Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20080C687 + (03:27:08, 15 December 2024)
- ML20080C686 + (03:27:09, 15 December 2024)
- 05000457/LER-1994-009-10, :on 941113,discovered That Monthly SI Accumulator Isolation Valve Surveillance Not Performed Due to Personnel Error.Limited Personnel W/Capability to Change/ Delete Predefines + (03:27:11, 15 December 2024)
- ML20080C683 + (03:27:12, 15 December 2024)
- ML20080C682 + (03:27:12, 15 December 2024)
- ML20080C681 + (03:27:13, 15 December 2024)
- ML20080C679 + (03:27:13, 15 December 2024)
- ML20080C673 + (03:27:14, 15 December 2024)
- ML20080C675 + (03:27:14, 15 December 2024)
- BSEP-94-0498, Monthly Operating Repts for Nov 1994 for Brunswick Steam Electric Plant Units 1 & 2 + (03:27:15, 15 December 2024)
- ML20080C668 + (03:27:16, 15 December 2024)
- ML20080C661 + (03:27:16, 15 December 2024)
- ML20080C660 + (03:27:17, 15 December 2024)
- AECM-83-0424, Forwards Request for Relief from ASME Section XI Code Requirements for Preservice Insp of Nozzle Inside Radius Section of RHR Hx.Expenditure to Remove & Replace Insulation Impractical + (03:27:18, 15 December 2024)
- ML20080C654 + (03:27:18, 15 December 2024)
- ML20080C652 + (03:27:19, 15 December 2024)
- ML20080C634 + (03:27:20, 15 December 2024)
- ML20080C641 + (03:27:20, 15 December 2024)
- ML20080C621 + (03:27:21, 15 December 2024)
- 05000260/LER-1983-083-03, /03L-0:on 831229,during Normal Operation,Hydrogen Analyzer B Hydrogen Sample Inlet Pump Discovered Inoperable. Caused by Seized Bearing Due to Improper Bearing Clearance in Metal Bellows Corp Motor Pn 25626 + (03:27:22, 15 December 2024)
- ML20080C616 + (03:27:23, 15 December 2024)
- ML20080C612 + (03:27:24, 15 December 2024)
- ML20080C613 + (03:27:24, 15 December 2024)
- ML20080C611 + (03:27:25, 15 December 2024)
- ML20080C609 + (03:27:25, 15 December 2024)
- ML20080C606 + (03:27:26, 15 December 2024)
- JAFP-94-0598, Monthly Operating Rept for Nov 1994 for Ja FitzPatrick Nuclear Power Plant + (03:27:27, 15 December 2024)
- ML20080C602 + (03:27:27, 15 December 2024)
- ML20080C597 + (03:27:28, 15 December 2024)
- ML20080C596 + (03:27:28, 15 December 2024)
- RC-94-0316, Monthly Operating Rept for Nov 1994 for Virgil C Summer Nuclear Station Unit 1 + (03:27:29, 15 December 2024)
- ML20080C593 + (03:27:30, 15 December 2024)
- ML20080C591 + (03:27:30, 15 December 2024)
- ML20080C587 + (03:27:31, 15 December 2024)
- ML20080C590 + (03:27:31, 15 December 2024)
- ML20080C577 + (03:27:33, 15 December 2024)
- ML20080C576 + (03:27:33, 15 December 2024)
- ML20080C573 + (03:27:34, 15 December 2024)
- ML20080C569 + (03:27:35, 15 December 2024)
- 05000440/LER-1994-022, :on 941111,determined That Testing of Diesel Generators Did Not Meet Definition of Staggered Test Basis. Caused by Failure of Surveillance Test Program to Properly Schedule DG Testing.Testing for DG Revised + (03:27:36, 15 December 2024)
- ML20080C560 + (03:27:37, 15 December 2024)
- 3F0284-01, Supplemental Application to Amend License DPR-72,consisting of Tech Spec Change Request 96 Re Intake Canal Dimensions. Requests Amend Be Issued Prior to June 1985 Canal Survey + (03:27:38, 15 December 2024)
- ML20080C558 + (03:27:38, 15 December 2024)
- ML20080C547 + (03:27:39, 15 December 2024)
- ML20080C542 + (03:27:40, 15 December 2024)
- ML20080C544 + (03:27:40, 15 December 2024)
- RBG-16-933, Forwards Responses to Auxiliary Sys Branch Draft SER Open Items,Including MSIV Leak Rate,Compressed Air Supply Testing & Equipment & Floor Drainage Sys.Indicated Info Will Be Included in Next FSAR Amend + (03:27:41, 15 December 2024)
- ML20080C539 + (03:27:41, 15 December 2024)
- ML20080C524 + (03:27:42, 15 December 2024)
- ML20080C520 + (03:27:43, 15 December 2024)
- ML20080C523 + (03:27:43, 15 December 2024)
- ML20080C513 + (03:27:44, 15 December 2024)