Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20083D765 + (11:02:49, 14 December 2024)
- ML20083D762 + (11:02:50, 14 December 2024)
- ML20083D758 + (11:02:50, 14 December 2024)
- AECM-83-0784, RO 83-108/0:on 831111 & 17,fluctuating Temps in Upper Control Room Exceeded Tech Spec Limit of 77 F for More than 8 H.Max Recorded Temp Was 79 F.Equipment Operability Unaffected + (11:02:51, 14 December 2024)
- ML20083D754 + (11:02:51, 14 December 2024)
- AECM-83-0798, RO 83-111/0:on 830328,fire Penetration CE-519D Opened to Implement Design Change Package.Penetration Reopened to Install Conduits Per Package.Fire Watch Established & Will Continue Until Penetration Sealed + (11:02:52, 14 December 2024)
- ML20083D747 + (11:02:52, 14 December 2024)
- ML20083D745 + (11:02:53, 14 December 2024)
- ML20083D736 + (11:02:54, 14 December 2024)
- ML20083D733 + (11:02:55, 14 December 2024)
- ML20083D730 + (11:02:56, 14 December 2024)
- ML20083D729 + (11:02:57, 14 December 2024)
- RBG-16-573, Interim Deficiency Rept DR-129 Re Agastat Relays w/CR0095 Bases.Investigation Incomplete.Next Rept by 840228 + (11:02:57, 14 December 2024)
- ML20083D726 + (11:02:58, 14 December 2024)
- 3F1283-13, Notifies of Revised Schedule to Install New Emergency Data Aquisition Sys Per Response to Suppl 1 to NUREG-0737,Item III.A.2.2.Sys Installation Will Be Completed on 840601. Testing & Training Will Be Completed 840702 + (11:02:59, 14 December 2024)
- ML20083D723 + (11:02:59, 14 December 2024)
- ML20083D714 + (11:03:01, 14 December 2024)
- ML20083D713 + (11:03:02, 14 December 2024)
- ML20083D712 + (11:03:02, 14 December 2024)
- ML20083D706 + (11:03:03, 14 December 2024)
- U-601883, Requests Withdrawal of 910906 Request for Regional Waiver of Compliance to Provide Addl Time to Effect Repairs in Response to Microbiologically Induced Corrosion in Jacket Water Heat Exchanger for 12-cylinder Engine of Standby EDG + (11:03:03, 14 December 2024)
- 05000277/LER-1991-030, :on 910827,two Diesel Generators Discovered Inoperable Concurrently as Result of Generator Rectifier Ground.Cause Unknown.Appropriate Operating Procedures Reviewed & Revised + (11:03:05, 14 December 2024)
- ML20083D703 + (11:03:06, 14 December 2024)
- ML20083D698 + (11:03:07, 14 December 2024)
- ML20083D699 + (11:03:07, 14 December 2024)
- ML20083D696 + (11:03:08, 14 December 2024)
- BECO-83-299, Forwards Detailed Description of ALARA Program to Be Emplaced Should Recirculation Sys Piping Replacement or Repair Be Necessary.Alara Program Controls Include Formation of Dedicated Group W/Job Shutdown Authority + (11:03:09, 14 December 2024)
- PY-CEI-NRR-1381, Application for Amend to License NPF-48,changing Tech Spec 3.1.3.3, Control Rod Scram Accumulators to Allow Alternate Method for Determining Whether CRD Pump Operating + (11:03:09, 14 December 2024)
- 05000278/LER-1991-013-03, :on 910825,high Pressure Coolant Injection Sys Discovered Inoperable.Caused by Room Cooler Fan Trip on Thermal Overloads.Operator Immediately Reset Thermal Overloads + (11:03:11, 14 December 2024)
- ML20083D692 + (11:03:12, 14 December 2024)
- ML20083D689 + (11:03:13, 14 December 2024)
- ML20083D688 + (11:03:14, 14 December 2024)
- 05000395/LER-1983-130-03, /03L-0:on 831124,containment Bldg Internal Pressure Was Negative 1.2 Psig.Caused by Personnel Error & Inadequate Procedure.Exhaust Fan Secured & Supply Fan Started.Operating Procedure Revised + (11:03:15, 14 December 2024)
- ML20083D685 + (11:03:16, 14 December 2024)
- ML20083D684 + (11:03:17, 14 December 2024)
- ML20083D683 + (11:03:18, 14 December 2024)
- 05000389/LER-1983-073-03, /03L-0:on 831114,while in Mode 1,outer Door on Escape Airlock Opened.Caused by Personnel Misunderstanding. Personnel Involved Counseled as to Importance of Adhering to Tech Spec Requirements + (11:03:19, 14 December 2024)
- ML20083D681 + (11:03:20, 14 December 2024)
- ML20083D680 + (11:03:21, 14 December 2024)
- 05000339/LER-1991-008-03, :on 910905,discovered That Five Fuses,Which Provide Secondary Protection for Pressurizer Heater Electrical Penetrations,Failed to Meet Acceptance Criteria on 910829.Fuses Replaced & Records Reviewed + (11:03:23, 14 December 2024)
- A830026, Withdraws 830930 Request to Establish Six Crew Rotating Shift Providing Addl Crew Time for Training.Five Shift Basis Will Continue,Per 10CFR50.54(m)(2)(i),due to Operator Attrition & Poor Performances on Licensing Exams + (11:03:24, 14 December 2024)
- ML20083D678 + (11:03:24, 14 December 2024)
- ML20083D676 + (11:03:25, 14 December 2024)
- 05000321/LER-1983-104-03, /03L-0:on 831118,while Performing Hydraulic Shock & Sway Arrestor Insp & Functional Test,Snubber 1B31-SS-A7 Discovered W/Low Reservoir Fluid Level.Caused by Inadequate Fluid Reserve Due to Leakage.Snubber Rebuilt + (11:03:26, 14 December 2024)
- ML20083D669 + (11:03:27, 14 December 2024)
- ML20083D668 + (11:03:28, 14 December 2024)
- ML20083D667 + (11:03:28, 14 December 2024)
- 05000395/LER-1983-131-03, /03L-0:on 831124,pressurizer Pressure Trip Bistable PB-455D Began Alternately Tripping & Resetting. Caused by Electronic Component Failure.Defective Circuit Board Replaced & Channel Returned to Svc + (11:03:30, 14 December 2024)
- ML20083D663 + (11:03:31, 14 December 2024)
- ML20083D662 + (11:03:31, 14 December 2024)
- ML20083D660 + (11:03:32, 14 December 2024)
- ML20083D657 + (11:03:33, 14 December 2024)