ML20092B563
| ML20092B563 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 06/30/1995 |
| From: | NEBRASKA PUBLIC POWER DISTRICT |
| To: | |
| Shared Package | |
| ML20092B560 | List: |
| References | |
| NUDOCS 9509120069 | |
| Download: ML20092B563 (2) | |
Text
>
f a
2, Estimate of Major Nuclide Composition (By Type of Waste), Percent %
(Continued) b.
americium-241 6.24 E-02 nickel-59 1.20 E-02 barium-133 3.47 E-06 nickel-63 6.55 E-01
{
cadmium-109 1.42 E-08 plutonium-238 8.16 E-06 carbon-14 2.78 E-02 plutonium-239/240 3.35 E-06 cesium-134
'1.61 E+00 plutonium-241 2.76 E-04 cesium-137 3.59 E+00 silver-110m 8.16 E-01 cerium-144 8.22 E-01 sodium-22 9.59 E-08 e
chlorine-36 1.22 E-05 strontium-89 9.59-E-04 j
cobalt-57 5.48 E-12 strontium-90 2.04 E-03 cobalt-58 3.59-E+00 polonium-210 2.61 E-06 cobalt-60 4.51 E+01 technetium-99 5.73 E-05 curium-242 7.43 E-05 transuranics 6.52 E-05 curium-243/244 8.53 E-06 tritium 9.02 E-04 iron 2.51 E+01 uranium-235 2.39 E-08 iron-59 1.01 E-01 uranium-238 1,31 E-03 krypton-85
-1.82 E+00 zinc-65 9.26 E-01 manganese-54 1.58 E+01 c.
americium-241 9.23 E-12 nickel-59 1.70 E-02 carbon-14 5.67 E-03 nickel-63 3.39 E+00 chromium-51 1.38 E-03 niobium-94 5.26 E-05 cobalt-60 3.78 E+01 plutonium-238 2.98 E-11 curium-242 1,41 E-11 plutonium-239/240 1.22 E-11 curium-243/244 3.05 E-11 plutonium-241 9.86 E-10 iron-55 5.67 E+01 technetium-99 2.53 E-05 manganese-54 2.11 E+00 tritium 1,61 E-04 3.
SOLID WASTE DISPOSITION I
NUMBER OF SHIPMENTS MQDE OF TRANSPORTATION DESTINATION 23 Exclusive Use Vehicle Barnwell, SC 1
4.
SOLIDIFICATION AGENT j
l No shipments required solidification during this semiannual period.
i 3
i B.
IRRADIATED FUEL SHIPMENTS (Disposition)
I NUMBER OF SHIPMENTS MODE OF TRANSPORTATION DESTINATION i
O N/A N/A A12 9509120069 950905 F
PDR ADOCK 05000298 i
__R_.
_ _ _ _ _ _. _ _ _ _PDR
.~
l LIST OF NRC COMMITMENTS l ATTACHMENT 3 l
9 Correspondence No: MLS950184 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory commitments.
Please notify thc: Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITTED DATE COMMITMENT OR OUTAGE None g
t I
(
1 PROCEDURE NUMBER 0.42 l
REVISION NUMBER O.2 l
PAGE 11 OF 16 l
1 1
.