ML20093F754
| ML20093F754 | |
| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 10/12/1995 |
| From: | Marsh W SOUTHERN CALIFORNIA EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-89-10, NUDOCS 9510180123 | |
| Download: ML20093F754 (2) | |
Text
.
q f5*"
m Southem Califomia Edison Company P. O. BOX 12e SAN CLEMENTE, CALIFORNIA 92674-0128 October 12, 1995 WALTEH C. MARSH TELEPHONE U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.
20555 Gentlemen:
Subject:
Docket No. 362 Generic Letter 89-10: Safety-Related Motor-Operated Valve Testing and Surveillance San Onofre Nuclear Generating Station Unit 3
Reference:
Letter from R. M. Rosenblum (SCE) to the Document Control Desk (NRC) dated January 11, 1990;
Subject:
Docket Nos. 50-206, 50-361 and 50-362, Generic Letter 89-10: Safety-Related Motor-0perated Valve Testing and Surveillance, San Onofre Nuclear Generating Station Units 1, 2, and 3 This letter is to notify the NRC that Southern California Edison (Edison) has completed the design-basis reviews, analyses, '.erifications, tests, and inspections to comply with recommendations (a) through (h) of Generic Letter (GL) 89-10 for Sr1 Onofre Unit 3.
Edison initially responded to GL 89-10 by the January 11, 1990, letter, referenced above.
Testing began during the Unit 3, Cycle 6 refueling outage and was completed during the Unit 3, Cycle 8, refueling outage. A GL 89-10 closure report for Unit 3, dated September 27, 1995, is being retained at San Onofre and is available for your review.
Please let me know if you have any additional questions.
Very truly yours, Albh8b State of California county of San Diego on October 12. 1995 before me, Linda L. Rulon
, personally appeared Walter C. Marsh
, personally known to me to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument.
WITNESS my hand and official seal.
j f
UNOA L RULolt Signature i
.k l
Notwy PuthCameds ORANGE COUNTY 9510180123 951012
)
up comm. cxu nu ooses (
)./' O PDR ADOCK 05000362 P
s
%g ' ~e aa f *~*
Document Cgntrol Desk,
'L. J. Callan, Regional Administrator, NRC Region IV cc:
J. E. Dyer, Director, Division of Reactor Projects, Region IV K. E. Perkins, Jr., Director, Walnut Creek Field Office, NRC Region IV J. A. Sloan, NRC Senior Resident Inspector, San Onofre Units 2 & 3 M. B. Fields, NRC Project Manager, San Onofre Units 2 and 3 1
i
!