3b Madison Avenue "a
John P, Stet Toledo OH 43652-0001
^ Vlos Pmsident Nuclear 419-249-2300 Dovk-Besse Docket Number 50-346 License Number NPF-3 Serial Number 1-1054-December 12, 1994 United States Nuclear Regulatory Commission
. Document Control Desk Washington, D. C.
20555 Subj ect : Response to Inspection Report 50-346/94011 (DRP)
Gentlemen:
Toledo Edison has received Inspection Report 94011 (Log Number 1-3104) and the enclosed Notice of Violati.on; the response to which is provided below.
Violation:
10 CFR Part 50, Appendix B, Criterion V, " Instructions, Procedures, and Drawings," states, in part, that
" Activities affecting quality shall be prescribed by documented instructions, procedures,'or drawings.... and shall be accomplished in necordance with these instructions, procedures, or drawings."
Administrative procedure DB-MN-00005, Foreign Material Exclusion (FME), defines an exclusion zone 3 as an area requiring access control over personnel and materials.
Controls to do this include ropes / tape barriers, and signs around the work area.
Material accountability (log), and personnel accountability (log) are required. The licensee specified the reactor cavity / refuel canal area as an exclusion zone 3 area.
l
\\4CD \\
Operating Componies:
Cleveland Electric muminating y
l I # U'S'"
~
9412190172 941212 PDR ADOCK 05000346 U
i O
PDR.__
=
1
h'
[
U J
's<
p w
k j J S [poest' Number /50-346I
' 0'h s
. n y.7 l License Number NPF-3i
'M f, f,
-i
-: Serial Number;1-1054!
~
y T, N,. 6 - Page. - 2',r
,e w
f',
j
, ~'
t Contrary:.t'o;the above,.on October l11',01994,' FME controllfor, L
as
_w
'the' reactor. cavity / refuel canal' area vas'not-adequately:
implemented.y The" established; exclusion area ~ boundary was; J
'^"
f' not properly. adhered.to in that: unaccounted materials;were
" Q' '
,.noted laying part way into.the; exclusion l area.o In:
1
' addition,'the material accountability log:vas'notc
- adequatelyLmaintained in that several' items had.not;been<
?>
W Lproperly'. logged"in/out of the' exclusion' area.,
~,,
- (346/94011-01(DRP))
.ThislisaSeverity'LevelIV: Violation (Supplement /I).
C 4
a,
,. Responses.
Acceptance or Denial of the Alleged Violation
't 4
Toledo? Edison accepts-the alleged violation'.=
P' Reason for the Violation ce r
In addition to this violation, other instances-of-I inadequate.FME control forithe spent fuel poolLand refueling canal have~been'recently identified.
Inspection Report 94006 dated August 2,.1994,:identifie'd
~
inadequate.FME control for.the spent fuel pool, area as part:
of a violation regarding'several proceduralLadherenceL issues. A portion'of the FME access barrier had been.
removed and the material accountability log was not' l
accurately maintained. Toledo Edison l responded.to this. '
i violation by letter dated September'1, 1994 (Serial Number, 1-1050)._
~ '
On November 9, 1994, Potenti'al Condition Adverse to Quality Report (PCA0R).94-1176 was initiated,to document two
' discrepancies' identified during the review:of.,the Ninth Refueling Outage refueling canal material accountability-Li log. The log was not accurately' maintained.in'that two items logged into the FME area 1 vere not logged out; The j
material accountability log was subsequently reconciled for thase specific items as part of the initial assessment of.
PC40R 94-1176.
o The apparent cause of this violation and the additional.
instances of inadequate FME control discussed above is j!
insufficient overall ownership'andLindividual accountability for:FME' control in the spent fuel pool and refueling canal areas. The importance of FME control, overall responsibility for its implementation, and program i
expectations were not adequately emphasized by management
.l and accepted by responsible organizations and individuals.
2 4.
i
d+
cl 5 % QMd M m'J
vf" m.
1
,y M [d,,(
i'
'[
{
L,.
+
g; 7
u w r,
s.
~= <
o j r 4 T o M t Number'50-346 i e
f D
.r
,' N l1.icensel Number NFF-3.
q j
F q:-[ 6 5erial Number 1-1054 7
Fage" 3 J '
'+.T
. n,.
s kI,
"A contributingifactorLtofindividu d accept'ance.of the O l
Y
. program'isfthe administrativeiburden associated with:its.
' implementation.1 Further, procedural guidance may not have-
'been;sufficiently, detailed to. ensure that.FME' control'was:
J,
' adequately maintained.
~
,e s
y, m
- Corrective Actions'TakenJand'Results-Achieved
~0n 0ctobe'r ll', 1994,-folloving identification'of'the s
' refueling' canal FME controluissuef appropriate actions were-f completed.to re-establish' adequate FME^ control in"the area.-
The FME boundary was:moreTclearly~ defined,'.the material-
^
4 aecountability log was reconciled..'and'an individual was?
assigned. full-time;1og keeping.and' access control'
. responsibilities,for the refueling canal FME area.
In addition, management clearly defined theforganizations; fi with overall responsibility for FME control; ;0verall:
responsibility.for-FME control'was assigned:to Radiation ~,
Protection inside containment and to,0perations outsiden containment.
Corrective Actions to Prevent Recurrence?
Frocedure DB-MN-00005 vill be revised as'follovss; 1
- Overall responsibility.for FME control will;be ass'igned to Radiation' Protection-inside containment,and to.
Operations outside containment.
- An individual vill be required full. time to maintain;the b
material. accountability log and access. control to the o
+
refueling canal FME area'.'
In addition, DB-MN-00005 and DB-OP-06904, Shutdown..
Operations, vill be revised to require a-review of the j
refueling canal material accountability log' prior to key-events in:the refueling process such as reactor. head
' n ;
installation and fill / drain of the refueling canal.
The procedure changes' described above vill be completed by-9 March 31, 1995. Additional program enhancements >may be made if'varranted to' simplify implementation of the FME.-
,i program,.thereby improving its acceptance.'
l r'
)
1
=
w
.-m.....
~;-
, ;_7 o.-
3.?
, %lj J
- Dock $tNumber'50-346 l License Number NPF-3 s
" Serial Number'.1-1054~
a --
1.Pagepc Date'When~ Full Compliance' Vill Be Achieved' Full, compliance was' achieved on.0ctober.11,.1994,'following the actions completed to more clearly' define the FMg boundary and to reconcile.the materia 1' accountability log.1 N
.Should you have'any questions'or require additional'information,.please contact Mr. Villiam T. O'Connor, Manager - Regulatory-Affairs,' at (419) 249-2366.
.Very truly yours, n
AVA/ eld cc. L. L. Gundrum, NRC Project Manager
- J. B. Martin, Regional Administrator, NRC Region III S. Stasek, DB-1 NRC Senior. Resident Inspector.
Utility Radiological Safety Board t
l
_ _ -.