s OPERATING DATA REPONT 4
DOCKET NO. 50 - 277 DATE JUNE 14, 1984 CORPLETED BY PHILADELPBIA ELECT V.R.ALDIN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-EUCLEAR TELEPHONE (215) 841-5022 l
OPERATING STATUS I NOTES: UNIT 2 CONTINUED ITS i
l PEACH BOTTON UNIT 2_...__.
l g
SCHEDULED SBUTDOWN FOR g
- 1. UNIT NAMEt l
RAY, 1984 g
ITS SIETH REFUELING AND g
- 2. REPORTING PERIOD: -....................
3293 I
l
- 3. LICENSED TilEhKAL POWER (RWT)
- g BAINTENANCE OUTAGE.
1152 l
l
- 4. NAMkPLATE RATING (GROSS RWE) :...............
g g
1065 I
l (NET RWE) :
- 5. DESIGN ELECTRICAL BATING g
I (GROSS BWE) : 1098 l
l 6 5AEIMUN DEPENDADLE CAPACITY 1
1051 l
(MET nys):
SINCE LAST REPORT, GIVE REASONS:
- 7. NAIINUM DEPENDABLE CAPACITY (ITERS NURbER 3 THROUGH 7)
U. IF CllANGES OCCUR IN CAPACITY BATINGS (NET NUE) *
- 9. POWER LEVEL TO WHICH SESTRICTED, IF ANT IY ANY:
- 10. ItEASONS YOh HEST!i1CTIONS, CUNULATIVE Y B-TO-D AT E TIIIS MONTil 86,855 3,647 744 62,283.6
- 11. Il0URS IN REPORTING PERIOD 2,584.7 0
- 12. NUMDEh 0F !!OURS REACTOR WAS CRITICAL 0.0 0.0 0.0 60,556.6
- 13. REACTOR RESEHVE SilUTDOWN ll0UNS 2,544.8 H
0.0 0.0
- 14. Il0URS GENER ATOR ON-LINE 00 l
0.0 178,420,001 lb. UllIT KELL!iVE SIIUTDOWN !!0UliS 7,865,391 4
0 f5 (5W5) 58,718,660
- 16. GROSS THERN AL ENERGY GENERATED 2,547,570 0
(MWil) 56,295,570
- 17. GROSS ELECTRICAL INEBGY GENER ATED 2,459,140
-6,680 ptVH) 69.7
- 18. NET ELECTRICAL ENEBGY GENERATED 69.8 0.0
^
69.7 69 8 i
- 19. UNIT SERVICE FACTOR 0.0 61.7
- 20. UNIT AVAILABILITY FACTok 0.0 64.2
}fn k
- 21. UNIT CAPACITY FACTOR (USING RDC NET) 63 3 F0 9 l
0 (4 N g, 12.5
- 22. UNTT cal' ACITY TACTUR (UDING DER NET) 4.4 NCO 0.0
, /
!k $
- 23. UNIT FORCED OUTAGE BATE (TYPE, DATE, AND DUR ATION OF EACH) :
- 24. SUUTDOWNS SCHEDULED OYER NEIT 6 505T251. C TENANCE n
00 %
OUT AGE UNTIL 01/16/85.
' h"h "J
OF STARTUPs 01/16/65
- 25. IF SMUTDONN AT END OF REPORT PERIOD, ESTIEATED DATE FORECAST ACHIEVED W4 (PRIOR TO CORREBCIAL OPER ATION) :
42og
- 26. UNITS IN TEST STATUS 9Q Q)act INITIAL CRITICALITT i
INITIAL ELECTRICITY
--~~.
C0553RCIAL OPERATION N REP 0 HTS.
nDGATIVE V ALUE REPORTED FOR CONSISTEN 0.
OPERATING DATA BEPOBT DOCKET No. 50 - 278 D ATE JUNE 14, 1984 COBPLETED B1 PHILADELPHIA ELECTRIC N.H.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-EUCLEAR TELEPHONE (215) 841-5022 I
UNIT 3 EXPERIENCED NO OPERATING STATU!
l NOTES:
[
SHUTDOWNS IN THE 50 NTH OF g
PEAC; BOTTOR UNIT 3....._..___.._.._...._.._.
i l
- 1. UNIT MABE:
BAY, 1984 g
- 2. REPORTING PERIOD: _. _.
BAY.
3293 i
l
- 3. LICENSED THEBBAL POWLR (RWT):
1152 l
t
- 6. NABEPLATE RATING (GBOSS BWE) : ____....
g g
10uS
[
1 (NET ENE):
- 5. DESIGN ELECTRICAL RATING g
g 1098 l
(GROSS 5WE) :
l
- 6. MAXIMUM DEPENDABLE CAPACITI g
1035 l
(HET BWE) :
SINCE LAST BEPORT, GIVE BEASONS:
- 7. MAXIMUM DEPENDABLE CAPACITY(ITEMS BUMDER 3 THROUGH 7)
IF Cll ANGES OCCUR IN CAP ACITY B ATINGS D.
(MET BEE) :
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY ANY:
HEASONS F0H HESTRICTIONS, IF 10.
CURULATIVE TR-TO-DATE THIS MONTH 82,751 3,647 744 60,144.1
- 11. HOUBS IN REPOETING PERIOD 3,344.3 744.0 0.0 REACTOR MAS CBITICAL 0.0
- 12. NUMBER OF HOURS 0.0 58,628.7 HOU Hb 3,312.5 itF.bERVV. SHUTDOVH 744.0
- 13. HMACTult 0.0 HOUBS GENERATOR ON-LINE 0.0 0.0 14.
171,631,642 r
- 15. UNIT RESERVE SHUTDOWN HOURS 2,381,582 10,593,337 (MWH) 56,345,160
- 16. GROSS TilERMAL ENERGY GENERATED 790,020 3,530,040 (RWH) 54,000,295
- 17. GROSS ELECTRICAL ENIBGY GENERATED 3,424,510 763,116 (HWH) 70.8 kET ELECTBIC AL ENERG7 GENEH ATED 100.0 90 8 10.
70 8 90 8
- 19. UNIT SERVICE FACTOB 100.0 63 2
- 20. UNIT AVAILABILITT FACTOB 99.1 90.7 6T.4 (USING RDC NET)
B5.2
- 21. UNIT CAPACITY FACTOB 75 3 7.4 (UNIYG DER SET) 9.2
- 22. UNIT CEPACYTY 7 ACTOR O.0 f
- 23. UNIT FORCED OUTAGE RATE (TTPE, DATE, AND DURATION OF EACE):
r.
[
SHUTDOWNS SCHEDULED OYER NEIT 6 EONTHS JI 24.
F STARTUP AT END OF REPORT PERIOD, ESTINATED DATE O L
FORECAST ACHIEYED
- 25. IF SHUTDOWN (PRIOR TO CORREBCI AL OPERATION) :
- 26. UNITS IN TEST STATUS INITIAL CRITICALITT INITIAL ELECTRICITY j
CORREBCIAL OPERATION
DOCKET NO. 50 - 277 UNIT SEUTDOWNS AND POWER REDUCTIONSUNIT WAME PEACH BOTTOR UNIT 2 DATE JUNE 14, 1984 COEPLETED BY PHILIDELPHIA ELECTRIC COMPAN ERY, 1984 REPORT EOETB W.H.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DITISION-NUCLEAR TELEPHONE (215) 841-5022 ISYSTEMIC05PONENTI CAUSE AND COftBECTIVE ACTION TO l
1 l
l EETB00 OF 1 LICENSEE I
EVENT l CODE I CODE i PREYENT RECUltRENCE NOol DATE I (1)I (HOURS) l (2) l REACTOR (3) 1 REPORT # I (4) l (5)
ITYPEIDUNITIONIREASONISBUTTING DOWNi l
SHUTDOWN FOR ITS SIITH REFUELING OUTAGE I
I l
I 1
I RA I RC I FUELII I I
I I
I I
I 5 I 840501 1 S ( 744.0 i C l I
I I
l I
I I
I I
I I
I I-0 t
l I
I I 744.
(4)
(3)
EIBIBIT G - INSTRUCTIONS (2)
(1)
HETHOD FOR PREPARATION OF DATA 1 - M ANUAL ENTRY SHEETS FOR LICENSEE REASON (EXPLAIN) 2 - M ANU AL SCR AM.
EVENT REPORT (LER)
F - FORCED A - EQUIPEENT FAILUBE S - SCHEDULED B - HAINTEN ANCE OR TEST 3 - AUTOMATIC SCR&B.
FILE (NUREG-0161) 4 - OTHER l EXPLAIN)
C - REFUELING D - REGULATORT RESTRICTIONE - OPER ATOR TRAINING + LICENSE EIREIN (5)
EIRIBIT I - S15E SOURCE F - ADMINISTRATITE G - OPERATION AL EBROR -(EXPLAIN)
H - OTHER(EXPLAIN) l l
6 DOCKET Wo. 50 - 278 UNIT SEUTDOWNS AND POWER BEDUCTIONS UNIT WARE PEACH BOTTOR UNIT 3 DATE JUNE 14, 1984 CORPLETED BY PHILADELPNIA ELECTRIC COMPANY HAY, 1984 REPORT HONTH N.E.ALDEN ENGINEER-IN-CHA2GE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 ISYSTEMICORPONENT! CAUSE AND CORRECTIVE I
j
{
l HETHOD OF I LICENSEE EYENT l CODE I CODE I ACTION TO N3.]
DATE I (1) I (BOURS} l (2) 1 REACTOR (3) l REPORT 4 I (4) I (5) i PREVENT RECURRENCE ITYPEIDURATIONIREASONISNUTTING DONNI i
I I
I I
I I
I I-t i
I I
I I
I I
I -
1 I
(4)
(3)
I (1)
. (2)
EIRIBIT G - INSTRUCTIONS HETHOD FOR PREPARATION OF DATA 1 - BANUAL ENTRY SHEETS FOR LICENSEE REASON F - PORCED A - EQUIP 8ENT FAILURE (EIPLAIN) 2 - M ANUAL SCRAM.
EVENT REPORT (LER)
S - SCHEDULED B - BAINTEN ANCE OR TEST 3 - AUTon ATIC SCRAB.
FILE (NUREG-0161)
C - REFUELING 4 - OTHER (EIPLAIN)
D - REGULATORY RESTRICTION (5)
E - OPER ATOR TRAINING + LICENSE EIARIN ATION Y - ADMINISTRATIVE EIRIBIT I - SABE SOURCE G - OPER ATION AL ERROR (EIPLAIN)
H - OTHER(EIPLAIN)
I AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50 - 277 UNIT PEACH BOTTOM UNIT 2 DATE JUNE 14, 1984 COMPANY PHILADELPHIA ELECTRIC COMPANY W.H.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 MONTH MAY 1984 AVERAGE DAI'LY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL DAY (MW E-N ET)
1 0
18 0
2 0
19 0
3 0
20 0
4 0
21 0
S 0
22 0
6 0
23 C
0 7
0 24 K
0 8
0 25 0
9 0
26 0
10 0
27 0
11 0
-)
28 0
12 t
0 29 t
0 b
13 0
30 0
14
{
31 0
0 lb 0
16
AVEhAGE DAILY UNIT POWER LEVEL DOCKET No. 50 - 278 UNIT PEACH BOTTOM UNIT 3 DATE JUNE 14, 1964 COMPANY PHILADELPHIA ELECTRIC COMPAN W.M.ALDEN ENGINEER-IN-CHARGE LICENSING SECTION GENERATION DIVISION-NUCLEAR TELEPHONE (215) 841-5022 i
i MONTH MAY 1984 i
DAY AVEHAGE DAILY POWER LEVEL DAY AVERAGE DAILY P0hEh LEVEL (MWE-NET) i (MW E-N ET) 1059 17 1057 1
1063 1054 18 2
1062 19 1054 3
1060 20 l
1057 f
1033 4
21 1060 r
l 5
992 22 1058 6
958 23 1
1060 7
956 24 l-1058 P
U 954 25 1061 l
9 952 26 1060 10 953 27 1062 11 l_.
956 28 1053 I
12 958 t
29 10$b 13 j,
956 30 1059 14 y
959 31 1055 15 1060 f
16 t
I l
. _,. _ ~., -., - -,,.. -.,,,,,.., _. _. _., -,.,. _
Docket No. 50-277
".o Monthly Ope sting Report for M y, 1984 REFUELING INFORMATION 1.
Name of facility:
Peach Bottom Unit 2 Scheduled date for next refueling shutdown:
2.
April 27, 1984 Scheduled date for restart following refueling:
3.
January 16, 1985 Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
4.
Yes If answer is yes, what, in general, will these be?
Technical Specifications to accommodate reload fuel.
Technical Modifications to reactor core operating limits.
specification changes associated with snubber reduction program.
for submitting proposed licensing action and 5.
Scheduled date (s) supporting information:
July 1,1984 for reload fuel except snubber reduction program -
August 1, 1984.
Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design 6.
or performance analysis methods, significant changes in fuel design, new operating procedures:
None expected.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
Core - 764 Fuel Assemblies (a)
Fuel Pool - 1170 Fuel Assemblies, 58 Fuel Rods 5
(b)
The present licensed spent fuel pool storage capacity and the size IN 8.
of any increase in licensed storage capacity that has been
[
requested or is planned, in number of fuel assemblies:
The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
The projected date of the last refueling that can be discharged t@
9.
the spent fuel pool assuming the present licensed capacity.
September, 1990 (March, 1986, with reserve full core discharge)
I Docket No. 50-278
~
Attachment to Monthly Operating Report for May, 1984 REFUELING INFORMATION_
1.
Name of facility:
Peach Bottom Unit 3 Scheduled date for next refueling shutdown:
2.
March 30, 1985.
Scheduled date for restart following refueling:
3.
September 21, 1985.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
4.
Yes.
If answer is yes, what, in general, will these be?
Technical Specifications to accommodate reload fuel.
Technical Modifications to reactor core operating limits.
specification changes associated with snubber reduction program.
for submitting proposed licensing action and 5.
Scheduled date (s) supporting information:
June 21, 1985 for reload fuel licensing considerations associated with refueling, 6.
Important fuel design or supplier, unreviewed design e.g., new or dif ferent or performance analysis methods, significant changas in fuel design, new operating procedures:
None expected.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
Core - 764 Fuel Assemblies (a)
Fuel Pool - 1212 Fuel Assemblies, 6 Fuel Rods (b)
The present licansed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been 8.
requested or is planned, in number of fuel assemblies:
L The spent fuel pool storage capacity has been relicensed for 2816 fuel assemblies.
The projected date of the last refueling that can be discharged to 9.
the spent fuel pool assuming the present licensed capacity.
September, 1991 (March, 1987, with reserve for full core discharge)
Docket Nos. 50-277/50-278 Attachment to Monthly Operating Report for May, 1984 PEACH BOTTOM ATOMIC POWER STATION NARRATIVE
SUMMARY
OF OPERATING EXPERIENCES May, 1984 Unit 2 Unit 2's Sixth Refueling and Primary System Pipe ReplacementDuring the first Outage continued throughout the month of May.
week of May, the vessel head, steam dryer, and moisture se were removed.
the spent fuel pool in preparation for pipe replacements.
Critical path work currently being performed is Control Rod Drive Removals & Vessel Inservice Inspcction (ISI).
UNIT 3 On May 21, a leak in the full power.
The unit began the month at3C feedwater heater necessitated the remov
'C' feedwater l
The unit was maintained at 91% power for the L
heater string.
remainder of the month.
On May 23, a 30% of Tech. Spec. vent stack radiation p-when the mechanical compressor was isolated.
On May 29, the RCIC in-containment isolation valve was found to The Tech. Specs. required shutdown and repair-be inoperable.
within seven days.
l I
F j
b L
i t
I
r PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 (215)8414000 June 14, 1984 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
SUBJECT:
Peach Bottom Atomic Power Station Monthly Operating Report Gentlemen:
Attached are twelve copies of the monthly operating report for Peach Bottom Units 2 and 3 for the month of May, 1984 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.
Very truly yours, W s' W. T. Ullrich Superintendent i
Nuclear Generation Division l