ML20093F689

From kanterella
Jump to navigation Jump to search
Revised Page 4 to Monthly Operating Rept for Aug 1984
ML20093F689
Person / Time
Site: Ginna 
Issue date: 08/31/1984
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
NUDOCS 8410150185
Download: ML20093F689 (2)


Text

_ _ _ _

.f

.t F

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT Ginna Station, Unit #1 DATE September 18, 1984 COMPLETED BY ub# E -

14/6mA Andrew E.

McNamara TELEPHONE 1 (315) 524-4446 EXT. 301 at Ginna MONTH August 1984 The reactor power level was maintained at 100% for the majority of the report period, with two exceptions.

On August 5 the reactor power level was reduced to ~ 45% to perform a series of turbine valve and trip tests.

On August 27 the reactor power level was reduced to ~ 26%.

The details are explained on page 3 of this report.

'l/

8410150185 840831 I/

PDR ADOCK 05000244 R

PDR

. 'l Y

,9

~t*

e s, y,-

e,..,

voeu 7

I a

ROCHESTER GAS AND ELECTRIC CORPORATION

  • 89 EAST AVENUE, ROCHESTER, N.Y.14649 Tr u e..om t

== e. coot n o 546 2700 l

l GINNA STATION September 18, 1984 Director, Office of Management Information and Program Analysis U.S. NUCLEAR REGULATORY COMMISSION Washington, DC 20555

Subject:

Monthly Report for August, 1984 Operating Status Information R.

E.

Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244

Dear Sir:

Please find attached a revised Page 4 for the August 1984 NRC Report.

Please disregard the previous Page 4 dated September 12, 1984.

Very truly yours,

,h h b Andrew E.

McNamara Operations Department AEM/eeg Attachment cc:

Dr. L.~..as E.

Murley NRC (1)

G

,p