ML20093F784

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 84-03, Refueling Cavity Water Seal. Fabrication on Reactor Vessel Pool Seal Suspended Indefinitely Due to Const Delay.Summary Rept Will Be Provided When Fabrication of Existing Design Executed
ML20093F784
Person / Time
Site: Satsop
Issue date: 10/04/1984
From: Sorensen G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
GO3-84-640, IEB-84-03, IEB-84-3, NUDOCS 8410150224
Download: ML20093F784 (2)


Text

-

(U.

p RECEWED HEC Washington Public Power Supply System Box 1223 Elma, Washington 9854 (2

4g-44g { r October 4, 1984 G03-84-640 REGION V M,,.

Mr. J.B. Martin Regional Administrator

~U.S. Nuclear Regulatory Commission Region V 1450 Maria Lane, Suite 260 Walnut Creek, California 94596'

~

Subject:

NUCLEAR PROJECT NO. 3 DOCKET NO. 50-508

.IE BULLETIN 84-03

Reference:

a)

IE Bulletin 84-03 " REFUELING CAVITY WATER SEAL" b)

'G03-83-544, G.C.. Sorensen to H.R. Denton, "Consi,ruc-tion Delay on WNP-3, dated July 12, 1983.

Reference a) requires a written report ev:luating the potential for and consequences of a refueling cavity risier seal failure.

The proposed design for the WNP-3 Reactor Vessel Paol Seal. is similar to that of the failed seal

described in Reference :), however, fabrication has not yet. begun and has been suspended indefinitely due to the construction delay indicated in Reference b).

Ihe concerns raised in Reference a) shall be considered prior to executing

_ fabrication of the existing design or selection of a new design.

At that time, we plan to provide the required summary report.

4 G.C.'S rensen-Manager, Regulatory Programs cc: 'U.S. Nuclear Regulatory Commission Document Control Desk, Washington D.C.

.Mr. J.A. Adams - NESCO Mr. D. Smithpeter - BPA Ebasco, Elma-

.Mr.'M.K. Yates, Ebasco, New York Director, NRC Office of I & E, Washington D.C.

Mr.' N.S. Reynolds, (Bishop, Liberman, Cook, Purcell and Reynolds)

Mr. A.A Tuzes, Combustion Engineering 1

8410150224 841004 DRADCOK05000g 1

/E- //

Q w.

. &~*

Subject:

d)M [- h, [ [ &

NbO3

~

STATE OF= WASHINGTON

)

) ss COUNTY:0F.BENTON

)

I, G.C..SORENSEN,-being duly sworn, subscribe.to and say that I am the Manager, Regulatory Programs for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing and to.the-best of my knowledge, information, and belief, the

--statements made in.it are true.

..nATED 3 Cd,78SEE,1984

./5.C. SORENSEN, MANAGER, REGULATORY

.. PROGRAMS On this day personally appeared before me G.C. SORENSEN to me known to be

. the individual who executed the foregoing ' instrument and acknowledged that he signed the same as:his free act and deed for the uses and purposes therein mentioned.

GIVEN'under my hand and seal this 8 h day of 6L) 1984.

d

.s P ^^

Ndtpry Pubfic in and for the State of Washington

G Residing at

[7 7

[Ok yxaes Mr

-