ML20079P056
| ML20079P056 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 11/30/1983 |
| From: | Downing G, Murray T TOLEDO EDISON CO. |
| To: | NRC |
| Shared Package | |
| ML20079P041 | List: |
| References | |
| PROC-831130-02, NUDOCS 8401310070 | |
| Download: ML20079P056 (3) | |
Text
.
1 n._
- THE TOLEDO IDISON COMPANY Q
DAVIS-BESSE NUCLEAR PCWER STATION E}2KGENCY PLAN IMPLEM.NG PROCEDUP.ES
_s REVISION INDEI i
PAGE REVISION PROCEDURES REVISION TEMPORARY EDIFICATIONS 1
0 EI 1300.00 4
El 1300.01 5
f II 1300.02 4
EI 1300.03 4
EI 1300.04 4
5 EI 1300.05 4
EI 1300.06 4
T-7553 EI 1300.07 4
T-7104 EI 1300.08 6
T-7400 0
EI 1300.09 1
~~
EI 1300.10 1
EI 1300.11 1
EI 1300.12 3
1 i.
i f! '..v/
0401310070 g4oggg Revision 33
{DRADOCK 05000346 PDR November, 1963
..n.
-;---.-u..
Dt RCUTiON h)
_ Original, Reeponsi7fD Sectiom Head A1 t Pc. Coov. M.ri.r Pii.
n COPIES 70 SE MODIPIED POR IMMEDIATE IMPLEMENTATION i
, DAVIS SESSE NUCLEAR POWER STATION. UNIT 1
- ' ' ~
TEMPORARY MODIFICATION REQUEST Q
ED 6926 SECTION 1 83tOCEO,LJRE TITLE ANO NUMJER c
A cr'y EZ /MCe Cb
/W) idt0'.- 69%
REASON POR CHANGE 5
C.6 z ff)p,& G M Af/th)#~ L L:a bach Lar.L % L %
ahe.J'Anu/% m&eace &~ ~4 c2L~&
as a oc& &.d g.
CHANGE S e.e. fin 3.I sl.n. del 4 :
s N Weea 73e CSC Is k k a
5, I L 3%. S/x.,
cf 7%a SM~ MRe.e E%meh%.
6,s4 &p J-awl DJ s, eg a c.mect J.
se.c kr 5. 5. 5 s lede, have E 0 $re.al, s d uce dced:
m2 s& yA b VN &$
"ef >% SbAk
%mee. de3hTab! e beJ Nsa.:l OSCs k y.
d
>4 A a
L tS PROCEDURE REVISION REQUIRED PREPARED hV DATE
~
APPROV ED mv j/
DATE
+r1 M -
in-a >-7s DATE APPROVED BY
(~ ~RECOM~7 taw 0
,ou,pa
~~
NDED SY (SRS Chelemy,)
DATE p=x
.,,)u OA APPROVED SY (Manager of Queitty Aesvvence)
DATE
'~I APPROVED BY (Station SuperInw=1sent)
DATE t il o i t3 n fy)^ ' -
p
-.~.
-v-*
h6-
<h DAVIS-BESSE REVISION COVER SHEET O
v
(
November 3, 1983 DATE lbd 4/ d8b
~
TO:
FROM: EMERG PLANNING & PP2PAREDNESS SUPV.
SUBJECT:
Davis-Besse EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual Changes This letter transmits additions and revisions to the Davis-Besse EMERGENCY PLAN IMPLEMENTING PROCEDURES Manual., Control Copy 8 M.
Instructions for the material are as follows:
REMOVE AND RETURN INSERT Revision Index, Revision 32 Revision Index, Revision 33 T-7553 in front of EI 1300.06 Date Revision Entered Addressee Signature RETURN TO THE OFFICE mal'AGER STOP 83050
[
4 S
\\
ys0,2 wccm,__qm-3 CV q
e-,
REGULATORY INFORMAT!ON DISTRIBUTION SYSTEM (FIDS)
ACCESSION NbR2 M Duc.DATE8 03/11/01 liOTARIZED8 NO DOCMET O
'FACIL:50-346 Davis-ees., naciear no er Station, Unit 1, Toiee eai 05000346 AUTH.NAME AUTHOR AFFILIATION 00hh1NG,G.
Toledo tdison Co.
MURRAY,T.D.
Toleco Edison Co.
RECIP.NAME RECIFIEN! AFFILIATION NRC - No Detailad Affiliation Given
SUBJECT:
Central Files version of Temporary Change T-7553 to Emergency Plan implementing Procecure El 1300.06,
" Operations Support Ctr Activation." W/831103 Itr & R v 33 to rev index.
COPIES RECEIVED:LTR.!_ ENCL DISTRIBUTION CODE: X005S TITLE: Emerg Plan (CF Avail)
NOTES:AEOD/Ornstein 1cy.
05000346 HECIPIENT COPIES RECIPIENT COPIES ID CODE /NAME LTTR ENCL 10 CODE /NAME LTTR ENCL NRR ORB 4 BC 1
0 DEAGAZIO,A.
01 1
1 INTERNAL: iguivkW g 02 1
1 FEMA TECH HAZO9 1
1 1;,vcrunitPB 03 2
2 IE/DEPER/IRB 1
1 NRR/OSI/AEG 1
1 NRR/DSI/RAB 1
0 REG FILES 07 1
1 NOTES:
1 1
{
1
(
TOTAL NUMBER OF COPIES HEuu1 RED: LTTR 11 ENCL
._