|
---|
Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20133D1201996-12-16016 December 1996 Requests Authorization for GE to Conduct narrowly-focused Review of Design Certification Rule for ABWR Before It Is Sent to Ofr & to Urge That Staff Rule Issuance Activities Be Expedited to Max Extent Feasible,All Re 10CFR52 ML20116C3331996-07-25025 July 1996 Comment Supporting Proposed Rule 10CFR52 Re Draft Final Design Certification Rules for ABWR & Sys 80+ Std Designs ML20116C2501996-07-24024 July 1996 Comment on Proposed Rule 10CFR52 Re Std Design Certification for Us Advanced BWR & Sys 80+ Std Designs ML20115J6831996-07-23023 July 1996 Comment on Supplementary Notice of Proposed Rulemaking for Design Certification of ABWR Under 10CFR52.GE Concerned About Lack of Design Finality Inherent in Identified Draft Rule Provisions ML20092B5721995-08-31031 August 1995 Comment Supporting Pr 52 60FR17902 Re Standard Design Certification for Us Advanced BWR Design ML20087H7241995-08-16016 August 1995 Comment Opposing Proposed Rule 10CFR2 Re Comment on Revision of NRC Enforcement Policy ML20087H8501995-08-15015 August 1995 Comment on Proposed Rule 10CFR52 Re Standard Design Certification for Us ABWR Design & Sys 80+ Design. Supports NEI Comments L-95-015, Comment Supporting Proposed Rule 10CFR52 Re ABWR Design & Sys 80+ Design1995-08-15015 August 1995 Comment Supporting Proposed Rule 10CFR52 Re ABWR Design & Sys 80+ Design ML20087F8181995-08-12012 August 1995 Comment on Proposed Rule 10CFR52 Re Standard Design Certification for Us Advanced Boiling Water Reactor Design. Recommends That Staff Require Use of Armored Electrical Cable in Advanced LWRs ML20087H8301995-08-10010 August 1995 Comment on Proposed 10CFR52 Re Design Certification Rules for Standardized Advanced Reactors.Supports NEI Comments ML20087H8221995-08-10010 August 1995 Comment on Proposed Rule 10CFR52 Re Design Certification Rules for Standardized Advanced Reactors.Supports NEI Comments ML20087F7951995-08-0707 August 1995 Comment Supporting Proposed Rule 10CFR52 Re Standard Design Certification for Us Boiling Water Reactor Design & Standard Designing Certification for Sys 80+ Design ML20087F9161995-08-0707 August 1995 Comment Supporting Proposed Rule 10CFR52 Re Proposed Advanced Reactor Design Certification Rules ML20087C1971995-08-0707 August 1995 Comment on Proposed Rule 10CFR52 Re Standard Design Certifications for Us Advanced Boiling Water Reactor & Sys 80+ Designs.Doe Believes That Such Designs Can Significantly Complement Nation Energy Strategy ML20087C0411995-08-0707 August 1995 Comment Supporting Proposed Rule 10CFR52 Re Std Design Certifications for Us Advanced BWR & Sys 80+ Designs ML20087C7671995-08-0606 August 1995 Comment Supporting Pr 10CFR42 Re Std Design Certification for Us Advanced BWR Design & for Sys 80+ Design L-95-225, Comment Supporting Proposed Rule 10CFR52 Re, Std Design Certification for Us ABWR Design & Std Design Certification for Sys 80+ Design1995-08-0404 August 1995 Comment Supporting Proposed Rule 10CFR52 Re, Std Design Certification for Us ABWR Design & Std Design Certification for Sys 80+ Design ML20087C0691995-08-0404 August 1995 Comments on Proposed Rule 10CFR52 Re Std Design Certification of Us Advanced BWR & Sys 80+ Designs.Urges Commission to Carefully Consider Recommendations for Correcting Process Deficiencies Inherent in Noprs ML20087C0901995-08-0404 August 1995 Comment Supporting Pr 10CFR52 Re Design Certification Rules for Standardized Advanced Reactors ML20087C0981995-08-0404 August 1995 Comment Supporting Pr 10CFR52 Re Design Certification Rules for Standardized Advanced Reactors ML20087C1051995-08-0404 August 1995 Comments on Proposed Rule 10CFR52 Re Std Design Certification for Advanced BWR Design.Urges Commission to Modify Proposed Rules as Recommended by NUMARC to Ensure Stability & Certainty of Part 52 Licensing Process ML20087C1351995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Proposed Design Certification Rules for GE ABWR & ABB/C-E Sys 80+ Std Plant Designs.New Process Must Greatly Reduce Financial Risks of Unwarranted & Uncontrollable Delay Characteristics ML20087C1091995-08-0404 August 1995 Comment Supporting Pr 10CFR52 Re Std Design Certifications for Us Advanced Boiling Water Reactor & Sys 80+ Std Designs ML20087C1261995-08-0404 August 1995 Comment Opposing Proposed Rule 10CFR52 Re Standard Design Certification for General Electric ABWR & Abb/Combustion Engineering Sys 80+ Advanced Pressurized Water Reactor ML20087H7501995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Std Design Certification for ABWR Design & Std Design Certification for Sys 80+ Design ML20087C1481995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Std Design Certifications for Us Advanced BWR & Sys 80+ Std Designs. Endorses & Supports Positions Set Forth in NEI Comments ML20087H7331995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Standard Design Certification for ABWR Design & Standard Design Certification for Sys 80+ Design.Concurs w/ABB-CE Comments & NEI Recommendations ML20087C1531995-08-0404 August 1995 Comment Opposing Proposed Rule 10CFR52 Re Standard Design Certification for Sys 80+ Advanced Pressurized Water Reactor ML20087C2611995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re ABWR & Sys 80+ Designs. Goal of Safer,More Reliable New Nuclear Plant Designs Has Been Emphatically Achieved ML20087C2021995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Design Certification Rules for General Electric ABWR & Abb/Combustion Engineering Sys 80+ Standard Plant Designs ML20087C1631995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Design Certification Rules for Standardized Advanced Reactors.Supports Comments Submitted by NEI ML20087C1711995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Design Certification for Standardized Advanced Reactors.Supports Comments Made by NEI ML20087C1321995-08-0303 August 1995 Comment Opposing Proposed Rule 10CFR52 Re Rulemaking for Std Design Certification for Sys 80+ Design ML20087C3071995-08-0303 August 1995 Comment Supporting Proposed Rule 10CR52, Std Design Certification of Us ABWR Design ML20087C0781995-08-0303 August 1995 Comment Opposing Proposed Rule 10CFR52 Re Standard Design Certification for Sys 80+ Advanced Pressurized Water Reactor ML20087C0761995-08-0202 August 1995 Comment on Proposed Design Certification Rule 10CFR52 Re Standardized Advanced Reactors.Urges Commission to Carefully Consider Industry Comments & to Adopt Recommedations Therein ML20087C2891995-08-0202 August 1995 Comment Supporting Proposed Rule 10CFR52, Design Certification for Standardized Advanced Reactors & Sys 80+ ML20087C0851995-08-0202 August 1995 Comments on Proposed Rule 10CFR52 Re Design Certification Rules for Std Advanced Reactors.Urges Commission to Carefully Consider Industry Comments & to Adopt Recommendations ML20087C1451995-08-0202 August 1995 Comment Opposing Proposed Rule 10CFR52 Re Design Certification for Standardized Advanced Reactors ML20087C2291995-07-31031 July 1995 Comment Supporting Proposed Rule 10CFR52 Re, Std Design Certification for Us ABWR Design ML20087C0971995-07-31031 July 1995 Comment Opposing Proposed Rule 10CFR52 Re Standard Design Certification for Sys 80+ Advanced Pressurized Water Reactor ML20059L2041994-01-26026 January 1994 Transcript of 940126 Briefing by GE in Rockville,Md Re Status of ABWR Application for Design Certification.Pp 1-45. Supporting Documentation Encl ML20127M3111992-11-19019 November 1992 Transcript of ACRS ABWR (GE) Subcommittee 921119 Meeting in Bethesda,Md.Pp 1-295 1996-07-25
[Table view] Category:PUBLIC COMMENTS ON PROPOSED RULES & PETITIONS FOR
MONTHYEARML20133D1201996-12-16016 December 1996 Requests Authorization for GE to Conduct narrowly-focused Review of Design Certification Rule for ABWR Before It Is Sent to Ofr & to Urge That Staff Rule Issuance Activities Be Expedited to Max Extent Feasible,All Re 10CFR52 ML20116C3331996-07-25025 July 1996 Comment Supporting Proposed Rule 10CFR52 Re Draft Final Design Certification Rules for ABWR & Sys 80+ Std Designs ML20116C2501996-07-24024 July 1996 Comment on Proposed Rule 10CFR52 Re Std Design Certification for Us Advanced BWR & Sys 80+ Std Designs ML20115J6831996-07-23023 July 1996 Comment on Supplementary Notice of Proposed Rulemaking for Design Certification of ABWR Under 10CFR52.GE Concerned About Lack of Design Finality Inherent in Identified Draft Rule Provisions ML20092B5721995-08-31031 August 1995 Comment Supporting Pr 52 60FR17902 Re Standard Design Certification for Us Advanced BWR Design ML20087H7241995-08-16016 August 1995 Comment Opposing Proposed Rule 10CFR2 Re Comment on Revision of NRC Enforcement Policy ML20087H8501995-08-15015 August 1995 Comment on Proposed Rule 10CFR52 Re Standard Design Certification for Us ABWR Design & Sys 80+ Design. Supports NEI Comments L-95-015, Comment Supporting Proposed Rule 10CFR52 Re ABWR Design & Sys 80+ Design1995-08-15015 August 1995 Comment Supporting Proposed Rule 10CFR52 Re ABWR Design & Sys 80+ Design ML20087F8181995-08-12012 August 1995 Comment on Proposed Rule 10CFR52 Re Standard Design Certification for Us Advanced Boiling Water Reactor Design. Recommends That Staff Require Use of Armored Electrical Cable in Advanced LWRs ML20087H8301995-08-10010 August 1995 Comment on Proposed 10CFR52 Re Design Certification Rules for Standardized Advanced Reactors.Supports NEI Comments ML20087H8221995-08-10010 August 1995 Comment on Proposed Rule 10CFR52 Re Design Certification Rules for Standardized Advanced Reactors.Supports NEI Comments ML20087F7951995-08-0707 August 1995 Comment Supporting Proposed Rule 10CFR52 Re Standard Design Certification for Us Boiling Water Reactor Design & Standard Designing Certification for Sys 80+ Design ML20087F9161995-08-0707 August 1995 Comment Supporting Proposed Rule 10CFR52 Re Proposed Advanced Reactor Design Certification Rules ML20087C1971995-08-0707 August 1995 Comment on Proposed Rule 10CFR52 Re Standard Design Certifications for Us Advanced Boiling Water Reactor & Sys 80+ Designs.Doe Believes That Such Designs Can Significantly Complement Nation Energy Strategy ML20087C0411995-08-0707 August 1995 Comment Supporting Proposed Rule 10CFR52 Re Std Design Certifications for Us Advanced BWR & Sys 80+ Designs ML20087C7671995-08-0606 August 1995 Comment Supporting Pr 10CFR42 Re Std Design Certification for Us Advanced BWR Design & for Sys 80+ Design L-95-225, Comment Supporting Proposed Rule 10CFR52 Re, Std Design Certification for Us ABWR Design & Std Design Certification for Sys 80+ Design1995-08-0404 August 1995 Comment Supporting Proposed Rule 10CFR52 Re, Std Design Certification for Us ABWR Design & Std Design Certification for Sys 80+ Design ML20087C0691995-08-0404 August 1995 Comments on Proposed Rule 10CFR52 Re Std Design Certification of Us Advanced BWR & Sys 80+ Designs.Urges Commission to Carefully Consider Recommendations for Correcting Process Deficiencies Inherent in Noprs ML20087C0901995-08-0404 August 1995 Comment Supporting Pr 10CFR52 Re Design Certification Rules for Standardized Advanced Reactors ML20087C0981995-08-0404 August 1995 Comment Supporting Pr 10CFR52 Re Design Certification Rules for Standardized Advanced Reactors ML20087C1051995-08-0404 August 1995 Comments on Proposed Rule 10CFR52 Re Std Design Certification for Advanced BWR Design.Urges Commission to Modify Proposed Rules as Recommended by NUMARC to Ensure Stability & Certainty of Part 52 Licensing Process ML20087C1091995-08-0404 August 1995 Comment Supporting Pr 10CFR52 Re Std Design Certifications for Us Advanced Boiling Water Reactor & Sys 80+ Std Designs ML20087C1261995-08-0404 August 1995 Comment Opposing Proposed Rule 10CFR52 Re Standard Design Certification for General Electric ABWR & Abb/Combustion Engineering Sys 80+ Advanced Pressurized Water Reactor ML20087C1631995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Design Certification Rules for Standardized Advanced Reactors.Supports Comments Submitted by NEI ML20087H7501995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Std Design Certification for ABWR Design & Std Design Certification for Sys 80+ Design ML20087H7331995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Standard Design Certification for ABWR Design & Standard Design Certification for Sys 80+ Design.Concurs w/ABB-CE Comments & NEI Recommendations ML20087C2611995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re ABWR & Sys 80+ Designs. Goal of Safer,More Reliable New Nuclear Plant Designs Has Been Emphatically Achieved ML20087C2021995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Design Certification Rules for General Electric ABWR & Abb/Combustion Engineering Sys 80+ Standard Plant Designs ML20087C1711995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Design Certification for Standardized Advanced Reactors.Supports Comments Made by NEI ML20087C1531995-08-0404 August 1995 Comment Opposing Proposed Rule 10CFR52 Re Standard Design Certification for Sys 80+ Advanced Pressurized Water Reactor ML20087C1481995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Std Design Certifications for Us Advanced BWR & Sys 80+ Std Designs. Endorses & Supports Positions Set Forth in NEI Comments ML20087C1351995-08-0404 August 1995 Comment on Proposed Rule 10CFR52 Re Proposed Design Certification Rules for GE ABWR & ABB/C-E Sys 80+ Std Plant Designs.New Process Must Greatly Reduce Financial Risks of Unwarranted & Uncontrollable Delay Characteristics ML20087C0781995-08-0303 August 1995 Comment Opposing Proposed Rule 10CFR52 Re Standard Design Certification for Sys 80+ Advanced Pressurized Water Reactor ML20087C1321995-08-0303 August 1995 Comment Opposing Proposed Rule 10CFR52 Re Rulemaking for Std Design Certification for Sys 80+ Design ML20087C3071995-08-0303 August 1995 Comment Supporting Proposed Rule 10CR52, Std Design Certification of Us ABWR Design ML20087C0851995-08-0202 August 1995 Comments on Proposed Rule 10CFR52 Re Design Certification Rules for Std Advanced Reactors.Urges Commission to Carefully Consider Industry Comments & to Adopt Recommendations ML20087C0761995-08-0202 August 1995 Comment on Proposed Design Certification Rule 10CFR52 Re Standardized Advanced Reactors.Urges Commission to Carefully Consider Industry Comments & to Adopt Recommedations Therein ML20087C2891995-08-0202 August 1995 Comment Supporting Proposed Rule 10CFR52, Design Certification for Standardized Advanced Reactors & Sys 80+ ML20087C1451995-08-0202 August 1995 Comment Opposing Proposed Rule 10CFR52 Re Design Certification for Standardized Advanced Reactors ML20087C0971995-07-31031 July 1995 Comment Opposing Proposed Rule 10CFR52 Re Standard Design Certification for Sys 80+ Advanced Pressurized Water Reactor ML20087C2291995-07-31031 July 1995 Comment Supporting Proposed Rule 10CFR52 Re, Std Design Certification for Us ABWR Design 1996-07-25
[Table view] |
Text
, - - - - - - - - -- -- - - - - - - - - - - _
s Ent:rcy Cper ti:nt,Inc.
cr~ ENTERGY DOCKETED 3$iOeme
-s su ussec F,n 0013M 5768
% SEP -5 All :21 ?"a'"o*==
rw n .,
- 0FFICE OF SECPETARY DOCXETr G o MRV!CE -
BRA-ici DOCKET NUMBER BD August 31,1995 PROPOSED RULE ra sa Secretary, U.S. Nuclear Regoiatory Comm. .
ission
((doFe.W\oh Washington, D.C. 20555 Attention: Docketing and Service Branch
SUBJECT:
Proposed Rule " Standard Design Certification for the U.S. Advanced Boiling Water Reactor Design (60 Federal Register 17903, April 71995)
CNRO-95/00019 Gentlemen:
Entergy Operations, Inc. (EOI) is pleased to comment upon the above-cited Federal Register notice. We strongly support the innovative concepts incorporated into 10 CFR Part 52 in addition to the sound, fundamental principles inherent to the Pan 52 process.
However, there are positions advocated within the rule that appear contrary to the pnnciples and would introduce licensing uncertainties and unnecessary burdens on future licensees. Specifically, we believe the proposed rule Does not provide sufricient finality for resolved issues and permitted changes, Will, with the new " applicable regulations," create the potential for destabilizing backfits, Lacks a provision to ensure that the NRC will have a stable and predictable process for making its fmdings that the ITAAC (inspections, tests, analyses and acceptance criteria) have been met, is burdensome and more restrictive thnn needed by requiring the consideration of severe accident and probabilistic analy.ses in section 50.59 safety evaluations (in order to preserve severe accident insights),
Does not allow the design certification applicant to make 50.59-like changes after design certification, and 9509120073 950831 PDR PR 52 60FR17902 PDR pc
' ~ ^
'p,.
s Proposed Rule" Standard Design Certification for the U.S. Advanced Boiling Water Reactor Design (60 FederalRegister 17903, April 71995)
August 31,1995 CNRO-95/00019 Page 2 of 2 Does not incorporate the substantive provisions in the design co, ,rol documents introduction into the design certification rules.
EOI views the proposed rule as an excellent step towards a predictable and stable licensing process for future plants and encourages the NRC to move fonvard in this area.
We appreciates the opportunity to provide comments on the subject notice.
Sincerely,
{fs D/RLT/baa cc: Mr. H. W. Keiser Mr. William H. Rasin (NEI)
Mr. J. C. Roberts