ML20080C524
ML20080C524 | |
Person / Time | |
---|---|
Site: | Oconee |
Issue date: | 06/10/1983 |
From: | James Smith DUKE POWER CO. |
To: | |
Shared Package | |
ML16162A486 | List: |
References | |
PROC-830610-01, NUDOCS 8308260273 | |
Download: ML20080C524 (80) | |
Text
- - ----------
DUKE COMPANY
. POWER OCONEE
- NUCLEAR '
STATION )
I IMPLEMENTING PROCEDURES T
m
'l-1 ID;!r,E POWE) l APPROVED:
QVM J. & S: hits, Station Manager b
Date A$ proved
_ tu, . In 1on Revision 83-4 Effective Date June 10, 1983 D DO K O O 9 F PDR
1
,m
, . Page 3 Table of Contents (Implementing Procedures - Continued) i HP/0/B/1009/12 Distribution of Potassium Iodide Tablets in the Event of a Radioiodine Release - (04/13/83)
HP/0/B/1009/13 Procedure for Implementation and Verification for the Availability of a Back-Up Source of Meteorological Data - (2/12/83)
HP/0/B/1009/14 Project Offsite Dose from Releases other than Through a Vent - (12/20/82)
HP/0/B/1009/15 Procedure for Sampling and Quantifying High Level Gaseous Radiciodine and Particulate Radioactivity - (1-25-83)
HP/0/B/1009/16 Procedure for Emergency Decontamination of Personnel and Vehicles on.-site and from Off-site Remote Assembly Area - (9/16/82)
IP/0/B/1601/03 Environmental Equipment Checks - (12/08/82) e' CP/3/A/2002/04C 1 Operation Procedure for Post-Accident Liquid Sampling (PALS) System (4/21/83)
HP/1/A/1009/17 Operating Procedure for Post-Accident Contain-ment Air Sampling System (5/17/83)
HP/2/A/1009/17 Operating Procedure for Post-Accident Contain- ,
ment Air Sampling System (5/17/83) ,
HP/3/A/1009/17 Operating Procedure for Post-Accident Contain- i ment Air Sampling-System (5/17/83) a Revision 83-4 June 10, 1983 ,
- - -e CONTROL COPY g,,
'^ Form SPD-1002-1 l l
DUKE POWER COMPANY (1) ID No: HP/i/A/1009/17 PAOCEDURE PREPARATION Change (s) 2 to )
PROCESS RECORD NA Incorporated (2) STATION: Oconee (3) PROCEDURE TITLE: Operating Procedure for Post-Accident Centainment Air Sampling System (4) PREPARED BY: (1!\ m DATE: 5 - Ls 9 3 (5) REVIEWED BY: erkC- - ~DATE: 6"[bb N/R:
Cross-Diaciplinary Ravi By:
(6) TEMPORARY APPROVAL (IF NECESSARY):
By: (SRO) Date:
By: A Date:
. . (7)- APPROVED BY: .( 1 f% Date: Sl1qIM (8) MISCELLANEOUS:
Reviewed / Approved By: Date:
Reviewed / Approved By: Date:
t E
'l
- r j 7 ,
3 g - -
" ' ~
ii . -
HP/1/A/1009/17
~
~ ~ '
l
. Pag 2 1 of 8 .
, 3 .
'i . - DUKE P(fwEl COMPANY l
- l 1 x
'l .CCONEE NUCLEAR STATION ,
i OPERATINGPROCEDUREFORPOST-ACCIDEhT' CONTAINMENT i
AIR SAMPLING SYSTEM l
1.0 Purpose ;
% 1 i.
l . This procedure describes.the operation of the Post-Accident Containment i ., Air Sampling System which-is used to obtain'a prompt containment air.
l sample under accident conditions thile keeping radiation exposure ALARA.
This procedure is also used to perform the semi-aunual functional test i
of the system.
2.0 References -
2.1 Duke Power Company Nuclear Station Post-Accident Containment Air Sampling System Manual'
~
2.2 .HP/0/B/1006/07, Procedure for Preparation of Gas Calibration Sources 2.3 CP/1/A/2002/04C, Operating Procedure for the Post Accident Liquid Sampling (PALS) System m
~
2.4 HP/0/3/10;09/15, Procedure for Sampling and Quantifying High Level Gaseous,-Ridioicdine and Pirticulath Radioactivity 2.5 Es/0/A/.1800/04, Loss of Coolant 3 . 0' Limits and Preciutions '
-3.1 'The sampling cycle will require two (2)' qualified technicians approximately one (1) hour:per. sample, ,of which about ten (10) minutes-will be spent in the sample panal area. One qualified technician vill operate ths control panel while the other will
- ' perform transit dutie's' to and' from 'the panel.
3.2 Personnel communications' can be' achieved by phone.
Unit'l & 2 - Ext. 1268'(by' column AX-38) ~
Unit 3 Ext. 1396..(by/. doqr -to RCA) s 3.3 The following items >will~never be used on the panel.
- a. Trap Area Evacuation l
~
~
- b. Fast Sanole Dilution u _ _
h
{ - k
\ w l I
4 g
~
' , " ' ~
jg . .t HP/1/A/1009/17 L" ,
Paga 2 of 8 3.4 The Recire Pump must never be used at any pressure other than 0 inches of Mercury.
3.5 Moving the Selector Switch from one mode to'another stops all current system operations. Depressing the Activate button starts operation l ,
of the newly selected mode.
I 3.6 The radiation' monitor on the control panel will provide levels of
! radiation at the, sample panel. If the radiation monitor is not l working properly, then a portable survey instrument will be used
! to dete=4= radiation levels.
3.7 If problems with the pressure and/or temperature gauge are evident, such astgoing off scale or erratic response, the Selector Switch must be turned to the OFF mode and sampling discontinued until the problem is corrected. ,
3.8 If the sampling system cannot be operated, then HP/0/B/1009/15 (Ref. 2.4) will be used as an alternate method for obtaining a containment air sample. ,
3.9 Enclosure 5.5 will be used to check off the steps as the procedure is completed.
3.10 Operations must complete Enclosure 5.3 or 5.4 to bypass the Hydrogen Analyzer to bring containment air to the sampling system and to return the Hydrogen Analyzer to service after sampling is complete by Enclosure 5.6 or 517.
'3.11 The frcat' side of the sample panel is the side which contains the door.
The left and right side of the sample panel will be determined by using this fact.
3.12 If radiation levels exceed 16 R/hr and cannot be reduced by purging the system, secure operation of the panel, move to a low background area, and contact the Station Health Physicist or his designee for furtt.er instructions.
3.13 Eefore sampling operations begin, the decision must be made based on radiological conditions, in the reactor building and the sampling area whether to use a 100 ml gas bomb or a calibrated syringe for the gas sample. During emergency conditions, this decision will be made by the Station Health Physicist or his designee.
3.14 Enclosure 5.8, Valve Checklist for Sample Panel, may be used to provide assistance in determining flow inside the sample pansl. It is not intended to provide a verification for valve operation.
3.15 During accident conditions, the keys needed for sampling will be located in the Shiftman's key cabinet.
3.16 The sampling system must not be used if reactor building pressure is greater than 40 psig.
- 4
+
. -_ _ _ ~ . - , . . - , - - __ _ , . - . _ . . .
HP/1/A/1009/17 !
Pag 2 3 of 8 4.0 Procedure 4.1 I.ocate the Shift Supervisor for Operations and request that Operations complete Enclosure 5.3 or 5.4 to bypass the' Hydrogen Analyzer so the Post Accident Containment Gas Sampling Systiem may be operated.
4.2 Obtain equipment necessary to perform sampling, including the thio-sulfate solution. Also obtain keys to the control panel and the sixth floor Ventilation Equipment Room.
- NOTE: Necessary equipment for sampling is listed on Enclosure 5.1. ;
4.3 Open the valve on the nitrogen bottle next to the sampling panel to 40 psig.
4.4 Open the (a) DI Water Inlet (b) Instrument Air Inlet (c) Na Inlet located on the left side of the sample panel.
NOTE: Open inlets by rotating the back switches counterclockwise
,one quarter turn to the upward position.
4.4.1 Ensure the test tees on the sample inlet and outlet lines are closed.--
4.5 Position t!1e thiosulfate funnel directly over the fill port located on top of the sample panel. Attach the hose on the funnel to the fill port and pour the 500 31 of thiosulfate solution into the funnel.
4.6 Set the switches listed below as follows:
(a) Sample Volume Select - set on SJ.AlI.
(tr) Dilution Volume Select - set en LARGE (c) Selector Switch - set on OFF (d) System Purze - set on NORMAL (e) Refill Switch - set on OFF (down)
(f) TC Switch - set on POSITION 1 (thermocouple measures sample line temperature)
HP717A/1009/17 Pcg3 4 of 8 (g) Sample Line Select Switch - turn to Unit and Hydrogen Analyzer (Train A or B) being used for this operation of the sampling system l
4.7 Turn the Key Lock Switch to POWER ON and ' ensure the power on light has come on.
4.8 Turn the Radiation Monitor toggle switch ON (up).
4.8.1 Turn the selector on the Radiation Monitor to BATT and ensure the needle is in the " red test region." Turn
, the selector to the MR/HR or R/HR scale.
NOTE: If the Radiation Monitor is not functioning properly, note that is is not working on Enclosure 5.5, Step 9 and use a portable surs ey instrument to determine radiation levels dur.ng sampling.
4.9 Purge the Sample Panel. ,
4.9.1 Turn Select Switch to SYSTEM PURGE 4.9.2 Move Normal - Sample Purge to SAMPLE PURGE 4.9.3 Depress ACTIVATE button.
4.9.4 Depress EVAC button (Evac light on) and watch pressure
' gauge slowly drop to % - 19" of Hg. Depress STOP.
4.9.5 e- Press down and release the GAS PURGE toggle switch and watch the pressure gauge swiftly rise to + 10" of Hg.
Depress STOP button.
4.9.6 Depress the EVAC button and watch the pressure gauge drop to 0" of Hg. Depress STOP button.
4.9.7 Depress the PUMP button and wait for 30 seconds. Depress STOP button.
4:9.8 Repeat Step 4.9.4 through 4.9.7 twice to purge the sample panel two more times.
4.9.9 Move Normal - Sample Purte to NORMAI..
4.9.10 Turn Selector Switch to SOLUTION CHANGE OUT.
4.10 Preparation for Sampling 4.10.1 Set the 500 mi sample bottle in a clear poly bag. Place the portable shielded container on the floor under the Thio-sulfate sampler (left side of panel), and place the sample bottle in the shielded container.
HP/1/A/1009/17 Paga 5 of 8 ,
4.10.2 Detach the left side of the flexible tubing on the l thiosulfate sampler located on the left side of the sample panel near the floor. ,
4.10.3 Insert the free end of the tubing into the 500 m1 sample bottle.
4.10.4. Complete Steps a) and b) below if a 100 ml gas bomb will be used for the gas sample. If the gas sample will be drawn by syrings, go to Step'4.10.5. .
a) Detach the side of the flexible tubing farthest away from the sample panel on the gas sampler located on the right side of the sample panel near the floor.
b) Attach a 100 31 gas bomb between the free end of the flexible tubing and the hard piping on the gas sampl .a.
4.10.5 Record sample line temperature reading for sample volume
, calculations on Enclosure 5.2.
4.11 Flush Thiosulfate Sampler and fill with Thiosulfate.
, 4.11.1 Depress ACTIVATE button.
4.11.2 Depress FLUSH button and hold for 30 seconds.
4.11.3 Depress PURGE button and hold for 30 seconds.
4.11.4 . Dipress ENTTT button and hold for 30 seconds.
~ - '
4.11.5 Open the TS (thiosulfate) valve located inside the sample panel directly below the fillport. (Open valve in same manner as valves in Step 4.4).
4.11.6 Move Refil_1 toggle switch to ON (up) and wa'it 2 minutes.
Move Refill to 0FF (down).
~
4.11.7 Turn Selector Switch to DILUTION VOLUME EVACUATION.
4.12 Evacuate the Dilution Volume.
4.12.1 Depress ACTIVATE button and watch pressure gauge drop to N - 19" of Hg. Turn Selector Switch to SAMPLE RECIRC, 4.13 Recirc Containment Air and Trap a Sample.
4.13.1 Depress ACTIVATE button and wait 10 minutes.
4.13.2 Return to sample panel and note pressure gauge reading on sample inlet line. Record pressure on Enclosure 5.2.
4.13.3 Depress SAMPLE button and wait 1 minute.
l l
1 y n , w .-4 - ---------a
HP/1/A/1009/17 Pcga 6 of 8 4.13.4 Depress TRAP button and wait 10 seconds.
4.13.5 Turn Selector Switch to SAMPLE DILUTION. l 4.14 Dilute Sample with N2 and Recire.
4.14.1 Depress ACTIVATE button.
4.14.2 Depress SLOW button and watch pressure gauge slowly rise to 0" of Hg. Depress STOP button.
4.14.3 Depress RECIRC button and wait 5 minutes.
4.14.4 Complete step a) if a syringe will be used for the gas sample. If a 100 ml gas bomb is being used for the gas sample, continue on to Step 4.14.5.
a) Insert the calibrated gas syringe into the septum on the gas sampler. Withdraw a 5 cc sample of gas and place the syringe into the portable shielded container.
4.14.5 Depress the STOP button on the control panel.
4.14.6 Turn the Selector Switch to SOLUTION CHANGE 0UT.
4.15 Collect Particulate and Icdine Sample.
4.15.1 ' Depress ACTIVATE button.
~
4.15.2 Depress-TS SAMPCD button.
4.15.3 Depress and hold EMPTY button until thiosulfate solutica has drained into 500 m1 sample bottle.
4.15.4 Depress TS SAMPLE GRAB button.
4.15.5 Depress PURGE button and hold for 1 minute.
4.15.6 Turn the Selector Switch to SYSTEM PURGE.
4.16 Purge the Cample Panel.
4.16.1 Depress ACTIVATE button.
4.16.2 Depres; EVAC button and watch pressure gauge slowly drop to * - 19" of Hg. Depress STOP button.
4.16.3 Press down and release GAS PURGE toggle switch and watch pressure swiftly rise to + 10" of Hg. Depress STOP button.
4.16.4 Depress EVAC button and watch the pressure gauge drop to 0" of Hg. Depress STOP button.
HP/1/A/1009/17 Pcan 7 of 8 ,
I 4.16.5 Depress the PUMP button and wait 30 seconds. Depress STOP button. '
4.16.6 Repeat Steps 4.16.2 through 4.16.5 to purge the sample panel one additional time. .
4.17 Remove Samples from Sample Panel. l l
4.17.1 Return to the sample panel and close both valves on the gas bomb (if used.)
4.17.2 Disconnect the gas bomb (if used) from the sample panel.
Place gas bomb in portable shielded container.
4.17.3 Tightly cap the 500 ml sample bottle.
4.18 Switching the Sample System Off.
4.18.1 Turn the Selector Switch to O H .
4.18.2 Turn the Radiation Monitor to OH .
4.18.3 Turn the Keylock Switch to O H.
4.18.4 Close the following valves:
a) Nitrogen bottle - next to sample panel s
. b) TS Valve - inside sample panel
~ ~
ci' DI Wafer Inl'e't, Instrument Air Inlet, N 2 Inlet (On left side of sample panel) 4.19 Transport the samples to the Count Room for analysis.
4.20 Calculate the sample volume using the data from Enclosure 5.2. Record this volume on sample data sticker.
NOTE: If sample cannot be counted because of high activity, further dilute the gas samples as per procedure HP/0/B/1006/07.
4.21 Transmit sample analysis results to the Station Health Physicist or his designee.
4.22 Request Operations to return the Hydrogen Analyzer to service per Enclosure 5.6 or 5.7.
5.0 Enclosures 5.1 Sampling Equipment 5.2 Sample Data Sheet I
t 1_____-__-______-_________-- _ . _ - -
HP/1/A/1009/17 Pega 8 of 8 5.3 Operations Checklist for Bypassing Hz Analysis Panel currently in 7
Standby Mode 5.4 Operations Checklist for Bypassing Ha Analyiis Panel currently in Analyze Mode 5.5 Checklist for Operation of Sample Panel 5.6 Operations Checklist for Returning Hz Analysis Panel Back to Service in Standby Mode 5.7 Operations Checklist for Returning Hz Analysis Panel Back to Service in Analyze Mode 5.8 Valve Checklist for Sample Panel 5.9 Control Panel Diagram 5.10 Flow Diagram s
h e
~- - - - - - , - . - - ,e,- - - - - - ,- - - -
Paga 1 of 1 )
)
ENCLOSURE 5.1 -
.m HP/1/A/1009/17 ,
SAMPLING PANEL EQUIP!fENT '
1 Nalgena 500 al Thiosulfate sample bottle.
2 Stainless Steel Gas Bombs 1 9/16" Combination Wrench 1 Stainless Steel Portable Shielded Container 1 Stopwatch I bottle Thiosulfate Scl.ution (500 ml) 2 10" x 12" Clear Poly Bags l' Calibrated Gas Syringe 1 Bucket s
e
- * * **e og **
e o
9 i
I e
~. . ,
O Pcgs 1 of 1 ENCLOSURE 5.2 -
I HP/1/A/1009/17 ,
SAMPLE DATA SHEET
- 1) NAME DATE UNIT
- 2) Sample Line Temperature
- 3) Sample Inlet Line Pressure
- 4) Gas Sample Volume = SV SV = 4307.1 (STV) = ml (275.224 + .555 (*F]) (14.7 + P) where:
, *F = Saurple Line Temperature
" ~
N~- =
P SamfleInlet"LineP'ressure STV = Sample Trap Volume Unit 1 = 1.3 al SV
, 5) ~ Diluted Volume = g4= ml
- 6) Record
- Diluted Volume as Gas Sample Volume on Sample Label.
l
- 7) Record Iodine and Partiedate Sample Volume as 1.3 al of sample in 500 ml of thiosulfate solution on saarple label.
l i
1 l
Pega 1 of 2 Checked Control Copy Date .
ENCLOSURE 5.3 HP/1/A/1009/17 i
OPERATIONS CECKLIST FOR BYPASSING Hz ANALYSIS PANEL CURRENTLY IN STANDBY MODE VERIFICATION DATE DATE INIT./ TIME INIT./ TIME 1.0 Initial Conditions 1.1 Containment Integrity is required.
1.2 Designate a Licensed Operator assigned to immediately close containment isolation valves from the Control Room if an ES actuation occurs. This person aty have other responsibilities, but they shall
~
not prevent him from performing this evolution.__ ,
License Operator- - -
- Unit Supervisor 1.3 Record that the containment isolation valves that will be opened on Enclosures 5.1 and 5.6 of OP/0/A/1102/20 (Shift Turnover). (IPR-81 and IPR-84 or IPR-90 and IPR-87).
1.4 Hz Analysis Panel is in Standby Mode.
1.5 Reactor building pressure is less than 40 psig.
l 2.0 Procedure i 2.1 Mace Post Accident Sampler in service as follows:
l 2.1.1 Select which train to be used. Circle one: Trn. "A" or Trn. "B" .
l 2.1.2 Ensure train is in standby mode by observing red light in gray cabinet.
NOTE: Use other train if not in standby.
I
\
e
~ m a -
--,-w,.. - - - , , - -,,,--,w - , - , - - - - - - - - - - ,e- ,.. , - - - - - . awe ,,w,--w --
r-~
Pega 2 of 2 ENCI.0SURE 5.3 HP/1/A/1009/17 .
i .
VERITICATION DATE DATE INIT./ TIME INIT./ TIME 2.1.3 At the selected train " Remote" Panel (blue cabinet), depress both black ON buttons for 'BYP TO POST AC'.
Sens (IPR-83, IPR-86) or (IPR-89, (IPR-92).
2.1.4 Turn sample valve selector switch to
,' Top Cont'. Opens IPR-71 or IPR-76.
(Red light will come on).
2.1.5 From the Control Room, open IPR-81 and IPR-84 (Containment Isolation Valves) if train "A" was selected.
OR Open 1PR-87 and IPR-90 (Containment Isolation Valves) if train "B" was selected.
CAUTION: If ES actuation occurs, imediately close
, isolation valves for containment isolation.
2.1.6
~~ ^ ~
j < Notify" Unit Supe 1 visor shich train is selected.-
Unit Supervisor 2.1.7 Return completed enclosure to Health Physics Personnel operating Sample Panel.
6 t i L
- Pega 1 of 1 -
l .
4
- Checked Control Copy .s Date .
i i
ENCLOSURE 5.4 HP/1/A/1009/17 OPERATIONS CHECKLIST FOR BYPASSING
.s Hz ANALYSIS PANEL CURRENTLY IN ANALYZE MODE VERI ICATION DATE DATE INIT 7 IME INIT./ TIME 1.0 Initial Conditions 1.1 H 2Analyzer is in Analyze Mode.
1.2 Reactor building pressure is less than 40 psig.
4 2.0 Procedure 2.1 Place Post Accident Sampler in service as follows: '
2.1.1 Select which train is to be used. . .
Circle one: Trn. "A" or Trn. "B".
2.1.2 At the " Remote" Panel (blue cabinet),
! position the "Off Standby, Analyze" selector to " Standby" and observe 4
red light in grey cabinet.
2.1.3 At selected train " Remote" Panel (blue _ . , _ .
cabinet), depress both black ON buttons - -
for 'BYP TO POST AC'. Opens TIPR-83, .
IPR-86) or (IPR-39, 1PR-92).
2.1.4 Notify Unit Supervisor which train is selected.
i Unit Supervisor .
2.1.5 Return completed enclosure to Health Physics Personnel operating Sample
, Panel.
l l
l l
Pega 1 of 7 Checked Control Copy l I
Date .
ENCIOSURE 5.5 HP/1/A/1009/17 CHECKLIST FOR OPERATION OF SAMPLE PANEL NOTE: Complete steps in order listed. Initial steps as completed.
A) Switching System On
- 1) Operations Bypass Hz Analyzer by Enclosure 5.3 or 5.4.
- 2) Obtain Sampling Equipment and Keys.
i 3) Open Fitrogen bottle to 40 psig.
- 4) Open:
i a) DI Water Inlet
- b) Instrument Air Inle*.
c) N2 Enlet -
- 5) Ensure t'est tees on sample inlet and outlet lines are :losed.
l ,
i e
'6) a) Positibn thiosulfate funnel b) Attach- hose to fill port c) Pour 500 ml of thiosulfate into funnel.
- 7) Set switches on control panel:
a) Sample Volume Select - set on SMALL.
b) Dilution Volume Select - set on LARGE.
c)- Selector Switch'- set on OFF.
d) System Purge - set on NORMAL.
( e) Refill Switch - set on 0FF (down).
+
f) TC Switch - set on POSITION 1 (measures sample line temperature).
g) Sample Line Select Switch - Unit and Hydrogen Analyzer Train A or B
- 8) Key Lock Switch - POWER ON l
l
- l
~y I
Paga 2 of 7 ENCLOSURE 5.5
~-
HP/1/A/1009/17 CHECKLIST FOR OPERATION OF SAMPLE, PANEL
- 9) a) Radiation Monitor - ON (up) b) Radiation Monitor Selector - BATT .(red test region) c) Radiation Monitor Selector - MR/HR or R/HR B) Purge the Sample Panel
- 10) Selector Switch - SYSTEM PURGE
_, 11) Normal - Sample Purge - SAMPLE PURGE O O O 12) a) ACTIVATE
.b) EVAC c) , Pressure slowly drops to * - 19" of Hg.
d) STOP O O O 13) a) GAS ~ PURGE p -'ress down and release.
b) Pressure swiftly rises to + 10" of Hg.
c) STOP O O O 14) a) EVAC b) Pressure drops to 0" of Hg.
- c) STOP O O O 15) a) PUMP - wait 30 seconds b) STOP O O O 16) a) Purge sample panel two (2) more times by completing Steps 12 through 15 two (2) more times.
- 17) Normal - Samole Purge - NORMAL e-- , ,e-- , ,,, , , - - , - - , , - - .---n - ,,
Pcan 3 of 7 ENCLOSURE 5.5 HP/1/A/1009/17 CHECILIST FOR OPERATION OF SAMPLE, PANEL
- 18) Selector Switch - SOLUTION CHANGE 0UT C) Preparation for Sampling
- 19) Attach 500 al sample bottle to TS Sampler.
- 20) Attach gas bomb to gas sampler (N.A step if syringe will be used instead of gas bomb).
- 21) Record sample line temperature on Enclosure 5.2.
D) Flush Thiosulfate Sampler and fill with Thiosulfate s
. 22) a) ACTIVATE
~ ~ ~
- ~
b) FLUSI~ hold 30'] seconds' c) PURGE - hold 30 seconds d) EMPTY - hold 30 seconds e) Open TS (thiosulfate) valve f) Refill - ON - wait 2 minutes g) Refill _ - 0FF
- 23) Selector Switch - DILUTION VOLUME EVACUATION
Pega 4 of 7 ENCLOSURE 5.5 HP/1/A/1009/17 .-s CHECKLIST FOR OPERATION OF SAMPLE PANEL i E) Evacuate the Dilution Volume
- 24) a) Activate b) Pressure slowly drops to * - 19" of Hg.
c) Selector Switch - SAMPLE RECIRC F) Recire Containment Air and Trap a Sample
- 25) ACTIVATE - wait 10 minutes
- 26) Return to sample panel - note and record sample inlet line pressure on Enclosure 5.2. ,
- 27) a)~ SAMPLE - wait 1 minute b) TRAP - wait 20 seconds c.
c) Selector Switch - SAMPLE DILUTION G) Dilute Sample with N2 and Recire.
- 28) a) ACTIVATE
~
b) SLOW.
c) Pressure slowly rises to 0" of Hg.
d) STOP
- 29) RECIRC - wait 5 minutes
- 30) Complete a) if syringe will be used for gas sample. If gas bomb is being used, N/A this step and continue on to Step 31.
a) Withdraw a 5 ce gas sample from the septum of the gas sampler using calibrated syringe. Place syringe in portable shielded container.
,---,,-a - -4., 4
-- _------ - , - - - - - -_ --,,,e_ , . , - - - - -y - . -e _.,_
. Paga 5 of 7 ENCLOSURE 5'.5 HP/1/A/1009/17 CHECKLIST FOR OPERATION OF SAMPLE, PANEL
- 31) a) STOP b) Selector Switch - SOLUTION CHANGE 0tfr H) Collect Particulate and Iodine Sample
- 32) a) ACTIVATE b) TS SAMPLE c) EMPTT - hold button until thiosulfate solution has drained into sample bottle.
d) TS SAMPLE GRAB e) PURGE - hold button 1 minute
- 33) Selector' Switch - SYSTEM PURGE I) Purge the Sample Panel.
O O 34) a) ACTIVATE b) EVAC c) Pressure slowly drops to * - 19" of Hg.
d) STOP i
0 C 35) a) GAS PURGE press down and release b) Pressure swiftly rise to + 10" of Hg.
c) STOP l
m - , , , - . ~ ~ - - - - - . - - - - - + c-, y. ,e 4 ,. , y
Pega 6 of 7 -
ENCLOSURE 5.5 m '
HP/1/A/1009/17 CHECKLIST FOR OPERATION OF SAMPLE, PANEL
^
0 0 36) a) EVAC b) Pressure drop to 0" of Hg.
- c) STOP Q O 37 a) PUMP - wait 30 seconds b) STOP O O 38) Repeat Steps 34 through 37 one additional .ime.
J) Remove Samples from Sample Panel
- 39) Return to sample panel and close both valves on the gas bomb.
1 (N/A step if gas bomb not used).
t ,
- 40) Disconnect gas bomb from sample panel. Place gas bomb in portable shielded container. (N/A step if gas bomb not used). . . . ;,. . _.
- 41) Tightly cap sample bottle.
K) Switching System Off _
- 42) Selector Switch - 0FF
- 43) Turn the Radiation Monitor - 0FF
, _ _44) Key Lock Switch - 0FF
_ _ _ - - - - -- -- % .:,-.9 - ,-e , ,-
4
. pegg 7 og 7 ENCLOSURE 5.5 HP/1/A/1009/17 CHECKLIST FOR OPERATION OF SAMPLE, PANEL
- 45) Close:
a) Nitrogen bottle b) TS Valve - inside sample panel c) DI Water Inlet d) Instrument Air Inlet e) N Inlet
- 46) Transport samples to Count Room for analysis.
- 47) Calculate sample volume using data from Enclosure 5.2. (Dilute gas samples per HP/0/3/1006/07 if needed).
- 48) Transmit sample analysis results to Station Health Phy,sicist or his designee.
- 49) Request Operations to return the Hydrogen Analyzer to service per Enclosures 5.6 or 5.7.
..z.
I l
L l
i
- . .- - . .- = _ ___ . .-
Pags 1 of 1 Checked Control Copy -
Date ,
ENCLOSURE 5.6 4
HP/1/A/1009/17 .
OPERATIONS CHECELIST FOR RETURNING Hz ANALYSIS PANEL BACK TO SERVICE IN STANDBY MODE j
VERIFICATION DATE DATE INIT./ TIME INIT./ TIME
^
1.0 Procedure i 1.1 Return the H 2 Analysis train back to service as follows:
1.1.1 Turn Sample Valve Selector switch to 0FF. (Red light will go off). Closes IPR-71 or IPR-76. s t-1.1.2 Depress the OFF buttons on both
'BYP TO POST AC' switches. Closes . - . . . _
(IPR-83, IPR-86) or (IPR-89, IPR-92) . " - - ~
1.1.3 From the Control Room, Close IPR-81 and IPR-84 if train "A" is selected.
OR 4
Close IPR-87 and 4
1PR-90 if train "B" was selected. ,,_ .
NOTE: This will regain containment integrity. -
Remove the containment isolation valves from Enclosure 5.1 and 5.6 of OP/0/A/1102/20 (Shift Turnover).
1.1.4 Notify the Unit Supervisor the Hz Analysis Train is back in service.
1.1.5 Return completed enclosure to personnel operating Post Accident Sample Panel.
' ~
Phg2 1 of 1 Checked Control Copy f
i Date
- ENCLOSURE 5.7 HP/1/A/1009/17 OPERATIONS CHECKLIST FOR RETURNING IDiIT 1 Hz ANALYSIS PANEL BACK TO SERVICE LN ANALYZE MODE VERIFICATION DATE DATE INIT./ TIME INIT./ Time 1.0 Initial Conditions 1.1 Hz Analysis Panel has been switched to Standby Mode for Post Accident sampling and is to be returned to Analyze Mode.
2.0 Procedure 2.1 Return the H 2Analysis train back to service
, as follows: '
' ~ ~
2.1.1 Depresi~the OFF liuttons 'on both "BYP to Post AC"' switches. Closes (IPR-83, IFR-86) or (IPR-89, IPR-92).
2.1.2 Position the "Off, Standby, Analyze" Selector to Analyze.
NOTE: When Analyze is selected, the indication will go up scale resulting in a possible High Hydrogen Alars on both panels and in th'e Control Room. Then return down scale to the correct reading in approximately 3 minutes.
l 2.1.3 Push the Remote Selector button to l ensure control is from Remote Panel.
2.1.4 Reset the Common Alarm after the l meter reading stabilizes. i l
l 2.1.5 Notify the Unit Supervisor the Hz l Analysis Train is back in service. .__
2.1.6 Return completed enclosure to Health
, Physics Personnel Operating Post
! Accident Sample Panel.
e Paga 1 of 1 ENCLOSURE 5.8 .,
HP/1/A/1009/17 ,
VALVE CHECKLIST FOR SAMPLE PANEL NOTE: This checklist may be used to provide assistance in determining flow inside the sample panel. It is not intended to provide a verification for valve operation.
ACTION RESPONSE Dilution Volume Evacuation
- Activate Energize 1, 2, 9, 12, 19, 17 Sample Recirculate
- Activate Energize 1, 2, 5, 6, 27
- Sample De-energize 27
- Trap De-energize 2, 5 Sample Dilution
- Activate t Energize 12, 17
~
- Slow Energize 3, 20 -
- - Stop _~
De-energize 3, 20
.. - Recire - - --
Energize Recire Pump 16, 18 NOTE: Valve #17 will de-energize when selector switch is moved to another position.
System Purae Energize 9, 12, 19, 27
- Activate Energize 12, 22
- Evac Energize 1, 2
- Stop De-energize 1, 2
- Gas Purge (down) Energize 15, De-energize 1, 2
- Stop - De-energize 15
- Normal - Sample Purge (Sample Purge) Energize 17
- Pump Energize Pump 16, 18 l De-energize 15, or 1 and 2 j - Stop De-energize Pump 16, 18 Solution Change Out l - Empty Energize 10, 11, 13
- Flush Energize 14, 10
- Purge Energize 15,10
- Refill Energize 11, 13
- TS Sample Energize 21
- TS Sample Grab De-energize 21 l
l
i I
i Medluia Small i l f 1.arge Sample itecirc - Trap Area 33gy yh'tapleDgion
~ Evacuation Ol @@
Sample Trap O @@@@ Inert Cas Recirc pilution Volume Select I)11ut ion Volume System Purge Evacuation Small.
s a I.arge h Ingroun Pro- .
--- e Evac db h h .
Selector pus *e Pump Stop i
l Swi tcli l Sample Volume Select "
Normal f*
Off -
<+
Uniti A
7 A
I ).Uait 2 ' b* Solution Change Out O
" k P:
.Il m e II ,
Off M O i , Activate Empty Purge I j
On R ?
Sample I.ine Select Flusti ill
- Fuse 1 Fuse 2 - TS a TS P
OO Sample .Gra i
! . F5 -
300 Sump Pump Power On V..0 t.t - 250 p
i Off ' i j ^ ~5 0 -10 0 y TC T ~150 $* s M' 15 U P
Radiation y, H 10('
j b Honitor 20 Iy o p
-25 .- 5(
i P
i Dilution .
Cylinders F1 3 -
Pressure Tre.'smitter
, L .
J Ven,r ,.
) [Il ) [G p f
_. 3 dH 2 L f s (14
. 1
~
~ " "#
Outlet T k <
-p o44 7 P 1 0 sg
\ Sample
)) TI) k T Volume -kh k) kJ R
?
, , O
- 80 ple 2 q_ _
inlet TS I ) Sample , g,, ,
a Cylinder g 33,p g ,
Cylinder
%d Recirc -%
a gg Pump
- A >
m
(
k a t; e n
- *3"
- H VMw )
y ..
1
~ ' '
M.A. 1 TO N O
~
CONTROL COPY Form SPD-1002-1 DUKE POWER COMPANY (1) ID No: HP/2/A/1009/17 PROCEDURE PREPARATION Change (s) NA to PROCESS RECORD ,
Incorporated (2) STATION: Oconee (3) PROCEDURE TITLE: Ooeratine Procedure for Post-Accident Containment .ir Sampling Systa (4) PREPARED B';: h n A ci k f 1% DATE: b-k-(5) REVIEWED BY: _n -
DATE: $ -/[- 83 Cross-Disciplinary Review y: O E Md. @ . N/R:
G '(/
(6) TEMPORARY APPROVAL (IF NECESS,ARY):
By: (SRO) Date:
By: b Date:
(7) APPROVED BY: l h Date: 5 t
n t
'2 3 - = -
(8) MISCELLLNEOUS: _.
Reviewed / Approved By: Date:
Reviewed / Approved By: Date:
ye 1
l l
- - , _ . - _ , , , , . , , , , , , ,, .-y . .. -- ,
HP/2/A/1009/17 Paga 1 of 8 I
4 DUKE POWER COMPANY l l _
l OCONEE NUCLEAR STATION -
l OPERATING PROCEDURE FOR POST-ACCIDENT CONTAINMENT i
l AIR SAMPLING SYSTEM 1.0 Purpose !
This procedure describes the operation of the Post-Accident Containment Air Sampling System which is used to obtain a prompt containment air
- sample under accident conditions while keeping radiation exposure ALARA.
This procedure is also used to perform the semi-annual functional test of de system 2.0 References 2.1 Duke Power Company Nuclear Station Post-Accident Containment Air Sampling System Manual 2.2 HP/0/3/1006/07, Procedure for Preparation of Gas Calibration Sources 2.3 CP/1/A/2002/04C, Operating Procedure for the Post Accident Liquid Sampling (PALS) System 2.4 HP/0/B/1009/15, Procedure for Sampling and Quantifying.High. Level...
~~~
Gaseous, Radioiodine'and Particulate-Radioactivity 2.5 EP/0/A/1800/04, Loss of Coolant 3.0 Limits and Precautions 3'.1 The sampling cycle will require two (2) qualified technicians approximately one (1) hour per sample, of which about ten .(10) _ .
minutes will be spent in the sample panel area. One qualifie'd technician will operate the control panel while the other will _
perform transit duties to and frem the panel.
3.2 Personnel communications can be achieved by phone.
Unit 1 & 2 - Ext. 1268 (by column AX-38)
Unit 3 -
Ext. 1396 (by door to RCA) 3.3 The following items will never be used on the panel.
- a. Trap Area Evacuation
- b. Fast Sample Dilution
HP/2/A/1009/17 Pdga 2 of 8 3.4 The Recire Pump must never be used at any pressure other than 0-inches
- of Mercury. ~
l 3.5 Moving the Selector Switch from one mode to'another stops all current system operations. Depressing the Activate button starts operation of the newly selected mode.
3.6 The radiation monitor on the control panel will provide levels of radiation at the sample panel. If the radiation mor.itor is not working properly, then a portable survey instrument .will be used to determine radiation levels.
3.7 If problems with the pressure and/or temperature gauge are evident, such as going off scale or erratic response, the Selector Switch must be turned to the OFF mode and sampling discontinued until the problem is corrected.
3.8 If the sampling system cannot be operated, then HP/0/B/1009/15 (Ref.
2.4) will be used as an alternate raethod for obtaining a containment air sample.
3.9 Enclosure 5.5 will be used to check off the steps as the procedure is completed.
3.10 Operations must complete Enclosure 5.3 or 5.4 to bypass the Hydrogen Analyzer,to bring containment air to the sampling system and to return the Hydro' gen Analyzer to service after sampling is complete by Enclosure. ;
. 5.6 or 5.7.
" ' ~ '
3.11 The front' s[d'e of 'the sample panel is the side which contains the door.
The left and r'ight side of the sample panel will be determined by
. using this fact.
3.12 If radiation levels exceed 16 R/hr and cannot be reduced by, purging the system, secure operation of the panel, move to a low background area, and contact the Station Health Physicist or his designee for further instructions.
3.13 Be. fore sampling operations begin, the decision must be made based on radiological conditions in the reactor building and the sampling area whether to use a 100 ml gas bomb or a calibrated syringe for the gas sample. During emergency conditions, this decision will be made_by the Station Health Physicist or his designee.
~
3.14 Enclosure 5.8, Valve Checklist for Sample' Panel, may be used to provide assistance in determining flow inside the sample panel. It is not=
intended to provide a verification for valve'operat. ion.
3.15 During accident conditions, the keys n'eeded for'sa,pling will be located in the Shiftman's key cabinet.
l 3.16 The sampling system must not be .used if reactor building pressure,is greater than 40 psig.
m ./ <
~~
/
,.4-, , . - _ _ . - w ___, , ..m_ ,m ,- . _ _ ,m,- y. . _ . . , ,_ , , , , . , , __
~
HP/2/A/1009/17 Pags 3 of 8 ,
i
. 4.0 Procedure ,
s 4.1 lI.ocate the Shift Supervisor for Operations and' request that Operations cow lete Enclosure 5.3 or 5.4 to bypass theJHydrogen Analyzer so the Post Accident Ccatainment Gas Sampling System may be operated.
^
4.2' Obtain equipment necessary to perform sampling, including the thio-sulfate solution.
- Also' obtain keys to the control panel and the sixth floor Ventilation Equipment Room..
NOTE: Necessary 'eq'uipment for sampling is listed on Enclosure 5.1.
4.3' Open the. valve on the nitrogen bottle next to the sampling panel to 40 psig.
4.4 Open the (a) DI Witer Inlet s (b) Instrument Air Inlet
~
(c) Na Inlet located on the left side of the ' ample s panel.
NOTE: Open inlets by rotating the back switches counterclockwise sone-quarter turn to the upward position.
4.4.1 Ensure the test tees on.the sample inlet and outlet. lines.__
. _ are closed.
4.5 Position the thiosulfate funnel directly over the fill port located on top of the sa:sple panel. Attach the hose on the funnel to the fill port and pour chs 300 ml of thiosulfate solution into the funnel.
4.6 Set the switches listed below as follows:
(a) Sample Volume Select - set on SMAI.I.
(b) Dilution Volume Select - set on LARGE l
(c) Selector Switch - set on OET c - (d) System Purge set on NORMAI,
,(e) Refill Switch - set on OFF (down)
(f) TC Switch - set on POSITICS 1 (thermocouple measures sample line teriperature)
~
i ,
s f .-
W w
HP/2/A/1009/17 Paga 4 of 8 s
I
. (g) Sample Line Select Switch - turn to Unit and Hydrogen Analyzer (Train A or B) being used for this operation of the sampling system 4.7 Tusa the Key Lock Switch to POWER ON and ensure the power on light has come on. ;
4.8 Turn the Radiation Monitor toggle switch ON (up). !
4.8.1 Turn the selector on the Radiation Monitor to BATT and ensure the needle is in the " red test region." Turn the selector to the MR/HR or R/HR scale.
NOTE: If the Radiation Monitor is not functioning properly, note that is is not working on Enclosure 5.5, Step 9 and use a portable survey instrument to determine radiation levels during sampling.
1 4.9 Purge the Sample Panel.
4.9.1 Turn Select Switch to SYSTEM PURGE 4.9.2 Move grmal - Sample Purge to SAMPLE PURGE 4.9.3 Depress ACTIVATE button.
4.9.4 i Depress EVAC button (Evac light on) and watch pressure gauge slowly drop to * - 19" of Hg. Depress STOP.
- . . z.
4.9.5 Press down a'nd release the GAS PURGE toggle switch and watch the pressure gauge swiftly rise to + 10" of Hg.
Depress STOP button.
4.9.6 Depress the EVAC button and watch the pressure gauge drop to 0" of Hg. Depress STOP button.
l ,
4.9.7 Depress the PUMP button and wait for 30 seconds. .. Depress -
STOP button.
4.9.8 Repeat Step 4.9.4 through 4.9.7 twice to purge the sample panel two more times.
4.9.9 Move Normal - Samole Purge to NORMAL.
4.9.10 Turn Selector Switch to SOLUTION CHANGE OUT.
i 4.10 Preparation for Sampling 4.10.1 Set the 500 ml sample bottle in a clear poly bag. Place the
- , , portable shielded container on the floor under the Thio-
- _. 3 sulfate sampler (lef t side of panel), and place the sucple
( bottle in the shielded container.
V 1
HP/2/A/1009/17 Pag 2 5 of 8
- 4.10.2 Detach the left side of the flexible tubing on the .
1 thiosulfate sampler located on the left side of the sample '
panel near the floor. ,
l 4.10.3 Insert the free end of the tubing into the 500 ml sample i bottle.
4.10.4. Complete Steps a) and b) below if a 100 ml gas bomb will be used for the gas sample. If the gas sample will be
. drawn by. syringe, go to Step 4.10.5.
- a) Detach the side of the flexible tubing farthest away from the sample panel on the gas sampler located on the right side of the sample panel near the floor.
b) Attach a 700 ml gas bomb between the free end of the flexible tubing and the hard piping on the gas sampler.
4.10.5 Record sample line temperature reading for sample volume calculations on Enclosure 5.2.
4.11 Flush Thiosulfate Sampler and fill with Thiosulfate.
4.11.1 Depress ACTIVATE button.
4.11.2 Depress FLUSH button and hold for 30 seconds.
. 4.11.3 Depress PURGE button and hold for 30 seconds.
^ ~ ~ 4.11.4 'DeYressEMP8-butto'nandholdfor30 seconds.
4.11.5 Open the TS (thiosulfate) valve located inside the sample panel directly below the fillport. (Open valve in same manner as valves in Step 4.4).
4.11.& Move Refill toggle switch to ON (up) and wait 2 minutes.
Move Refill to 0FF (down).
4.11.7 Turn Selector Switch to DILUTION VOLUME EVACUATION.
4.12 Evacuate the Dilution Volume.
4.12.1 Depress ACTIVATE button and watch pressure gauge drop to N - 19" of Hg. Turn Selector Switch to SAMPLE RECIRC.
4.13 Recire Containment Air and Trap a Sample.
4.13.1 Depress ACTIVATE button and wait 10 minutes. l 4.13.2 Return to sample panel and note pressure gauge reading on sample inlet line. Record pressure on Enclosure 5.2.
4.13.3 Depress SAMPLE button and wait 1 minute.
HP/2/A/1009/17
. Paga 6 of 8 4.13.4 Depress TRAP button and wait 10 seconds.
4.13.5 Turn Selector Switch to SAMPLE DILUTION.
4.14 Dilute Sample with Na and Recire.
4'.14.1 Depress ACTIVATE button.
4.14.2 Depress SLOW button and watch' pressure gauge slowly rise to 0" of Hg. Depress STOP button.
4.14.3 Depress RECIRC button and wait 5' minutes. J 4.14.4 Complete step a) if a syringe vill be used for the gas sample. If a 100 ml gas bomb is being used for the gas sample, continue on to Step 4.14.5.
a) Insert the calibrated gas syringe into the septum on the gas sampler. Withdraw a 5 cc sample of gas and place the synnge into the portable shielded container.
4.14.5 Depress the STOP button on the control panel.
4.14.6 Turn the Selector Switch to SOLUTION CHANGE 0UT. l 4.15 Collect Particulate and Iodine Sample.
4.15 .1 Depress ACTIVATE button.
'~ '
4.15.2 - D$ press TS SAMPLE'liutton.
~
4.15.3 Depress and hold EMPTY button until thiosulfate solution has drained into 500 mi sample bottle.
4.15.4 -
Depress TS SAMPLE GRAB button.
4.15.5 Depress PURGE button and hold for 1 minute.
4.15.6 Turn the Selector Switch to SYSTEM PURGE.
4.16 Purge the Sample Panel.
4.16.1 Depress ACTIVATE button.
4.16.2 Depress EVAC button and watch pressure gauge slowly drop to N - 19" of Hg. Depress STOP button.
4.16.3 Press down and release GAS PURGE toggle switch and watch pressure swiftly rise to + 10" of Hg. Depress STOP button.
4.16.4 Depress EVAC button and watch the pressure gauge drop to 0" of Hg. Depress STOP button.
HP/2/A/1009/17 Pcgi 7 of 8 .
4.16.5 Depress the PUMP button and wait 30 seconds. Depress STOP '
button.
4.16.6 Repeat Steps 4.16.2 through 4.16.5 to purge the sample panel one additional time. .
4.17 Remove Samples from Sample Panel.
4.17.1 Return to the sample panel and close both valves on the gas bomb (if used.)
4.17.2 Disconnect the gas bomb (if used) from the semple panel.
Place gas bomb in portable shielded container.
4.17.3 Tightly cap the 500 ml sample bottle.
4.18 Switching the Sample System Off.
4.18.1 Turn the {;1ector Switch to O H.
4.18.2 Turn the Radiation Monitor to O H.
4.18.3 Turn the Kehk Switch to OH.
~
F 4.18.4 Close the following valves:
l a) Nitrogen bottle - next to sample panel t
, b) TS Valve - inside sample panel
' c a- c
'i DI WatWr Inisti, Instrument Air Inlet, N2 Inlet (On left side of sample panel) 4.19 Transport the samples to the Count Room for analysis.
4.20 Calculate the sample volume using the data from Enclosure 5.2. Record this volume on sample data sticker.
NOTE: If sample cannot be counted because of high activity, further dilute the gas samples. as per procedure HP/0/3/1006/07.
4.21 Transmit sample analysis results to the Station Health Physicist or his designee.
4.22 Request Operations to return the Hydrogen Analyzer to service per Enclosure 5.6 or 5.7.
5.0 Enclosures 5.1 Sampling Equipment 5.2 Sample Data Sheet
HP/2/A/1009/17 Paga 8 of 8
,.... 5.3 Operations Checklist for Bypassing H2 Analysis Panel Currently in
. Standby Mode 5.4 Operations Checklist for Bypassing Hz Analysis Panel Currently in Analyze Mode 5.5 Checklist for Operation of Sample Panel 5.6 Operations Checklist for Returning Hz Analysis Panel Back to Service in Standby Mode 5.7 Operations checklist for Returning Hz Analysis Panel Back to Service in Analyze Mode 5.8 Valve Checklist for Sample Panel 5.9 Control Panel Diagram 5.10 Flow Diagram t
e 4
9 l
Pega 1 of 1 ENCLOSURE 5.1 _ _ ,
HP/2/A/1009/17 ,
SAMPLING PANEL EQUIPMENT 1 Nalgene 500 al Thiosulfate sample bottle ~.
2 Stainless Steel Gas Bombs 1 9/16" Combination Wrench 1 Stainless Steel Portable Shielded Container 1 Stopwatch I bottle Thiosulfate Solution (500 ml) 2 10" x 12" Clear Poly Bags 1 Calibrated Gas Syringe 1 Buc'ket s N i
.. =,
~-
e..-
m
- - - - --- w -
y -
Paga 1 of 1 l
1 ENCLOSURE 5.2 HP/2/A/1009/17 ,
SAMPLE DATA SHEET
- 1) NAME DATE UNIT
- 2) Sample Line Temperature
- 3) Sample Inlet Line Pressure
- 4) Gas Sample Volume = SV SV = 4307.1 (STV) = ml (275.224 + .555 [*F]) (14.7 + P) where:
t
- F = Sample Line Temperature P = Sample Inlet I;ine Pressure STV = Sample Trap Volume Unit 2 = 1.3 al -
- 5) Diluted Volume = g4= ml _ , . . .
- 6) Record Diluted Volume as Gas Sample Volume on Sample Label.
- 7) Record Iodine and Particulate Sample Volume as 1.3 al of sample in 500 ml of thiosulfate solution on sample label.
i i
l l
l Pagn 1 of 2 ,
t Checked Control Copy Date
- l ENCLOSURE 5.3 HP/2/A/1009/17 OPERATIONS CHECKLIST FOR BYPASSING
. Hz ANALYSIS PANEL CURRENTLY IN STANDBY MODE VERIFICATION DATE DATE INIT./ TIME INIT./ TIME 1.0 Initial Conditions 1.1 Containment Integrity is required.
1.2 Designate a Licensed Operator assigned to 2 immediately close containment isolation valves from the Control Room if an ES G
actuation occurs. This person may have other responsibilities, but they shall not prevent him from performing this - - ..n.
evolution. -
License Operator Unit Supervisor ~
1.3 Record that. the containment isolation valves j that will be opened on Enclosures 5.1 and 5.6 of ; - .
OP/0/A/1102/20 (Shift Turnover). (2PR-81 and 2PR-84 or 2PR-90 and 2PR-87) -
1.4 Hz Analysis Panel is in Standby Mode.
1.5 Reactor building pressure is less than 40 psig.
2.0 Procedure 2.1 Place Post Accident Sampler in service as follows:
2.1.1 Select which train to be used. Circle one: Trn. "A" or Trn. "B".
3 2.1.2 Ensure train is in standby mode by observing red light in gray cabinet.
I NOTE: Use other train if not in standby.
Pega 2 of 2 ENCI.0SURE 5.3 HP/2/A/1009/17
- VERIFICATION DATE DATE INIT./ TIME INIT./ TIME 2.1.3 At the selected train " Remote" Panel (blue cabinet), depress both black ON buttons for 'BYP TO POST AC', Opens T2PR-83,2PR-86)or(2PR-89,2PR-92).
2.1.4 Turn sample valve selector switch to
' Top Cont'. Opens 2PR-71 or 2PR-76.
(Red light will come on).
2.1.5 From the Control Room, open 2PR-81 and 2PR-84 (Containment Isolation Valves' if train "A" was selected.
OR Open 2PR-87 and 2PR-90 (Containment Isolation Valves) if train "B" was selected. .
CAUTION: If ES actuation occurs, immediately close isolation valves for containment isolation.
2.1.6 Notify ynit Supervisor which train is selected.. .
Unit Supervisor 2.1.7 Return completed enclosure to Health Physics Personnel operating Sample Panel.
I l
l l
Pags 1 cf 1 Checked Control Copy ,
T Date ,
/
ENCLOSURE 5.4 HP/2/A/1009/17 OPERATIONS CHECKLIST FOR BYPASSING Hz ANALYSIS PANEL CURRENTLY IN ANALYZE MODE VERIFICATION DATE DATE INIT./ TIME INIT./ TIME, 1.0 Initial Conditions 1.1 HzAnalyzer is in Analyze Mode.
1.2 Reactor building pressure is less than 40 psig.
2.0 Procedure 2.1 Place Post Accident Sampler in service as follows: ,
~ '
'2.1.1 Select which train is"to be used.
Circle due: Trzi.] "A" o r Trn. "B" .
2.1.2 At the " Remote" Panel (blue cabinet),
position the "Off Standby, Analyze" selector to " Standby" and observe red light in grey cabinet.
2.1.3 At selected train " Remote" Panel (blue cabinet), depress both black ON buttons for 'BYP TO POST AC'. Opens T2PR-83, 22R-86) or (2PR-89, 2PR-92).
2.1.4 Notify Unit Supervisor which train is !
selected. !
Unit Supervisor 2.1.5 Return completed enclosure to Health Physier Personnel operating Sample Panel.
- , , - - , - - - . - - - + - * --,--%=,- -ees-----w - - - - - -% - - m. - - - - +
Paga 1 of 7 1
Checked Control Copy Date ,
l ENCLOSURE 5.5 l KP/2/A/1009/17 1 CHECKLIST FOR OPERATION OF SAMPLE PANEL NOTE: Complete steps in order listed. Initial steps as completed.
A) Switching System On
- 1) Operations Bypass Hz Analyzer by Enclosure 5.3 or 5.4.
- 2) Obtain Sampling Equipment and Keys.
- 3) Open Nitrogen bottle to 40 psig.
- 4) Open:
a) DI Water Inlet b) Instrument Air Inlet c) N2 Inlet
- 5) Ensure test tees on sample inlet and outlet lines are closed.
~
~
- 6) a) Position thiosulfate funnel b) Attach hose to fill port c) Pour 500 al of thiosulfate into funnel.
f) Set switches on control panel:
a) Sample Volume Select - set on SMALL.
b) Dilution Volume Select - set on LARGE.
c) Selector Switch - set on OFF.
d) System Purge - set on NORMAL.
e) Refill Switch - set on OFF (down).
l f) TC Switch - set on POSITION 1 (measures sample line temperature).
g) Samole Line Select Switch - Unit and Rydrogen Analyzer Train A
! or B i 8) Key Lock Switch - POWER ON l
l
Paga 2 of 7 ENCLOSURE 5.5 HP/2/A/1009/17 .
CHECKLIST FOR OPERATION OF SAMPLE, PANEL
- 9) a) Radiation Monitor - ON (up)
~
b) Radiation Monitor Selector - BATT,(red test region) c) Radiation Monitor Selector - MR/HR or R/HR B) Purge the Sample Panel
- 10) Selector Switch - SYSTEM PURGE
- 11) Normal - Sample Purge - SAMPLE PURGE 0 O C 12) a) ACTIVATE b) EVAC c) t Pressure slowly drops to * - 19" of Hg.
1 l d) STOP , - L . ". , -
O. O a 13) a) GAS PURGE press down and release.
- b) Pressure swiftly rises to + 10" of Hg.
4 c) STOP O O O 14) a) EVAC b) Pressure drops to 0" of Hg.
c) STOP l C C 0 15) a) PUMP - wait 30 seconds b) STOP Q O O 16) a) Purge sample panel two (2) more times by completing Steps 12 through 15 two (2) more times.
- 17) Normal - Sample Purge - NORMAL I,
\
Paga 3 of
^ '
ENCLOSURE 5.5 l HP/2/A/1009/17 I CHECILIST FOR OPERATION OF SAMPLE, PANEL
- 18) Selector Switch - SOLUTION CHANGEOUT C) Preparation for Sampling
- 19) Attach 500 m1 sample bottle to TS Sampler.
- 20) Attach gas bomb to gas sampler (N/A step if syringe will be used instead of gas bomb).
- 21) Record sample line temperature on Enclosure 5.2.
D) Flush Thiosulfate Sampler and fill with Thiosulfate 1
- 22) a) ACTIVATE
~ '
b) FLUSH - hold 30 seconds c) PURGE - hold 30 seconds d) EMPTY - hold 30 seconds e) Open TS (thiosulfate) valve
~
f) Refill - g - wait 2 minutes g) Refill - 0FF
- 23) Selector Switch - DILUTION VOLUME EVACUATION E) Evacuate the Dilution Volume
- 24) a) Activate b) Pressure slowly drops to * - 19" of Hg.
c) Selector Switch - SAMPLE RECIRC
Paga 4 of 7 ENCLOSURE 5.5 s HP/2/A/1009/17 ',
CHECKLIST FOR OPERATION OF SAMPLE, PANEL F) Recire Containment Air and Trap a Sample ACTIVATE - wait 10 minutes 25)
- 26) Return to sample panel - note and record sample inlet line pressure on Enclosure 5.2.
- 27) a) SAMPLE - wait 1 minute b) TRAP - wait 20 seconds c) Selector Switch - SAMPLE DILUTION G) Dilute Sample with Na and Recire.
- 28) a) ACTIVATE b) SLOW
- . .z.- -
c) Pressure slowly rises to 0" of Hg.
d) STOP
- 29) RECIRC - wait 5 minutes
- 30) Complete a) if syringe will be used for gas sample. If gas bomb is being used, N/A this step and continue on to Step 31. ,, ,
~
a) Withdraw a 5 ce gas sample from the septum of the gas sampler using calibrated syringe. Place syringe in portable shielded container.
- 31) a) STOP
, b) Selector Switch - SOLUTION CHANGE 0UT ;
i i
l l
l l
Paga 5 of 7
\
I ENCLOSURE 5.5
^'
HP/2/A/1009/17 CHECELIST FOR OPERATION OF SAMPLE. PANEL H) Collect Particulate and Iodine Sample
- 32) a) ACTIVATE b) TS SAMPLE c) EMPTY - hold button until thiosulfate solution has drained into sample bottle, d) TS SAMPLE GRAB e) PURGE - hold button 1 minute
- 33) Selector Switch - SYSTEM PURGE I) Purge the Sample Panel.
s
- - ..z.
O C 34) a) ACTIVATE b) EVAC c) Pressure slowly drops to * - 19" of Hg.
d) STOP
~
C C 35) a) GAS PURGE press down and release b) Pressure swiftly rise to + 10" of Eg.
c) STOP
{
O O 36) a) EVAC b) Pressure drop to 0" of Hg.
c) STOP n , - - , - - - -, - , . -,. -- , n c -,w,,m. , ,.-, ,- n
Pega 6 of 7 ENCLOSURE 5.5 s HP/2/A/1009/17 CHECKLIST FOR OPERATION OF SAMPLE, PANEL 0 0 37 a) PUMP - wait 30 seconds b) STOP Q c 38) Repeat Steps 34 through 37 one additional time.
J) Remove Samples from Sample Panel
- 39) Return to sample panel and close both valves on the gas bomb.
(N/A step if gas bomb not used).
- 40) Disconnect gas bomb from sample panel. Place gas bomb in portable shielded container. (N/A step if gas bomb not used).
- 41) Tightly cap sample bottle.
t
.z. -
K) Switching System Off
- 42) Selector Switch - CFF
- 43) Turn the Radiation Monitor - 0FF
- 44) Key Lock Switch - 0FF _,,- .
- 45) Close: ..
a) Nitrogen bottle b) TS Valve - inside sample panel .
c) DI Water Inlet d) Instrument Air Inlet e) N 2 Inlet i
1
Pcga 7 of 7 ENCLOSURE 5.5
-x HP/2/A/1009/17 CHECELIST FOR OPERATION OF SAMPLE, PANEL I
- 46) Transport samples to Count Room for analysis.
- 47) Calculate sample volume using data from Enclosure 5.2. (Dilute gas samples per HP/0/B/1006/07 if neede'd).
- 48) Transmit sample analysis results to Station Health Physicist or his designee.
- 49) Request Operations to return the Hydrogen Analyzer to service per Enclosures 5.6 or 5.7.
- . ..n. t * - ~
6 g Y.
ee l
l
. . - , ., ,._v -- . ....-
Paga 1 of 1 9
Checked Control Copy l Date ,
ENCIOSURE 5.6 HP/2/A/1009/17 .
OPERATIONS CHECILIST FOR RETURNING Hz ANALYSIS PANEL BACK TO SERVICE IN STANDBY MODE VERIFICATION DATE DATE INIT./ TIM", INIT. /TLE 1.0 Procedure 1.1 Return the Hz Analysis train back to service as follows:
1.1.1 Turn Sample Valve Selector switch to 0FF. (Red light will go off). Closes 2PR-71 or 2PR-76.
s ;
1.1.2 Depress the OFF buttons on both - . . _ _ _
'BYP TO POST AC> switches. Closes ~~
(2PR-83, 2PR-86) or (2PR-89, 2PR-92).
1.1.3 From the Control Room, Close 2PR-81 and 2PR-84 if train "A" is selected.
2PR-90 if train "B" was selected. - ' -
~
NOTE: This will regain containment integrity.
Remove the containment isolation valves from Enclosure 5.1 and 5.6 of OP/0/A/1102/20 (Shift Turnover).
1.1.4 Notify the Unit Supervisor the Hz Analysis Train is back in service.
1.1.5 Return completed enclosure to personnel operating Post Accident 3 ample Panel.
1
+, , , .- , - .,,.g. - .,e -.
Paga 1 of 1 Checked Control Copy Date ,
I ENCLOSURE 5.7 HP/2/A/1009/17 OPERATIONS CHECKLIST FOR RETURNING UNIT 2 Hz ANALYSIS PANEL BACK TO SERVICE IN ANALYZE MODE ,
VERIFICATION DATE DATE
,r.IT./ TIME INIT./ Time 1.0 Initial Conditions 1.1 Hz Analysis Panel has been switched to Standby Mode for Post Accident sampling and is to be returned to Analyze Mode. .
2.0 Procedure 2.1 Return the Hz1 Analysis train back to service as follows:
' ~ ~"~ ~
2.1.1 Depress the OFF buttons on both l "BYP to Post AC" switches. Closes (2PR-83, 2PR-86) or (2PR-89, 2PR-92).
2.1.2 Position the "Off, Standby, Analyze" Selector to Analyze.
NOTE: Wen Analyze is selected, the indication -
will go up scale resulting in a possible High Hydrogen Alarm on both panels and in _
tue Control Room. Then return down scale to the correct reading in approximately 3 minutes. ,
2.1.3 Push the Remote Selector button to ensure control is from Remote Panel.
2.1.4 Reset the Common Alarm after the meter reading stabilizes.
2.1.5 Notify the Unit Supervisor the Hz Analysis Train is back in service. j l
Return completed enclosure to Health l 2.1.6 Physics Personnel Operating Post i Accident Sample Panel. l l
Pega 1 of 1 9
ENCIOSURE 5.8 HP/2/A/1009/17 ,
VALVE CHECELIST FOR SAMPLE PA EL NOTE: This checklist may be used to provide assistance in determining flow inside the sample panel. It is not intended to provide a verification for valve operation.
ACTION RESPONSE Dilution Volume Evacuation
- Activate Energi.4 1, 2, 9, 12, 19, 17 Sample Recirculate
- Activate Energize 1, 2, 5, 6, 27
- Sample De-energize 27
- Trap De-energize 2, 5 Sample Dilution
- Activate 1 Energize 12, 17 '
- Slow Energize 3, 20
- Stop De-energize 3, 20 , . , , _
- Recire Energize Recire Pump l'6, ~13'-
NOTE: Valve #17 will de-energize when selector switch is moved to another position.
System Purge Energize 9, 12, 19, 27
- Activate ~
Energize 12, 22
- Evac Energize 1, 2 .
- Stop De-energize 1, 2-
- Gas Purge (down) Energize 15, De-energize 1, 2
- Stop De-energize 15
- Normal - Sample Purge (Sample Purge) Energize 17
- Pump Energize Pump 16, 18 De-energize 15, or 1 and 2
- Stop De-energize Pump 16, 18 Solution Change Out
- Empty Energize 10, 11, 13
- Flush Energize 14, 10
, - Purge Energize 15, 10 1
! - Refill Energize 11, 13 l
l - TS Sample Energize 21 <
j - TS Sample Grab De-energize 21 l
1
)
Hedium .
Small 1.arge Sample Recirc Trap Area 3go, pfjgpa g o on l/ Evacuation e ee@@
\
O I Sample Trap '
. Inert Cas Recirc Dilution Volume Select 1111ution Volume System Purge .
Evacuation Small- 5 E 1.arge h Ingresa Pro- e----
w h Evac pjRe Pump Selector Stop l O Sample Volume Select Normal Nke" h off $ k
' E Unit 1 7 'I Solution Change Out i
8% eB l Unit 2 Off Empty Purge
{@
Activate i
f*
On Flush Sample 1.ine Select yfil g TS TS
, Fuse 1 Fuse 2 *P Sample c"rab l
- 0'
.t5 300 Oe l -
2 :
t
! V' 'O g-250 Sump Pum Power on , g p u -0 P
I Tc M- 15 T ~150 R' P'
1 u
- f 0 ,
Radiation g g,=
-20 a 100 8
O Honitor E R
' r -25 $r y I l I
Dilution cylinders Thiosulfate
- Fill Port )
PresjureTransmitter Vent < r b (It '3 f) {
f ) (H TS ^
Outlet Tank
~
~ ""# U T 2 !?
b :1 X$
-8!6 -hi. Sample V l g l m
r
)) L ,Y Volume -kgI k) k) p
- , - li ~
4 2 L pi t.
Inlet TS I() Sample M a. ,
- Cylinder .
kb e Cylinder Recire Pump gg n y
~
- u. - $
m Ybl~
l I g
ggGM ONLY Form SPD-1002-l' CONTROL COPY '
DUKE POWER COMPANY (1) ID No: HP/3/A/1009/17 PROCEDURE PREPARATION Change (s) NA to PROCESS RECORD ,
Incorporated i
I (2) STATION: Oconee (3) PROCEDURE TITLE: Onernedng Proc dure fnv on ce-An-44.?e Containment
__A4* Cmmn1dne Ryee (4) PREPARED BY: b McJb (nu DATE: b b-D (5) REVIEWED BY: h DATE: "(( "$
Cross-Disciplin.ary Revi By: b$ M N/R:
J 6 -f- r3 (6) TEMPORARY APPROVAL (IF NECESSARY):
By: (SRO) Date:
By: e Date:
~ ~
(7) APPROVED BY: }- Date: 3 (8) MISCELLANEOUS:
Reviewed / Approved By: Date:
Reviewed / Approved By: Date:
l l
HP/3/A/1009/17 Paga 1 of 8 DUKE POWER COMPANY OCONEE NUCLEAR STATION ,
~
OPERATING PROCEDURE FOR POST-ACCIDENT CONTAINMENT AIR SAMPLING SYSTEM i
. 1.0 Purpose
- ' This procedure describes the operation of the Post-Accident Containment Air Sampling System which is used to obtain a prompt containment air sample under accident conditions while keeping radiation exposure ALARA.
This crocedure is also used to perform the semi-annual functional test of the system.
2.0 References 2.1 Duke Power Company Nuclear Station Post-Accident Containment Air Sampling System Manual 2.2 HP/0/B/1006/07, Procedure for Preparation of Gas Calibration Sources 2.3 CP/1/A/2002/04C, Operating Procedure for the Post Accident Liquid Samplingt(PALS) System
~
~ .2. 4 HP/0/3/1009/15, Procedure for Sampling and Quantifying High Level Gaseous, Radioiodine and Pa h iculate Radioactivity 2.5 EP/0/A/1800/04, Loss of Coolant 3.0 Limits and Precautions l 3.1 The sampling cycle will require two (2) qualified technicians approximately one (1) hour per sample, of which about ten (10) minutes will be spent in the sample panel area. One qualified technician will operate the control panel while the other will pdeform transit duties to and from the panel.
3.2 Personnel communications can be achieved by phone.
Unit 1 & 2 - Ext. 1268 (by column AX-38) -
Unit 3 -
Ext. 1396 (by door to RCA) j 3.3 The following items will never be used on the panel.
- a. Trap Area Evacuation
- b. Fast Sample Dilution
HP/3/A/1009/17 Pega 2 of 8
- i 3.4 The Recire Pump must never be used at any pressure other than 0 inches of Mercury.
3.5 Moving the Selector Switch from one mode t;o'another stops all current !
system operations. Depressing the Activate button starts operation l of the newly selected mode. ,
3.6 The radiation monitor on the control panel will provide levels of radiation at the sample panel. If the radiation monitor is not working properly, then a portable survey instrument will be used to determine radiation levels.
3.7 If problems with the pressure and/or temperature gauge are evident, such as going off scale oc erratic response, the Selector Switch must be turned to the O_q mode and sampling discontinued until the Problem is corrected.
3.8 If the sampling system cannot be operated, then HP/0/B/1009/15 (Ref. 2.4) will be used as an alternate method for obtaining a containment air sample.
3.9 Enclosure 5.5 will be used to check off the steps as the procedure is completed.
3.10 Operations must complete Enclosure 5.3.or.5.4 to bypass the Hydrogen Analyzer to bring containment air to the sampling system and to return the Hydrogen Analyzer to service after sampling is complete by Enclosure 5.6 or 5.7.
._ _ 3.11 The front side of the sample panel is the side which contains the.d_oor. _
The left and right side of tL sample panel will be determined by~
using this fact.
3.12 If radiation levels exceed 16 R/hr and cannot be reduced by purging the system, secure operation of the panel, move to a low background area, and contact the Station Health Physicist or his designee for further instructions.
~
~
3.13 Before sampling operations begin, the decisica must be malis ba' sed on'~
radiological conditions in the reactor building and the sampling area _
whether to use a 100 ml gas bomb or a calibrated syringe for the gas sample. During emergency conditions, this decision will be made by the Station Health Physicist or his designee.
. 3.14 Enclosure 5.8, Valve Checklist for Sample Panel, may be used to provide assistance in determining flow inside the sample panel. It is not intended to provide a verification for valve operation.
3.15 During accident conditions, the keys needed for sampling will be located in the Shiftman's key cabinet.
3.16 The sampling system must not be used if reactor building pressure is greater than 40 psig.
i l
I l
l l
. - - .- ,- - . - - - - - , - , - - ~, , , , - - - - - , , , - - . _ - . . , , , - - . ,~
HP/3/A/1009/17 Pega 3 of 8 4.0 Procedure -
4.1 Locate the Shift Supervisor for Operations and request that Operation.
complete Enclosure 5.3 or 5.4 to bypass the Hydrogen Analyzer so the Post Accident Containment Gas Sampling System may be operated.
4.2 Obtain equipment necessary to perform sampling, including the thio-sulfate solution. Also obtain keys to the control panel and the sixth floor Ventilation Equipment Roca.
NOTE: Necessary equipant for saa.pling is listed on Enclosure 5.1.
4.3 Open the valve on the nitrogen bottle next to the sampling panel to 40 psig.
I 4.4 Open the (a) DI Water Inlet (b) Instrument Air Inlet (c) N 2 Inlet located on the.left side of the sample panel.
NOTE: Open inlets by rotating the back switches counterclockwise 1 one quarter turn to the upward position.
4.4.1 Ensure the test tees on the sample inlet and outi et
~
l lines are ' ' ' '
closed.
4.5 Position the thiosulfate funnel directly over the fill port located on top of the sample panel. Attach the hose on the funnel to the fill port and pour the 500 al of thiosulfate solution into the funnel.
4.6 Set the switches listed below as follows:
~
(a) Sample Volume Select - set on SMALL ~~
(b) Dilution Volume Select - set on LARGE ,
(c) Selector Switch - set on O E l (d) System Purge - set on NORMAL (e) Refill Switch - set on O H (down)
(f) TC Switch - set on POSITION 1 (thermocouple measures sample line temperature)
I 1
i
- l l
HP/3/A/1009/17 Pagn 4 of 8 (g) Sample Line Select Switch - turn to Unit and Hydrogen Analyzer (Train A or B) being used for this operation of the sampling system 4.7 Turn the Key Lock Switch to POWER ON and ensure the power on light has come on.
4.8 Turn the Radiation Monitor toggle switch ON (up).
-4.8.1 Turn the selector on the Radiation Monitor to BATT and ensure the needle is in the " red test region." Turn the selector to the MR/HR or R/HR scale.
NOTE: If the Radiation Monitor is not functioning properly, note that is is not working on Enclosure 5.5, Step 9 and use a portable survey instrument .
to determine radiation levels during sampling.
4.9 Purge the Sample Panel.
4.9.1 Turn Select Switch to SYSTEM PURGE 4.9.2 Move Normal - Sample Pur g to SAMPLE PURGE 4.9.3 Depress ACTIVATE button.
4.9.4 : Depress EVAC button (Evac light on) and watch pressure gauge slowly drop to * - 19" of Hg. Depress STOP.
~
~
4.9.5 Press down and release the GAS PURGE' toggle switch an'd ~
watch the pressure gauge swif tly rise to + 10" of Hg.
Depress STOP button.
4.9.6 Depress the EVAC button and watch the pressure gauge drop' ,
to 0" of Hg. Depress STOP button.
4.9.7 Depress the PL71P button and wait for 30 seconds. .. Depress _ _ ~ '
STOP button.
4.9.8 Repeat Step 4.9.4 through 4.9.7 twice to purge the simple panel two more times.
~
4.9.9 Move Normal - Samole Durge to NORMAL.
4.9.10 Turn Selector Switch to SOLUTION CHANGE OUT.
4.10 Preparation for Sampling 4.10.1 Set the 500 ml sample bottle in a clear poly bag. Place the l portable shielded container on the' floor under the Thio-sulfate sampler (left side of panel), and place the sample bottle in the shielded container.
I l
' l HP/3/A/1009/17 Page 5 of 8 4~.10.2 Detach the left side of the flexible tubing on the chiosulfate sampler located on the left side of the sample panel near the floor, ,
4.10.3 Insert the free end of the tubing into the 500 ml sample
_ bottle.
4.10.4. Complete Steps a) and b) below if a 100 ml gas bomb will be used for the gas sample. If the gas sample will be drawn by syringe, go to Step 4.10.5.
a) Detach the side of the flexible tubing farthest away from the sample panel on the gas sampler located on the'right side of the sample panel near the floor.
b) Attach a 100 C. gas bcmb between the free end of the flexible tubing and the hard piping on the gas sampler.
4.10.5 Record sample line temperature reading for sample volume calculations,or. Enclosure 5.2.
4.11 Flush"fhiosulfate Sampler and fill with Thiosulfate.
l 4.11.1 s Depress ACTIVATE buttcu.
( 4.11.2 Depress FLUSH button and hold for 30 seconds.
4.11.3 Depress PURGE button and hold for 30 seconds.
4.11.4 Depress EMPTY button and hold for 30 seconds.
4.11.5 Open the TS (thiosulfate) valve located inside the sample panel directly below the fillport. (0 pen valve in same manner as valves in Step 4.4).
4.11.6 Move Refill toggle. switch to ON (up) and wait 2 minutes.
Move Refill to 0FF (down). _
, 4.11.7 Turn Selector Switch to DILUTION VOLUME EVACUATION.
4.12 Evacuate the Dilution Volume.
l, l' 4.12.1 Depress ACTIVATE button and watch pressure gauge drop l to * - 19" of Hg. Turn Selector Switch to SAMPLE RECIRC.
l l 4.13 Recire Containment Air and Trap a Sample.
L 4.13.1 Depress ACTIVATE button and wait 10 minutes.
t 1
4.13.2 Return to sample panel and note pressure gauge reading on
,. sample inlet line. Record pressure on Enclosure 5.2.
4.13.3 Depress SAMPLE button and wait 1 minute.
l
HP/3/A/1009/17 Pcg2 6 of 8 4.13.4 Depress TRAP button and wait 10 seconds.
4.13.5 Turn Selector Switch to SAMPLE DILUTION.
4.14 Dilute Sample with Na and Racire.
4.14.1 Depress ACTIVATE button.
4.14.2 Depress SLOW button and watch pressure gauge slowly rise to 0" of V Depress STOP button.
4.14.3 Depress RECIRC button and wait 5 minutes.
4.14.4 Complete step a) if a syringe will be used for the gas sample. If a 100 al gas bomb is being used for the gas sample, continue on to Step 4.14.5.
a) Insert the calibrated gas syringe into the septum on the gas sampler. Withdraw a 5 cc sample of gas and place the syringe into the portable shielded container.
4.14.5 Depress the STOP button on the control panel.
4.14.6 Turn the Selector Switch to SOLUTION CHANGE 00T.
4 4.15 Collect Particulate and Iodine Sample.
j s l
4.15.1 Depress ACTIVATE button.
~ ~
4.15.2 Depress TS $ AMPLE button.
4.15.3 Depress and hold EMPTY button until thiosulfate solution has drained into 500 31 sample bottle.
4.15.4 Depress TS SAMPLE GRAB button.
4.15.5 Depress PURGE button and hold for 1 minute. ; ,
4.15.6 Turn the Selector Switch to SYSTEM PURGE. ,.
4.16 Purge the Sample Panel.
4.16.1 Depress ACTIVATE button.
t 4.16.2 Depress EVAC button and watch pressure gauge slowly drop to N - 19" of Hg. Depress STOP button.
4.16.3 Press down and release GAS PURGE toggle switch and watch pressure swiftly rise to + 10" of Hg. Depress STOP button.
4.16.4 Depress EVAC button and watch the pressure gauge drop to 0" of Hg. Depress STOP button.
i
. me - , - - , - - - - - - - - - , e ,n.e-o-- e=- -,-,-, - . ,- >---,,,,, ,. .,-we,
HP/3/A/1009/17 Page 7 of 8 4.16.5 Depress the PUMP button and wait 30 seconds. Depress STOP button.
4.16.6 Repeat Steps 4.16.2 through 4.16,.5 to purge the sample panel ocn additional time. -
4.17 Remove Samples fr m Sample Panel. 1 i !
4.17.1 Return to the sample panel and close both valves on the gas I bomb (if used.)
4.17.2 Disconnect the gas bomb (if used) frqa the sample panel.
Place gas bomb,in portable shielded container.
4.17.3 Tightly cap the 500 ml sample-bottle.
4.18 Switching the Sample System Off.
4.18.1 Turn the Selector, Switch to 0FF.
4.18.2 Turn the Radiation Monitor to 0FF.
4.18.3 Turn the Keylock Switch to 0FF.
4.18.4 Close the following valves:
i a) Nitrogen bottle - next to sample panel s
b) TS Valve - inside sample panel c) DI Wa'ter Inlet, InstrumentAirInlet,Ngkalet (On left side of sample panel) 4.19 Transport the samples to the Count Room for analysis.
4.20 Calculate the sample volume using the data from Enclosure 5.2. Record this volume on sample data sticker.
NOTE: Ifsamplecannotbecountedbecauseofhighact$i.'vit'y,furYher dilute the gas samples as per procedure HP/0/B/1006/07.
4.21 Transmit sample analysis results to the Station Health Physicist or his designee.
4.22 Request Operations to return the Hydrogen Analyzer to service per Enclosure 5.6 or 5.7.
5.0 Enclosures 5.1 Sampling Equipment 5.2 Sample Data Sheet i
1 - . . ._- . .. . ._- - . . - ..
HP/3/A/1009/17 l
Pego 8 cf 8 5.3 Operations Checklist for Bypassing Hz Analysis Panel currently in Standby Mode 5.4 Operations Checklist for Bypassing Hz Analysis Panel currently in Analyze Mode l
5.5 Checklist for Operation of Sample Panel -
5.6 Operations Checklist for Returning Hz Analysis Panel Back to Service in Standby Mode 5.7 Operations Checklist for Returning Hz Analysis Panel Back to Service in Analyze Mode 5.8 Valve Checklist for Sample Panel 5.9 Control Panel Diagram 5.10 Flow Diagram t
. ..O.t
- ee
-y - - .
.g .
,.p, , p.. ,- -.,c _.. -. .,g - - y
1 Paga 1 of 1 l
ENCLOSURE 5.1 . , ,
HP/3/A/1009/17 ,
SAMPLING PANEL EQUIPMENT 1 Na hene 500 al Thiosulfate sample bottle.
2 Stainless Steel Gas Bombs 1 9/16" Combination Wrench 1 Stainless Steel Portable Shielded Container 1 Stopwatch I bottle Thiosulfate Solution (500 ml) 2 10" x 12" Clear Poly Bags I Calibrated Gas Syringe 1 Bucket
- - ..O.*,* ~
~ '
==
l
Pcga 1 of 1 ENCLOSURE 5.2 HP/3/A/1009/17 ,
SAMPLE DATA SEEET
- 1) NAME DATE UNIT
- 2) Sample Line Temperature
- 3) Sample Inlet Line Pressure
- 4) Gas Sample Volume = SV SV = 4307.1 (STV) = ml (275.224 + .555 [*Fj) (14.7 + P) -
where:
t
- F = Sample Line Temperature
. z.
P = Sample Inlet Line Pressure STV = Sample Trap Volume Unit 3 = 1.2 ml
- 5) Diluted Volume = 4= ml ;. ,
- 6) Record Diluted Volume as Gas Sample Volume on S.nsple Label.
- 7) Record Iodine and Particulate Sample Volume as 1.2 ml of sample in 500 ml of thiosulfate solution on sample label.
~
I G
- v. - r --- r ,
P:g2 1 of 2 Checked Control Copy
- Date ,
ENCLOSURE 5.3 HP/3/A/1009/17 .
OPERATIONS CHECKLIST FOR BYPASSING Hz ANALYSIS PANEL CURRENTLY IN STANDBY MODE VERIFICATION I DATE DATE INIT./ TIME INIT./ TIME 1.0 Initial Conditions 1.1 Containment Integrity is required.
1.2 Designate a Licensed Operator assigned to immediately close containment isolation
- valves from the Control Room if an ES actuation occurs. This person may have other responsibilities, but they shall not prevent him from performing this
"~'
evolution.
License Operator Unit Supervisor 1.3 Record the containment isolation -valves that will be opened on Enclosures 5.1 and -
5.6 of OP/0/A/1102/20 (Shift Turnover).
(3PR-81 and 3PR-84 or 3PR-90 and 3PR-87) 1.4 Hz Analysis Panel is in standby mode.
1.5 Reactor Building pressure is less than 40 psig.
! 2.0 Procedure 2.1 Place Post Accident Sampler in service as follows:
2.1.1 Select which train to be used. Circle one: Trn. "A" or Trn. "B".
1 s
m - . , . - - , ,
Peg 2 2 of 2 ENCLOSURE 5.3 HP/3/A/1009/17 .
VERIFICATION DATE DATE INIT./ TIME INIT./ TIME 2.1.2 Ensure train is in standby mode by' observing red light in gray cabinet.
NOTE: Use other train if not in standby.
2.1.3 At the selected train " Remote" Panel -
(blue cabinet), depress both black ON buttons for 'BYP TO POST AC'. Opens 73PR-83, 3PR-86) or (3PR-89, 3PR-92).
2.1.4 Turn sample valve selector switch to
' Top cont'. Opens 3PR-71 or 3PR-76.
(Red light will come on).
2.1.5 From the Control Room, open 3PR-81 and 3PR-84 (Containment Isolation Valves) if train "A" was selected.
OR Open 3PR-87 and 3PR-90 (Containment Isolation Valves) if train "B" was selected. ,
CAUTION: If ES actuation occurs, immediately close isolation valves for containment isolation.
2.1.6 Notify Unit Supervisor which train is selected.
Unit Supervisor .
2.1.7 Return completed enclosure to Health Physics Personnel operating Sample Panel.
1 I
l
Pag 2 1 of 1 Checked Control Copy l
Date ,
ENCLOSURE 5.4 HP/3/A/1009/17 -
i I
OPERATIONS CHECEIST FOR BTPASSING Hg ANALYSIS PANEL CURRENTLY IN ANALYZE MODE VERITICATION DATE DATE INIT./ TIME INIT./ TIME 1.0 Initial Conditions 1.1 H2 Analyzer is in Analyze Mode.
i 1.2 Reactor Building pressure is less than 40 psig.
2.0 Procedure 2.1 Place Post Accident Sampler in service as follows: 1 2.1.1 Select which train is to be used. - . . . ;, - -
Circle one: Trn. "A" or Trn. "B".
2.1.2 At the " Remote" Panel (blue cabinet) position the "Off, Standby, Analyze" selector to " Standby" and observe red light in grey cabinet.
2.1.3 At selected train " Remote" Panel (blue '
cabinet), depress both black ON buttons for 'BYP TO POST AC' . Opens (3PR-83, -
2.1.4 Notify Unit Supervisor which train is j selected.
! Unit Supervisor i
l 2.1.5 Return completed enclosure to Health Physics Personnel operating Sample Panel.
I l
l
. ~ _ - .
l Paga 1 of 7 Checked Control Copy Date .
ENCLOSURE 5.5 HP/3/A/1009/17 CHECELIST FOR OPERATION OF SAMPLE PANEL
~
NOTZ: Complete steps in order listed. Initia1 steps as completed.
A) Switching System On
- 1) Operations Bypass Hz Analyzer by Enclosure 5.3 or 5.4.
- 2) Obtain Sampling Equipment and Keys. .
i 3) Open Nitrogen bottle to 40 psig.
- 4) Open:
a) DI Water Inlet b) Instrument Air Inlet c) Na Inlet
, 1
- 5) Ensure test tees on sample inlet and outlet lines are closed.
- 6) a) Position thiosulfate funnel b) - Attach hose to fill porn c) Pour 500 ml of thiosulfate into funnel
- 7) Set switches on control panel:
a) Sample Volume Select - set on SMALL.
b) Dilution Volume Select - set on LARGE. ,
c) Selector Switch - set on OFF.
d) System Purge - set on NORMAL.
e) Refill Switch - set on OFF (down).
f) TC Switch - set on POSITION 1 (measures sample line temperature).
g) Samole Line Select Switch - Unit and Hydrogen Analyzer Train A or B J i
- 8) Key Lock Switch - POWER ON
- 9) a) Radiation Monitor - OJ (up) j l
l
1 Paga 2 of 7 l
l ENCLOSURE 5.5* ,
HP/3/A/1009/17 ,
CHECKLIST FOR OPERATION OF SAMPLE , PANEL b) Radiation Monitor Selector - BATT (red test region) c) Radiation Monitor Selector - MR/HR or R/HR B) Purge the Sample Panel
- 10) Selector Switch - SYSTEM PURGE
- 11) Normal - Sample Purge - SAMPLE PURGE O O O 12) a) ACTIVATE b) EVAC c) Pressure slowly drops to * - 19" of Hg.
s d) sSTOP O C a 13) a) GAS PURGE press down and release. - . ..;..- -
b) Pressure swiftly rises to + 10" of Hg.
c) STOP O O O 14) a) EVAC b) Pressure drops to 0" of Hg. ;, . _
c) STOP C 0 0 15) a) PUMP - wait 30 seconds b) STOP Q C C 16) a) Purge sample panel two (2) more times by completing Steps 12 through 15 two (2) more times.
l
- 17) Normal - Sample Purge - NORMAL l 18) Selector Switch - SOLUTION CHANGE 0UT
Pega 3 of 7 ENCLOSURE 5.5 HP/3/A/1009/17 CHECKLIST FOR~ OPERATION OF SAMPLE , PANEL C) Preparation for Sampling
- 19) Attach 500 m1 sample bottle to TS Sample'. r
- 20) Attach gas bomb to gas sampler (N/A step if syringe will be used instead of gas bomb).
- 21) Record sample line temperature on Enclosure 5.2.
D) Flush Thiosulfate Sampler and fill with Thiosulfate
- 22) a) ACTIVATE b) FLUSH - hold 30 seconds c) PURGE - hold 30 seconds t
d) EMPTT - hold 30 seconds
. G. ?
e) Open TS (thiosulfate) valve f) Refill - ON - wait 2 minutes g) Refill - 0FF
- 23) Selector Switch - DILUTION VOLUME EVACUATION E) Evacuate che Dilution Volume
- 24) a) ' Activate b) Pressure slowly drops to N - 19" of Hg.
c) Selector Switch - SAMPLE RECIRC
1 Pega 4 of 7 !
ENCLOSURE 5.5 HP/3/A/1009/17 ',
CHECKLIST FOR OPERATION OF SAMPLE , PANEL F) Recire Containmaat Air and Trap a Sample
- 25) ACTIVATE - wait 10 uinutes
- 26) -Return to sample panel - note and record sample inlet line pressure on Enclosure 5.2.
- 27) a) SAMPLE - wait 1 minute b) TRAP - wait 20 seconds 1
c) Selector Switch - SAMPLE DILUTION G) Dilute Sample with N2 and Recire.
- 28) a) ACTIVATE
.T b) SLOS s
~ ~ ~
~-
, c) Pressure slowly rises to 0" of Hg.
d) STOP
- 29) RECIRC - wait 5 minutes
- 30) Complete a) if syringe will be used for gas sample. If gas bomb is being used, N/A this step and continue on to Step 31. ; -
a) Withdraw a 5 ce gas sample from the septum of the gas sampler .
using calibrated syringe. Place syringe in portable shielded container.
- 31) a) STOP j b) Selector Switch - SOLUTION CHANGE 0UT l
l l
l l
l
Pcgs 5 of 7 ENCLOSURE 5.5 HP/3/A/1009/17 CHECKLIST FOR OPERATION OF SAMPLE, PANEL H) Collect Particulate and Iodine Sample
- 32) a) ACTIVATE b) TS SAMPLE c) EfPTT - hold button until thiosulfate solution has drained into sample bottle, d) TS SAMPLE GRAB e) PURGE - hold button 1 minute
- 33) Selector Switch - SYSTEM PURGE I) Purge the Sample Panel.
O O 34) a) ACTIVATE b) EVAC c) Pressure slowly drops to * - 19" of Hg.
d) STOP ,
O C 35) a) GAS PURGE - press down and release b) Pressure swiftly rise so + 10" of Hg.
f c) STOP l l
C C 36) a) EVAC b) Pressure drop to 0" of Hg.
c) STOP 1
l l
l Paga 6 of 7 ENCLOSURE 5.5 m
. HP/3/A/1009/17 CHECKLIST FOR OPERATION OF SAMPLE PANEL Q c 37 a) PUMP - wait 30 seconds b) STOP Q O 38) Repeat Steps 34 through 37 one additional time ~. ~
J) Remove Samples from Sample Panel
- 39) Return to sample panel and close both valves on the gas bomb.
(N/A step if gas bomb not used).
- 40) Disconnect gas bomb from sample panel. Placs gas tomb in portable shielded container. (N/A step if gas bomb not used).
- 1) Tightly cap sample bottle.
~. ,
t
~
K) Switching System Off -
- 42) Selector Switch - 0FF
- 43) Turn the Radiation Monitor - 0FF
- 44) Key Lock Switch - 0FF
- 45) Close:
a) Nitrogen bottle b) , TS Valve - inside sample panel c) DI Water Inlet d) Instrument Air Inlet e) Na Inlet
Peg 2 7 of 7 ENCLOSURE 5.5 HP/3/A/1009/17 CHECKLIST FOR OPERATION OF SAMPLE EANEL
- 46) Transport samples to Count Room for analysis.
- 47) Calculate sample volume using data from Enclosure 5.2. (Dilute gas samples per HP/0/3/1006/07 if neede'd).
- 48) Transmit sample analysis results to Station Health Physicist or his c.asignee.
- 49) Request Operations to return the Hydrogen Analyzer to service per Enclosures 5.6 or 5.7.
t h
n .
Paga 1 of 1 Checked Control Copy s T
Date ,
ENCLOSURE 5.6 HP/3/A/1009/17
, OPERATIONS CHECELIST FOR RETURNING Hg ANALYSIS PANEL BACK TO SERVICE IN STANDBY t! ODE VERITICATION DATE DATE INIT./ TIME INIT./ TIME 1.0 Procedure 1.1 Return the H 2Analysis train back to service as follows:
1.1.1 Turn Sample Valve Selector switch to 1
0FF. (Red light will go off). Closes i 3PR-71 or 3PR-76. -
l t l
. 1.1.2 Depress the OFF buttons on both
~ ' . 'BYP TO POST AC' switches. Closes ._
(3PR-83.,3PR-86)}or(3PR'-89,3PR-92). ~
1.1.3 From the Control Room, close 3PR-81 and 3PR-84 if train "A" is selected.
OR .
Close 3PR-87 and 3PR-90 if train "B" was t.nected.
NOTE: This will regain containment integrity.
Reinove the containment isolation valves from Enclosure 5.1 and 5.6 of OP/0/A/1102/20 (Shift Turnover).
1.1.4 Notify the Unit Supervisor the H 2 Analysis Train is back in service.
1.1.5 Return completed enclosure to personnel operating Post Accident Sample Panel.
i I
, _ , . _ . , m..- -- , e-
Pag 2 1 of 1 Checked Control Copy ,
Date .
ENCLOSURE 5.7
~
HP/3/A/1009/17 OPERATIONS CHECKLIST FOR RETURNING UNIT 3 H 2 ANALYSIS PANEL BACK TO SERVICE IN ANALYZE MODE VERIFICATION DATE DATE INIT./ TIME INIT./Tiae 1.0 Initial Conditions 1.1 Hz Analysis Panel has been switched to Standby Mode for Post Accident sampling and is to be returned to Analyze Mode.
2.0 Procedure 2.1 Return the Hg Analysis train back to service as follows:
2.1.1 Depress the OFF buttons on both "BYP to Post AC" switches. Closes * - n~ -
(3PR-83, 3PR-86) or (3PR-89, 3PR-92).
2.1.2 Position the "Off, Standby, Analyze" Selector to Analyze.
NOTE: When Analyze is selected, the indication will go up scale resulting in a possible .
High Hydrogen Alarm on both panels and in the Control Room. Then return down scale -
to the correct reading in approximately 3 minutes.
2.1.3 Push the Remote Selector button to ensure control is from Remote Panel.
l l 2.1.4 Reset the Common Alarm after the I
meter reading stabilizes.
2.1.5 Notify the Unit Supervisor the H2 Analysis Train is back in service.
2.1.6 Return completed enclosure to Health Physics Personnel Operating Post Accident Sample Panel.
l I
_ , . _ . _ _ _ _ _ - _ _ _ _ . . _ _ _ . . _ ~ - _ _ . _ _
Pagh 1 of 1 ENCLOSURE 5.8 s EP/3/A/1009/17 ,
VALVECHECKLISTFORSAMPLEPAhEL NOTE: This checklist may be used to provide assistance in determining flow inside the sample panel. It is not intended to provide a verification for valve operation.
ACTION R__ESPONSE Dilution Volume Evacuation
- Activate Energize 1, 2, 9, ;, 19, 17 Sample Recirculate
- Activate Energize 1, 2, 5, 6, 27
- Sample De-energize 27
- Trap De-energize 2, 5
! Sample Dilution
- Activate . Energize 12, 17
- Slow Energize 3, 20
- Stop De-energize 3, 20 .;, _. .
- Recire Energize Recire Pump 16, 18 NOTE: Valve #17 will de-energize when selector switch is moved to another position.
System Purge Energize 9, 12, 19, 27
- Activate Energize 12, 22
- Evac Energize 1, 2 _.._~ .
- Stop De-energize 1, T
. - Gas Purge (down) Energize 15, De-energize.l., 2 _
- Stop De-energize 15
- Normal - Sample Purge (Sample Purge) Energize 17
- Pump Energize Pump 16, 18 i De-energize 15, or 1 and 2 l
i
- Stop De-energize Pump 16, 18 l Solution Change Out i
- Empty Energize 10, 11, 13 l - Flush Energize 14, 10
- Purge Energize 15, 10
- Refill Energize 11, 13
- TS Sample Energize 21 l - TS Sample Grab De-energize 21 l
I
- , r i go a lsR- W 5glfg 2 r * -
- a P 1
r e
cd I n pi sml aay GSC a
L .@ j, r g ,"
j
{g s r e
nr -
oe id t
t T
t n i
ui m s
iy1 ll DC n
a r
c r
T _
cm e
r 3D_ip eu RP u
s*
s
[P e r [
g r s 94 e
t at f r ,
l o p p. '
uP s 2 m ol H u il P hi ,, r r p e
TF e m t ed -
u a l n
&r, H W pi ml C#S I S ay
_ D TSC e ,5g
)
V m 5 4 .
9r Y-,
u e
q p I d
m u Y f.
k S n Ta h T
ee 2 l m H pu ml ao 4 SV
,1_j%.f ,[)3 _
[
_ ' ,4 T _
t Me l t
_ e l pe l
t rml _
u i an O ASI _
, , i 1
t i Hedium ion Large Sample Recirc Trap Area ggog p SagpieD Small \ l/ Evacuation O @@
Sample Trap O ,
@@@@ Inert Cas Recirc t
Dilution ume Select Dilution Volume Evacuation
[ System Purge i
/
Small- Large ,
, , 1]o- ,
Selector Evac Purge Pump Stop g ' -
gggg Sample Volume Select Normal p"$e" h o
Off f
' sa Unit 1 Unit 2 Solution Change Out f
,8 % ,B Dff @
@ a Purge
@ Activate 0O Empty 0O a w Sample lect Flush 1 11 Fuse 1 Fuse 2 TS TS P
Sample l0 0 C"rab -
\
1 . F5 -
300
- V' 'O M- 250 Sump Pump Puwer On l i l A. -5 P Off )
u--10 8 k / U h- '150 e D TC Radiation M~ 15 u o D
H8' -20 a 100 8 8 b. v
, Monitor n .m
-25 h
i : - 50 v
________._._.._____