which are not common between Callaway and Wolf Creek are not extensive. These site unique portions are related to the environs of the two sites such as the lake and asso-ciated systems at Wolf Creek versus the cooling tower and UHS pond and associated systems at Callaway. There are also some differences in organizational structure and operational philosophy.

It is requested that a simultaneous review of the Callaway and Wolf Creek Technical Specifications be performed in the interest of stan-dardization and review efficiency.

Very truly yours, f

4MNCfv w __a Nicholas A. Petrick JHR/dck/Sa3 cc: Page Two

(

8303040524 830302 4

PDR ADOCK 05000482 A

PDR 1

O SLNRC 83- 011 Page Two l

l cc:

J. Holonich, NRC G. Edison, NRC D. T. McPhee, KCPL G. L. Koester, KGE D. F. Schnell, UE