Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LD-95-041, Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design + (16:33:41, 13 December 2024)
- NRC-95-4547, Forwards Listed Matl Re AP600 Containment Vessel as Requested During Meeting W/Nrc & NRC Consultants at CBI Ofcs on 950830 & 31 + (16:33:41, 13 December 2024)
- NG-95-2644, Provides Further Info Re DAEC Thermo-Lag Installations + (16:33:42, 13 December 2024)
- ML20092B586 + (16:33:43, 13 December 2024)
- BECO-LTR-95-091, Forwards Third-Yr Interval ISI Plan for Pilgrim Nuclear Power Station + (16:33:44, 13 December 2024)
- ML20092B572 + (16:33:45, 13 December 2024)
- ML20092B563 + (16:33:45, 13 December 2024)
- ML20092B555 + (16:33:46, 13 December 2024)
- ML20092B544 + (16:33:48, 13 December 2024)
- ML20092B533 + (16:33:48, 13 December 2024)
- ML20092B532 + (16:33:49, 13 December 2024)
- ML20092B531 + (16:33:50, 13 December 2024)
- ML20092B527 + (16:33:54, 13 December 2024)
- 05000461/LER-1995-006, :on 950801,lack of Appropriate Post Maint Testing Due to Personnel Errors Resulted in Inoperable Reactor Recirculation Flow Control Valve.Replaced Components Removed During Maint Work + (16:33:56, 13 December 2024)
- ML20092B510 + (16:33:57, 13 December 2024)
- AECM-84-0331, Monthly Operating Rept for May 1984 + (16:33:58, 13 December 2024)
- ML20092B501 + (16:33:59, 13 December 2024)
- 05000397/LER-1984-044, :on 840513,during Power Ascension Test,Pressure Fluxuation in Digital electro-hydraulic Sys Emergency Trip Header Caused Reactor Trip Due to High Pressure.Caused by Improper Bypass Reset Solenoid Valve Seating + (16:34:01, 13 December 2024)
- B15366, Forwards ISI 1995 Outage Summary Rept of Millstone 3 Nuclear Power Station for Northeast Nuclear Energy Co for Interval 1,Period 3 + (16:34:02, 13 December 2024)
- ML20092B492 + (16:34:03, 13 December 2024)
- B15344, Advises NRC That on 950804,util Completed Design Basis Reviews,Analyses,Verifications,Tests & Insps in Accordance W/Gl 89-10.Closeout Rept for Millstone Unit 2 GL 89-10 Will Be Submitted by 951204 + (16:34:04, 13 December 2024)
- ML20092B488 + (16:34:04, 13 December 2024)
- AECM-84-0336, Proposed Tech Specs,Reflecting 840318 Tech Spec Review Program Findings,Including Editorial Changes,Tech Spec/ as-built Plant Consistency & Enhancements Consistent W/ Safety Analyses + (16:34:05, 13 December 2024)
- ML20092B464 + (16:34:06, 13 December 2024)
- ML20092B466 + (16:34:06, 13 December 2024)
- ML20092B463 + (16:34:07, 13 December 2024)
- ST-HL-AE-5166, Withdraws Proposed Amend to License NPF-76 Re Revising TS 3.4.5 to Allow Implementation of Alternate SG Tube Plugging Criteria for tube-to-tubesheet Joints & 3.4.6.2 to Allow Alternate SG Tube Plugging for Tube Support Plate + (16:34:08, 13 December 2024)
- U-602490, Forwards Discussion of Organizational Changes at Plant + (16:34:08, 13 December 2024)
- ML20092B439 + (16:34:09, 13 December 2024)
- ML20092B435 + (16:34:10, 13 December 2024)
- ML20092B429 + (16:34:10, 13 December 2024)
- ML20092B419 + (16:34:11, 13 December 2024)
- ST-HL-AE-5168, Advises That Applications for Operator Licenses for GP Ly & CA Brewer Retracted + (16:34:12, 13 December 2024)
- 05000373/LER-1984-027, :on 840520,offgas Hydrogen Sample Not Performed Until 5.5 H After Power Drop.Caused by Rad/Chem Not Notified to Begin 4 H Sampling.Shift Supervisor Will Rept to Shift Engineer Re Plant Evolution + (16:34:13, 13 December 2024)
- ML20092B396 + (16:34:14, 13 December 2024)
- ML20092B393 + (16:34:15, 13 December 2024)
- ML20092B350 + (16:34:16, 13 December 2024)
- ML20092B359 + (16:34:16, 13 December 2024)
- ML20092B344 + (16:34:17, 13 December 2024)
- ML20092B342 + (16:34:18, 13 December 2024)
- ML20092B325 + (16:34:18, 13 December 2024)
- ML20092B314 + (16:34:19, 13 December 2024)
- ML20092B309 + (16:34:20, 13 December 2024)
- AECM-84-0330, Application for Amend to License NPF-13,proposing Tech Spec Changes for as-built Plant Consistency Re Min Water Level Required Above Reactor Pressure Vessel Flange During Operational Conditions 4 & 5 + (16:34:21, 13 December 2024)
- ML20092B299 + (16:34:22, 13 December 2024)
- 1CAN068401, Application for Amend to License DPR-51,changing Tech Specs Re safety-related Snubber Surveillance + (16:34:22, 13 December 2024)
- ML20092B278 + (16:34:24, 13 December 2024)
- ML20092B268 + (16:34:25, 13 December 2024)
- ML20092B265 + (16:34:25, 13 December 2024)
- ML20092B247 + (16:34:27, 13 December 2024)
- ML20092B252 + (16:34:27, 13 December 2024)
- ML20092B240 + (16:34:28, 13 December 2024)