Forwards Procedure, Cable Qualification Test Program Outline,Secondary Containment for Brunswick Steam Electric Plant - Units 1 & 2
ML20079P113
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 02/28/1983
From: Hurford W
CAROLINA POWER & LIGHT CO.
To: Vassallo D
Office of Nuclear Reactor Regulation
Shared Package
ML20079P116 List:
References
LAP-83-21, NUDOCS 8303040529
Download: ML20079P113 (2)


Text

-

Cp&L '

Carolina Power & Light Company FEB 281983 SERIAL: LAP-83-21 Director of Nuclear Reactor Regulation Attention: Mr. D. B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing United States Nuclear Regulatory Commission Washington, DC 20555 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 DOCKET NOS. 50-325 AND 50-324 LICENSE NOS. DPR-71 AND DPR-62 ENVIRONMENTAL QUALIFICATION DRAFT TEST PROGRAMS FOR RAYCHEM CABLE

Dear Mr. Vassallo:

On November 30, 1982, a meeting was held with representatives from Carolina Power & Light Company (CP&L), Raychem Corporation, and the Nuclear Regulatory Commission (NRC) concerning the use of certain Raychem/Flamtrol cable in use at the Brunswick Steam Electric Plant, Unit Nos. I and 2.

Subsequently, in a letter dated December 15, 1982, CP&L committed to perform environmental qualification testing of the Raychem cable in question (unshielded multiconductor cable rated at 1000 V having a combined insulation thickness of 120 mils or greater).

Pursuant to this commitment, CP&L is herewith submitting copies of the draft environmental qualification test program outlines concerning the Raychem cable in question for Staff review and comment. Attached are ten copies each of the draf t Cable Qualification Test Program Outline, Secondary Containment (Enclosure 1) and the draf t Cable Qualification Test Program Outline, Primary Containment (Enclosure 2). Following the receipt of the Staff's comments on the draf t test program outlines, CP&L will finalize the qualification test programs and will initiate qualification testing. As 4 previously discussed with members of the Staff, CP&L requests the opportunity to meet and discuss any NRC comments concernitg the draft qualification test program outlines. In particular, we request the participation of members of the NRC Environmental Qualification Branch at such a meeting to assure that we have a clear understanding of any technical comments made by the Staff.

Therefore, we would like to propose a meeting with the Staff on Tuesday, March 8, 1983 to discuss the enclosed draft test program outlines. We request 8303040529 830228 PDR ADOCK 05000324 P

PDR 411 Fayetteville Street e P. O. Box 1551

  • Raleigh, N. C. 27602 1

- - .-. .- . . _ . . - ._. - _. _ _ - ~. _ . - , . . - .

D. B. Vassallo that you advise us of the suitability of this meeting or suggest an alternative schedule as soon as possible so that appropriate arrangements may be made.

Yours very truly, l

Manager Technical Services WRM/ mag (6177WRM)

Enclosures cc: Mr. E. L. Jordan (NRC)

Mr. R. G. Lagrange (NRC)

Mr. D. O. Myers (NRC-BSEP)

Mr. J. P. O'Reilly (NRC-RII)

Mr. S. D. MacKay (NRC) 4