ML20083D684

From kanterella
Jump to navigation Jump to search
Amends 125 & 107 to Licenses NPF-9 & NPF-17,respectively, Revising Tech Spec 6.8.2 to Allow Designated Individual to Review & Approve Applied Science Ctr Procedures
ML20083D684
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 09/17/1991
From: Matthews D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20083D687 List:
References
NUDOCS 9110010146
Download: ML20083D684 (6)


Text

..

t paMc g

i*

UNITED STATES

^ W,-

i NUCLEAR REGULATORY COMMISSION k\\

/

WASHINGTON. o C. 20555 p

4....

DUKE POWEP COMPANY DOCKET NO. 50-369 McGUIRE NUCLEAR STATION, UNIT 1 AMENDMENT TO FACILITY OPERATIPG LICENSE Amendment No.125 License No. NPF-9 1.

The Nuclear Regulatory Commission (the Commission) has found that:

The app (lication for amendment to the McGuire Nuclear Station, A.

Unit 1 the facility) Fecility Operating License No. NPF-9 filed by the Duke Power Company (the licensee) dated January 30, 1991, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended ( the Act), and the Commission's rules and regulations as set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonabl(. assurance (i) that the activities authorized by this amendment can be c?nducted witnout endangering the health and safety of the public, and (ii) that such activities will be conducted in e mpliance with the Commission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this ar.endment will not be inimical to the common defenst and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regt.lations and all applicable requirements have been satisfied.

I 9110010146 910917 PDR ADOCK 0 5000369 PDR

__ 2.

Accordingly, the license is hereby amended by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-9 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.125, are hereby incorporated into the license.

The licensee shall operate the facility in accordance with the Technici.1 Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION in I

.Nf /lj%L'~

c41 avid B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects-1/II Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes Date of 1ssuance: September 17, 1991 l

l l

l

-. --.. ~. -. -

,. - ~ _ -......- -

- g **cg?, -

)

2 5 y 4,d/ j UNITED STATES 4

- :ce: "dv i NUCLEAR REGULATORY COMMISSION

- 3,

['

WASHINoTON, D.C. 20665 '

%...f DUKE POWER COMPANY DOCKET NO. 50-370 McGUIRE NUCLEAR STATION, UNIT 2 AMENDMENT TO FACILITY-0PERATING LICENSE Amendment No. 107 j

l License No. NPF-17 1

1 1.-

The Nuclear Regulatory Commission (the Commission) has found that:

l A.

The app (lication for amendment to the McGuire Nuclear Station,-the facility) F Unit 2 by the Duke Power Company (the licensee) dated January 30,'1991, complies with the-standards and requirements of the Atomic Energy' Act of 1954, as amended (the Act),L and the Commission's rules and regulations as set forth in 10 CFR Chapter I; f

B.

The facility will operate in conformity with the application, l'

the provisions-of the Act, and the rules and regulations of

[

the Commission; C.

There is reascnable assurance (i)-that the -activities authorized by this amendment can-be conducted without endangering the health and' i

safety of the public, and (ii) that such activities will be conducted iinLcompliance with'the Commission's regulations set forth in 10-CFR 3

Chapter I; i'

D.-

The--issuance of this amendment will-not be inimical-to the common-defense.and. security or to the health and safety of the public; and E.

-The issuance of this amendment is in accordance 'sith 10 CFR Part 51 of 4

-the Commission's regulations and all applicable requirements have been-i.

satisfied.=

p

p

, 2.

Accordingly, the license is hereby amer.ded by page changes to the Technical Specifications as indicated in the attachment to this license amendment, and Paragraph 2.C.(2) of Facility Operating License No. NPF-17 is hereby amended to read as follows:

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 107, are hereby incorporated into the license.

The licensee shall operate the f acility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY COMMISSION

)</0bOk

/

vid B. Matthews, Director Project Directorate 11-3 Division of Reactor Projects-1/II Office of Nuclear Reactor Regulation

Attachment:

Technical Specification Changes Date of Issuance: September 17, 1991 i

l l

l l

l l

l l

l l

ATTACHMENT TO LICENSE AMENDMENT N0.175 FACILITY OPERATING LICENSE NO. NPF-9 DOCKET NO. 50-36_9_

AND TO LICENSE AMENDMENT NO. 107 FACILITY OPERATING LICENSE NO. NPF-17 DOCKET NO. 50-370 Replace the following page of the Appendix Jchnical Specifications with the enclosed page. The revised page is ider..

ied by Amendment number and contains vertical lines indicating the areas of change.

Remove Page Insert Page 6-14 6-14 I

-_________m_-_.___-.-_

l ADMINISTRATIVE CONTROLS SAFET) LIMIT VIOLATION (Continued) t.

The Safety Limit Violation Report shall be submitted to the Commission, the NSRB and the Vice President, Nuclear Production, within 14 days of the violation; and d.

Critical operation of the unit shall not be resumed until authorized by the Commission.

6.8 PROCEDURES AND PROGRAMS 6.8.1 Written procedures shall be established, implemented, and maintained covering the activiti i referenced below:

a.

The applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978; b.

The applicable procedures required to implement the requirements of NUREG-0737; c.

Security Plan implementation;*

d.

Emergency Plan implementation; e.

PROCESS CONTROL PROGRAM implementation; f.

OcFSITE DOSE CALCULATION MANUAL implementation; and g.

Quality Assurance Program for effluent and environmental monitoring.

h.

Fire Protection Program implementation.

i.

Commitments contained in FSAR Chapter 16.0 6.8.2 Each procedure of Specification 6.8.1 above, and changes thereto, shall be reviewed and approved by the Station Manager; or by:

(1) the Operating Superintendent, (2) the Technical Services Superintendent, (3) the Maintenance Superintendent, or (4) the Superintendent of Integrated Scheduling as previously designated by the Station Manager; prior to implementation and shall be reviewed periodically as set forth in administrative procedures.

For Applied Science Center procedures which implement offsite environmental, technical, ar.d labora-tory activities, the above review and approval may be performed by the Manager, Production Environmental Services or designated Technical System Manager in the Production Support Department, in lieu of the individuals specified above.

6.8.3 Temporary changes to procedures of 3pecification 6.8.1 above may be made provided:

a.

The intent of the original procedure is not altered; b.

The change is approved by two members of the plant management staff, at least one of whom holds a Senior Operator license on the unit affected; and

  • Review and approval may be performed by the Superintendent of Station Services.

McGUIRE - UNITS 1 and 2 6-14 Amendment No.125 (Unit 1)

Amendment No.107 (Unit 2)