Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093F829 + (15:27:14, 13 December 2024)
- ML20093F827 + (15:27:14, 13 December 2024)
- ML20093F820 + (15:27:15, 13 December 2024)
- ML20093F806 + (15:27:16, 13 December 2024)
- ML20093F794 + (15:27:16, 13 December 2024)
- ML20093F792 + (15:27:17, 13 December 2024)
- PY-CEI-NRR-0119, Provides Updated Info Re Results of Mar 1984 Caseload Forecast Panel Visit,Basis for 1985 Completion Projection. Tdi Diesel Generator Requalification Program Underway.Mods Will Be Completed or Identified by End of 1984 + (15:27:18, 13 December 2024)
- ML20093F784 + (15:27:18, 13 December 2024)
- ML20093F775 + (15:27:19, 13 December 2024)
- GO2-84-424, Responds to IE Bulletin 84-02, Failures of GE Type Hfa Relays in Use in Class IE Safety Sys. Plant Maint Procedure for Relay Coil Replacement & Contact Adjustment Revised to Prohibit Use of Hfa 51 Relays + (15:27:20, 13 December 2024)
- ML20093F771 + (15:27:20, 13 December 2024)
- ML20093F759 + (15:27:21, 13 December 2024)
- ML20093F755 + (15:27:22, 13 December 2024)
- ML20093F754 + (15:27:22, 13 December 2024)
- ML20093F749 + (15:27:23, 13 December 2024)
- ML20093F753 + (15:27:23, 13 December 2024)
- ML20093F747 + (15:27:24, 13 December 2024)
- 05000306/LER-1995-004-02, :on 950907,lockout of 2RY Transformer Resulted in auto-start of Number 22 CCW Pump.Caused by Ground Fault on B Phase Substation Terminal of Feeder Cable from 2RSY Transformer.Replaced All Substation Potheads + (15:27:26, 13 December 2024)
- ML20093F739 + (15:27:27, 13 December 2024)
- DCL-84-243, Forwards Response to Govt Accountability Project Allegations Contained in 840323,0412,0503 & 31 Ltrs.All Responses Verified & Prof Resumes of Verifiers Either Previously Submitted or Encl + (15:27:28, 13 December 2024)
- ML20093F713 + (15:27:29, 13 December 2024)
- ML20093F714 + (15:27:29, 13 December 2024)
- L-95-270, Comment Supporting Proposed Rules 10CFR2,50 & 51 Re Decommission of NPPs + (15:27:30, 13 December 2024)
- RBG-18170, Final Deficiency Rept DR-172 Re Rupture of Jacket Water Shroud on Standby Tdi Diesel Generator During Flushing. Damaged Shroud to Be Repaired or Replaced Prior to Sys Turnover.Item Not Reportable Per 10CFR50.55(e) + (15:27:30, 13 December 2024)
- ML20093F702 + (15:27:31, 13 December 2024)
- ML20093F699 + (15:27:35, 13 December 2024)
- ML20093F697 + (15:27:36, 13 December 2024)
- ML20093F696 + (15:27:36, 13 December 2024)
- ML20093F692 + (15:27:37, 13 December 2024)
- ML20093F689 + (15:27:38, 13 December 2024)
- 05000282/LER-1984-006-01, :on 840831,reactor Tripped During Startup. Caused by Steam Flow/Feedwater Flow Mismatch Indication. Faulty Feedwater Flow Transmitter & Regulating Valve to Be Replaced + (15:27:39, 13 December 2024)
- ML20093F681 + (15:27:41, 13 December 2024)
- ML20093F674 + (15:27:42, 13 December 2024)
- TXX-4317, Final Deficiency Rept SDAR-150 Re NSSS Auxiliary Relay Tracks Not Qualified Per IEEE-323-1974.Initially Reported on 840831.Matter Not Reportable Per 10CFR50.55(e) + (15:27:43, 13 December 2024)
- ML20093F671 + (15:27:43, 13 December 2024)
- ML20093F665 + (15:27:44, 13 December 2024)
- ML20093F662 + (15:27:45, 13 December 2024)
- 05000271/LER-1984-010, :on 840616,after Reactor Shut Down,Stack Gas Radiation Monitor II Improperly Responded & on 840617, During Stack Gas II Radiation Calibr Monitor Found W/Gamma Sensitive Detector Vice + (15:27:46, 13 December 2024)
- 05000413/LER-1995-005-02, :on 950913,TS Violation Occurred.Caused by Inadequate Written Communication Due to Technical Inaccuracies in Calibr.Calibr Procedures Placed on Hold Until Revs Made to Ensure Integrity + (15:27:49, 13 December 2024)
- ML20093F653 + (15:27:50, 13 December 2024)
- NLS8400018, Forwards Response to IE Bulletin 84-02, Failures of GE Type Hfa Relays in Use in Class IE Safety Sys. Util Will Change Out All Hfa Relays Associated w/safety-related Sys During Fall 1984 Refueling Outage + (15:27:50, 13 December 2024)
- ML20093F652 + (15:27:51, 13 December 2024)
- RBG-19022, Interim Deficiency Rept DR-197 Re Seismic Testing of Category I Air Compressor Used for Penetration Valve Leakage Control Sys.Next Rept Expected by 841107 + (15:27:52, 13 December 2024)
- ML20093F649 + (15:27:52, 13 December 2024)
- ML20093F634 + (15:27:55, 13 December 2024)
- ML20093F631 + (15:27:56, 13 December 2024)
- ML20093F623 + (15:27:57, 13 December 2024)
- ML20093F622 + (15:27:58, 13 December 2024)
- 05000454/LER-1995-003-10, :on 950913,containment Leak Detector Was Inoperable.Caused by Misinterpretation of TS Requirements by Shift Control Room Engineers Involved.Wrote Daily Order to Identify Correct Interpretation of TS 3.4.6.1 + (15:28:00, 13 December 2024)
- ML20093F613 + (15:28:01, 13 December 2024)
- RC-95-0252, Forwards Rev 7 to General Test Procedure (Gtp) GTP-301, IST of Pumps Second Ten Yr Interval, Incorporating Guidance from NUREG-1482 in Response to GL 89-04,Suppl 1 + (15:28:02, 13 December 2024)