MONTHYEARML20202H8821997-12-0303 December 1997 Final Response to FOIA Request for Documents.Records in App a Being Made Available in PDR & Encl IA-97-428, Final Response to FOIA Request for Documents.Records in App a Being Made Available in PDR & Encl1997-12-0303 December 1997 Final Response to FOIA Request for Documents.Records in App a Being Made Available in PDR & Encl ML20202H8981997-10-27027 October 1997 FOIA Request for Listed Pages from Section 19 of General Electric ABWR Ssar ML20210J3591997-08-11011 August 1997 Transmits Revised Fda for Us ABWR Std Design,Per App 0 of 10CFR52.FDA Allows ABWR Std Design to Be Ref in Application for Const Permit or Operating License,Per 10CFR50 or in Application for Combined License,Per 10CFR52 ML20149J7101997-07-23023 July 1997 Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization ML20148A5701997-05-0202 May 1997 Forwards Affirmation Ltr Complying W/Filing Requirements of 10CFR52.45(d) & 50.30(b) Re Application for Review of ABWR Design Control Document,Rev 4 for Design Certification ML20196F8771997-03-28028 March 1997 Forwards Licensee ABWR Design Control Document,Rev 4 to Incorporate Changes Needed to Reflect Commission SRM Decisions & Subsequent Discussion W/Staff & to Support Ssar ML20137G3161997-03-28028 March 1997 Forwards Rev 4 to Ge'S ABWR Design Control Document to Incorporate Changes That Are Needed to Reflect Commission SRM Decisions & Subsequent Discussions W/Staff ML20147C1041997-01-23023 January 1997 Responds to Requesting Opportunity to Review Design Certification Rule for ABWR Before Sent to Ofc of Fr for Publication.Request Denied ML20133A9791996-12-18018 December 1996 Approves Rules Certifying Asea Brown Boveri-Combustion Engineering Sys 80+ & General Electric Nuclear Energy Advanced Boiling Water Reactor ML20133A9811996-12-18018 December 1996 Informs That NRC Has Approved Rules Certifying Two Evolutionary Reactor Designs:Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energy ABWR ML20133A9871996-12-18018 December 1996 Informs of NRC Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-CE Sys 80+ & GE Nuclear Energy ABWR ML20133A9901996-12-18018 December 1996 Informs That NRC Has Approved Asea Brown Boveri CE Sys 80+ & GE Nuclear Energy ABWR as Evolutionary Reactor Designs ML20133B0191996-12-18018 December 1996 Informs of Approval of Rules Certifying Two Evolutionary Reactor Designs,Asea Brown Boveri-Combustion Engineering Sys 80+ & GE Nuclear Energys Advanced BWR ML20128P4981996-09-23023 September 1996 Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing ML20128N6001996-09-16016 September 1996 Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking ML20117H3311996-08-30030 August 1996 Forwards GE ABWR Dcd,Rev 3 (Filed in Category A),Abwr Cdm, Rev 8 (Filed in Category a) & ABWR Ssar,Amend 37,Rev 9 (Filed in Category K) to Incorporate Changes Ref in 960701 & s from Jf Quirk ML20115C0861996-07-0101 July 1996 Forwards GE Providing Background for Need for Proposed Changes to ABWR Design Control Document (Dcd), Markups Incorporating Comments Resulting from Interactions W/Nrc & DCD Markups for Addl Proposed Change ML20115G2201996-06-10010 June 1996 Provides Comments from Two NRR Organizations on Cdm & Ssar Change Pages.Markups of DCD & Ssar Encl ML20108D4481996-04-26026 April 1996 Responds to Staff Ltr Re ABWR DCD Change Package Which Recommends That GE Submit All Changes Identified by Foake Program.Ltr Contrary to Previous Understandings ML20107H3241996-04-16016 April 1996 Forwards marked-up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR Engineering Program ML20108D3111996-04-0303 April 1996 Forwards Marked Up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR First-Of-A-Kind Engineering Program ML20101G9021996-03-22022 March 1996 Forwards Amend 36 to Rev 8 to 23A6100, ABWR Ssar & Rev 7 to 25A5447, Certified Design Matl ML20101P1231996-03-15015 March 1996 Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations ML20092G0171995-09-15015 September 1995 Forwards Missing Pp 103-117 from Attachment B of from SR Specker on Behalf of GE Nuclear Energy Re Response to Proposed RM for Std Design Certification of Us Advanced BWR Design LD-95-041, Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design1995-09-0505 September 1995 Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design ML20092B6431995-09-0101 September 1995 Forwards Analysis of Ocre 950812 Supplemental Comments on Design of Abwr,Notice of Final Rule & Statement of Considerations,In Order to Ensure That NRC Has Complete Technical Info on Subj ML20086G7981995-07-12012 July 1995 Informs of Changes to Svc List,Per Request of Jn Fox ML20084Q0621995-05-31031 May 1995 Forwards Revised Effective Page Listing for ABWR Design Control Document ML20078F4271995-01-26026 January 1995 Provides Info for Closure of ABWR FSER Confirmatory Item F1.2.2-2 Previously Addressed in 941222 Closure Ltr ML20077R9141995-01-17017 January 1995 Forwards Rev 2 to ABWR Design Control Document. Rev of Design Control Document Accompanied by List of Currently Effective Pages.List Provided as Attachment 2 ML20081K9361994-12-22022 December 1994 Documents Closure of ABWR FSER Confirmatory Items ML20080D3341994-12-22022 December 1994 Forwards Rev 1 to Advanced BWR Design Control Document ML20077A7471994-11-23023 November 1994 Forwards Revised Fda for Us ABWR Std Design,Per App O of 10CFR52 & Notice of Issuance of Fda ML20081K9031994-11-18018 November 1994 Forwards Rev 0 to Technical Support Document (Tsd) for ABWR & Updated ABWR Ssar App 19P Markup.Updated Version of App 19P Incorporated as Attachment a to Tsd,As Agreed During 941006 Meeting W/Nrc ML20073M7221994-11-0404 November 1994 Forwards Proposed Rev to Section 3.8 of DCD Introduction for ABWR Re GE Meeting on 941102 ML20078E6391994-11-0101 November 1994 Forwards Description of Proposed Process for Controlling Changes to Severe Accident Evaluations & Explains Bases for Proposed Process ML20149G9751994-10-31031 October 1994 Requests That Encl Ltrs Be Distributed to Controlled Copy of Licensee QA Program ML20149G7081994-10-28028 October 1994 Forwards Rev 0 to ABWR Design Control Document (Dcd). DCD Comprised of Introduction,Certified Design Matl & Approved Safety Analysis Matl.Responses to NRC Comments Requested by Also Encl ML20081K8881994-10-13013 October 1994 Maintains That Proposition That GE Be Designated in Notice of Proposed Rulemaking as Source from Which Public Could Request Copies of Design Control Document (DCD) Inappropriate.Public Should Obtain Access to DCD from NRC ML20076F8451994-10-0505 October 1994 Responds to Re Root Cause & Corrective Measures on Unidentified Changes That Occurred in Design Control Document ML20081K8721994-09-20020 September 1994 Requests That ABWR Final Design Approval (Fda) Be Amended to Provide for Term of 15 Years from Date of Issuance & That,As Provided in SRM on COM-SECY-95-025,FDA Be Updated as Needed to Conform to Any Changes Resulting from Certification RM ML20149F7681994-09-0707 September 1994 Forwards Rev 0 to Advanced BWR Design Control Document ML20072T2691994-08-30030 August 1994 Advises That Industry Intends to Comment in Opposition to Applicable Regulations Approach & Proposed Text of Applicable Regulations in Design Certification Rulemaking Proceeding for Both ABWR & Sys 80+ ML20072Q2811994-08-30030 August 1994 Submits mark-up of Previous Version of Design Control Document Introduction Together W/Typed Rev ML20072C9821994-08-12012 August 1994 Responds to Re NRC Fee Regulations for Design Certification & Request Confirmation of Understanding of 10CFR170 ML20072E3381994-08-0909 August 1994 Requests Addition of Author Name to Svc List for Advanced BWR ML20072A8451994-08-0303 August 1994 Forwards Chapter 21 17x22 Inch Drawings to Replace Temporary 11x17 Drawings Provided in ML20071Q9091994-08-0202 August 1994 Forwards Ten Copies of Draft ABWR Design Control Document ML20070H9651994-07-20020 July 1994 Forwards Rev 7 to 23A6100, ABWR Ssar, Amend 35 & Rev 6 to 25A5447, ABWR Certified Design Matl 1997-08-11
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20202H8981997-10-27027 October 1997 FOIA Request for Listed Pages from Section 19 of General Electric ABWR Ssar ML20149J7101997-07-23023 July 1997 Requests That R Simard Be Removed from Service Lists & R Bell Be Added to Svc Lists,Due to Recent NEI Reorganization ML20148A5701997-05-0202 May 1997 Forwards Affirmation Ltr Complying W/Filing Requirements of 10CFR52.45(d) & 50.30(b) Re Application for Review of ABWR Design Control Document,Rev 4 for Design Certification ML20196F8771997-03-28028 March 1997 Forwards Licensee ABWR Design Control Document,Rev 4 to Incorporate Changes Needed to Reflect Commission SRM Decisions & Subsequent Discussion W/Staff & to Support Ssar ML20137G3161997-03-28028 March 1997 Forwards Rev 4 to Ge'S ABWR Design Control Document to Incorporate Changes That Are Needed to Reflect Commission SRM Decisions & Subsequent Discussions W/Staff ML20128P4981996-09-23023 September 1996 Forwards Proposed Rule Language for 3 Design Certifications Discussed at 960827 NRC Briefing ML20128N6001996-09-16016 September 1996 Provides Addl Info in Response to Several Questions Raised by Commission During 960827 Briefing on Design Certification Rulemaking ML20117H3311996-08-30030 August 1996 Forwards GE ABWR Dcd,Rev 3 (Filed in Category A),Abwr Cdm, Rev 8 (Filed in Category a) & ABWR Ssar,Amend 37,Rev 9 (Filed in Category K) to Incorporate Changes Ref in 960701 & s from Jf Quirk ML20115C0861996-07-0101 July 1996 Forwards GE Providing Background for Need for Proposed Changes to ABWR Design Control Document (Dcd), Markups Incorporating Comments Resulting from Interactions W/Nrc & DCD Markups for Addl Proposed Change ML20115G2201996-06-10010 June 1996 Provides Comments from Two NRR Organizations on Cdm & Ssar Change Pages.Markups of DCD & Ssar Encl ML20108D4481996-04-26026 April 1996 Responds to Staff Ltr Re ABWR DCD Change Package Which Recommends That GE Submit All Changes Identified by Foake Program.Ltr Contrary to Previous Understandings ML20107H3241996-04-16016 April 1996 Forwards marked-up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR Engineering Program ML20108D3111996-04-0303 April 1996 Forwards Marked Up Proposed Changes to ABWR Design Description Resulting from Info Developed in Course of ABWR First-Of-A-Kind Engineering Program ML20101G9021996-03-22022 March 1996 Forwards Amend 36 to Rev 8 to 23A6100, ABWR Ssar & Rev 7 to 25A5447, Certified Design Matl ML20101P1231996-03-15015 March 1996 Expresses Appreciation for Opportunity on 960308 to Brief Commission on Views on Design Certification Rules, Particularly W/Respect to Issue of Applicable Regulations ML20092G0171995-09-15015 September 1995 Forwards Missing Pp 103-117 from Attachment B of from SR Specker on Behalf of GE Nuclear Energy Re Response to Proposed RM for Std Design Certification of Us Advanced BWR Design LD-95-041, Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design1995-09-0505 September 1995 Forwards Response to Ocre 950812 Comment on Design Features of GE Abwr.Disagrees W/Any Suggestion That NRC Extend Favorable Consideration of Comment to Sys 80+ Std Plant Design ML20092B6431995-09-0101 September 1995 Forwards Analysis of Ocre 950812 Supplemental Comments on Design of Abwr,Notice of Final Rule & Statement of Considerations,In Order to Ensure That NRC Has Complete Technical Info on Subj ML20086G7981995-07-12012 July 1995 Informs of Changes to Svc List,Per Request of Jn Fox ML20084Q0621995-05-31031 May 1995 Forwards Revised Effective Page Listing for ABWR Design Control Document ML20078F4271995-01-26026 January 1995 Provides Info for Closure of ABWR FSER Confirmatory Item F1.2.2-2 Previously Addressed in 941222 Closure Ltr ML20077R9141995-01-17017 January 1995 Forwards Rev 2 to ABWR Design Control Document. Rev of Design Control Document Accompanied by List of Currently Effective Pages.List Provided as Attachment 2 ML20080D3341994-12-22022 December 1994 Forwards Rev 1 to Advanced BWR Design Control Document ML20081K9361994-12-22022 December 1994 Documents Closure of ABWR FSER Confirmatory Items ML20081K9031994-11-18018 November 1994 Forwards Rev 0 to Technical Support Document (Tsd) for ABWR & Updated ABWR Ssar App 19P Markup.Updated Version of App 19P Incorporated as Attachment a to Tsd,As Agreed During 941006 Meeting W/Nrc ML20073M7221994-11-0404 November 1994 Forwards Proposed Rev to Section 3.8 of DCD Introduction for ABWR Re GE Meeting on 941102 ML20078E6391994-11-0101 November 1994 Forwards Description of Proposed Process for Controlling Changes to Severe Accident Evaluations & Explains Bases for Proposed Process ML20149G9751994-10-31031 October 1994 Requests That Encl Ltrs Be Distributed to Controlled Copy of Licensee QA Program ML20149G7081994-10-28028 October 1994 Forwards Rev 0 to ABWR Design Control Document (Dcd). DCD Comprised of Introduction,Certified Design Matl & Approved Safety Analysis Matl.Responses to NRC Comments Requested by Also Encl ML20081K8881994-10-13013 October 1994 Maintains That Proposition That GE Be Designated in Notice of Proposed Rulemaking as Source from Which Public Could Request Copies of Design Control Document (DCD) Inappropriate.Public Should Obtain Access to DCD from NRC ML20076F8451994-10-0505 October 1994 Responds to Re Root Cause & Corrective Measures on Unidentified Changes That Occurred in Design Control Document ML20081K8721994-09-20020 September 1994 Requests That ABWR Final Design Approval (Fda) Be Amended to Provide for Term of 15 Years from Date of Issuance & That,As Provided in SRM on COM-SECY-95-025,FDA Be Updated as Needed to Conform to Any Changes Resulting from Certification RM ML20149F7681994-09-0707 September 1994 Forwards Rev 0 to Advanced BWR Design Control Document ML20072Q2811994-08-30030 August 1994 Submits mark-up of Previous Version of Design Control Document Introduction Together W/Typed Rev ML20072T2691994-08-30030 August 1994 Advises That Industry Intends to Comment in Opposition to Applicable Regulations Approach & Proposed Text of Applicable Regulations in Design Certification Rulemaking Proceeding for Both ABWR & Sys 80+ ML20072C9821994-08-12012 August 1994 Responds to Re NRC Fee Regulations for Design Certification & Request Confirmation of Understanding of 10CFR170 ML20072E3381994-08-0909 August 1994 Requests Addition of Author Name to Svc List for Advanced BWR ML20072A8451994-08-0303 August 1994 Forwards Chapter 21 17x22 Inch Drawings to Replace Temporary 11x17 Drawings Provided in ML20071Q9091994-08-0202 August 1994 Forwards Ten Copies of Draft ABWR Design Control Document ML20070H9651994-07-20020 July 1994 Forwards Rev 7 to 23A6100, ABWR Ssar, Amend 35 & Rev 6 to 25A5447, ABWR Certified Design Matl ML20070D9381994-07-12012 July 1994 Forwards D-RAP Design Description & ITAAC for Inclusion in Section 3.6 of Cdm & Cdm & Ssar Markups Addressing Minor Corrections ML20069Q3001994-06-23023 June 1994 Forwards Rev 6 for Ssar Amend 35 & Rev 5 for Certified Design Matl ML20070E1981994-06-0808 June 1994 Forwards Ssar Markup Indicating Applicable Edtion to UBC, AISI SG-673 & NEMA FB1 to ABWR Ssar.Changes Will Be Included in Amend 35 Mod Package.Notifies That Applicable Edition of Bechtel Rept BC-TOP-3-A Is Rev 3 ML20070E1891994-06-0808 June 1994 Forwards Ssar Markup of Section 1A.2.34 Which Responds to TMI Item III.D.1(1).Mod Makes Section Consistent W/Ts 5.5.2.2.Change Will Be Included in Amend 35 Mod Package Scheduled for Distribution Later This Month ML20070D9331994-05-26026 May 1994 Forwards Results of Analyses to Assess Impact of Drywell Spray Actuation Following LOCA to Ensure Bounding Scenario ML20069H2101994-05-25025 May 1994 Forwards 25A5447,Rev 4, ABWR Certified Design Matl & Nonproprietary & Proprietary Version of 23A6100,Rev 5, ABWR Ssar. Proprietary Version of Ssar Withheld ML20069G9301994-05-25025 May 1994 Submits non-proprietary Ssar Amend 35 & Certified Design Material Rev 4 to Listed NRR Recipients ML20069B1831994-05-25025 May 1994 Resubmits Affidavit for GE Abwr,Proprietary Info Section 18H, Supporting Analysis for Emergency Control Operation Info ML20069A7371994-05-20020 May 1994 Forwards Proprietary Ssar Sections 11A.2 & 11A.4 to Specified NRR Recipients Listed on Attachment 1.Encl Withheld ML20029D4211994-04-29029 April 1994 Forwards Revised Ssar Markups Responding to Commitments Made at 940415 Meeting in Rockville,Md,Including Addl Info Reflecting Locking Mechanisms of Subassemblies & European Experience & Finalized TS for CRD Removal - Refueling 1997-07-23
[Table view] |
Text
-_.
a Et A E
, y gy DOCKETED US Nf.C September 5,1995 LD-95-041 '95 SP 11 All :26
~
Ofril . '~N#
D0yr w i :Jr'
-,u Mr. John C. Hoyle, Secretary Office of the Secretary U.S. Nuclear Regulatory Commission Washington, D.C. 20555 C00KET NUMBER g -
PROPOSED 11ULE_
Attention: Docketing and Services tsranch .a 6 9,
Subject:
Notice of Proposed Rulemaking for gn Certification of the U.S. Advanced Boiling Water Reactor Design; 60 Fed. Reg.17902 (April 7,1995); Docket No.52-001
Dear Mr. Hoyle:
On August 12, 1995, Ohio Citizens for Responsible Energy, Inc. (OCRE) submitted several comments on certain design features of General Electric Company's Advanced Boiling Water Reactor (ABWR), requesting that the Commission incorporate OCRE's suggested changes. Insofar as one of OCRE's suggested changes might potentially impact Combustion Engineering, Inc.'s ;
(ABB-CE's) design features for ABB-CE's System 80+ Standard Plant Design, ABB-CE believes )
it is appropriate to respond to OCRE's specific recommendation, which was made on the ABWR docket.
For the reasons given in the attached response to OCRE's comment, ABB-CE strongly disagrees 1 with any suggestion that the NRC extend a favorable consideration of this comment to the System 80+ Standard Plant design.
i If you have any quesdons on this submittal or if you wish to discuss it, please contact me at (301) 881-7040, or ABB-CE counsel, Joe Egan, at (202) 663-9200.
I Respectfully submitted, COMBUSTION ENGINEERING, INC.
{ ud. .
Charles B. Brinkman, Director 9509120085 950905 Nuclear Licensing PDR PR 52 60FR17902 PDR l
E::-. ABB Combustion Engineering Nuclear Systems nm - f ., i n ,ts;am, ' , ,4 fv+ vi
+-m rd =y,,, l aso
o
~
I 6'
Attachment:
As Stated r oc: Dennis Cnitchfield Theodore Quay }
Jerry Wilson 1 i
Stewart Magruder Tom Crom (DE&S)
Sterling Franks (DOE) i Norman Fletcher (DOE)
Ronald Simard (NEI)
Joseph Quirk (GE) :
Steven Frantz (ML&B)
I l
i 1
i l
i i
l l
- - -- -- .- e ,-,--- .- 4, *- - , -_----.--. ,-rmy-
.. - . . =
a ,
l
. l Attachment to LD-95-041 l
l OCRE comment #4:
l ACRS members William Kerr and Charles J. Wylie made the following additional remarks in the ACRS letter of July 18,1989 on proposed staff actions regarding the fire risk scoping study (NUREG/CR-5088):
We recommend that the staff require the use of armored electrical cable in advanced light-water reactors. There are more than 20 years of U.S. electric utility experience which demonstrates its advantages in both nuclear and fossil electric generating plants. There is extensive experience with armored cable in naval and maritime vessels and in chemical plants. The British are requiring its use in the Sizewell B plant.
The armor makes its (sic) significantly more difficult for external heat sources to kindle and to propagate fires within the cables. It is practically impossible to kindle and propagate a fire from internal short circuits and overloads. Armor provides a high degree of mechanical protection for the cable. It also provides shielding against external electromagnetic fields. This feature becomes more important as the application of solid-state components in power plants increases. It is particularly important in providing protection against electromagnetic pulses generated by lightning.
OCRE believes this is sound advice and recommends that the NRC require the use of armored cable in the ABWR g.nd in all future nuclear power plants (emphasis added).
ABR-CE Response for System 80+:
ABB-CE strongly disagrees with any suggestion that NRC extend a favorable consideration of this comment to the System 80+m Standard Plant design. The System 80+ Standard Design includes a requirement that cables inside Containment and the Shield Building Annulus used for safe shutdown functions have three-hour fire rated cable protection (i.e., mineral insulated cable or equivalent). This commitment is made in Sections 9.5.1.1.2,9.5.1.2, and 9.5.1.3.8 of the System 80+ Design Control Document (DCD). Mineral insulted cable performs the same function as armored cable and is considered superior to armored cable. This was discussed with the ACRS Subcommittee on ABB-CE Standard Plant Designs during their review of System 80+
fire protection capability (starting on page 394 of the Official Transcript for the April 6,1994 meeting). The ACRS Subcommittee, including Mr. Wylie (who contributed to the ACRS comment quoted by OCRE), and the ACRS full Committee, as well as the NRC staff, agreed with the selection of mineral insulated cable for the System 80+ Standard Plant design. Mineral insulated cable is sheathed with a m'meral cupro-nickel metal that has been successfully tested for fire resistance by Underwriters Laboratories, Inc. It is superior to arrnored cable since the insulation is continuous rather than interlocked at insulation joints. A.dditional cable protection features are described in Section 8.3.1.6 of the System 80+ DCD.
Outside the containment and annulus, mineral insulated or armored cable is not required for fire protection since redundant divisions of safety related equipment are completely separated by 1
three-hour fire rated barriers. The exceptions are the control room and the remote shutdown room which are both physically separated and electrically isolated from each other. This exceeds the requirements imposed on currently operating plants which stipulate that cable for redundant divisions shall be spatially separated and that fire suppression systems be provided.
Signal cables are routed in cable trays and conduits separate from those for power cables to l funher reduce the potential for elect.omagnetic interference. Where it is desired to provide l
additional assurance of electromagnetic interference protection, shielded cables (with, e.g., woven metallic or metal coated mylar wrappings) are used. Cable qualified to IEEE Standard 383 is used 1
- such cable resists propagation of a fire. Also, components requiring electromagnetic l interference protection are placed in shielded cabinets.
Furthermore, the control and signal cables on the System 80+ Standard Plant Design are primarily '
fiber optic. This reduces the number of cables susceptible to fire and electromagnetic interference by approximately a factor of ten. Voltage on cable inside the control room is limited to 120 volts, significantly reducing the likelihood of a fire being staned or for electromagnetic interference (see ,
the ACRS transcript referenced above, starting on page 660, for additional discussion of the !
control room cabling system). ,
i f
In summary, the System 80+ design already satisfactorily addresses the basis of the concern raised by OCRE.
I t
i i
2 P
b