Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 2CAN109505, Provides Requested Info Re Containment Cooling Response Time TS Change Request + (15:25:42, 13 December 2024)
- ML20093G401 + (15:25:42, 13 December 2024)
- ML20093G392 + (15:25:44, 13 December 2024)
- RBG-19044, Final Deficiency Rept DR-145 Re Design Mods Performed at Location Not Specified by Engineering & Coordination Rept C-3346.Item Not Reportable Per 10CFR50.55(e) + (15:25:44, 13 December 2024)
- ML20093G390 + (15:25:45, 13 December 2024)
- ML20093G387 + (15:25:46, 13 December 2024)
- ML20093G385 + (15:25:47, 13 December 2024)
- ML20093G376 + (15:25:47, 13 December 2024)
- W3P84-2697, Fourth Interim Rept of Significant Const Deficiency 114 Re Damaged safety-related Sys Due to Water Hammers.Initially Reported on 840914.Corrective Action Verification Ongoing. Finalization Anticipated by 841019 + (15:25:48, 13 December 2024)
- ML20093G365 + (15:25:49, 13 December 2024)
- ML20093G362 + (15:25:50, 13 December 2024)
- ML20093G357 + (15:25:51, 13 December 2024)
- ML20093G356 + (15:25:51, 13 December 2024)
- ML20093G353 + (15:25:52, 13 December 2024)
- ML20093G346 + (15:25:53, 13 December 2024)
- ML20093G347 + (15:25:53, 13 December 2024)
- 3F1095-19, Requests That NRC Update Svc List to Reflect Change to Cc: Listing Currently Found After Signature Page of NRC Correspondence Sent to Util + (15:25:54, 13 December 2024)
- ML20093G339 + (15:25:54, 13 December 2024)
- ML20093G337 + (15:25:55, 13 December 2024)
- ML20093G332 + (15:25:56, 13 December 2024)
- ML20093G333 + (15:25:56, 13 December 2024)
- ML20093G323 + (15:25:57, 13 December 2024)
- ML20093G295 + (15:25:58, 13 December 2024)
- ML20093G318 + (15:25:58, 13 December 2024)
- ML20093G284 + (15:25:59, 13 December 2024)
- TXX-4223, Forwards Request for Change to FSAR Table 17A-1 to Satisfy 10CFR50.55(f)(3).Change Clarifies Performance of Leak Tests on Instrument Tubing Between Instrument Isolation Valves & Instruments + (15:26:02, 13 December 2024)
- ML20093G271 + (15:26:03, 13 December 2024)
- ML20093G268 + (15:26:04, 13 December 2024)
- ML20093G264 + (15:26:05, 13 December 2024)
- 05000327/LER-1984-053, :on 840905,both Trains of Auxiliary Bldg Gas Treatment Sys Declared Inoperable Due to Uncontrolled Breach of Auxiliary Bldg Secondary Containment Encl.Caused by Opened Inner & Outer Door.Outer Door Closed + (15:26:07, 13 December 2024)
- ML20093G211 + (15:26:09, 13 December 2024)
- ML20093G201 + (15:26:09, 13 December 2024)
- ML20093G190 + (15:26:10, 13 December 2024)
- ML20093G193 + (15:26:10, 13 December 2024)
- RBG-19-069, Forwards Comments on DES,NUREG-1073.Document Satisfactory & Util Agrees W/Conclusions Reached + (15:26:11, 13 December 2024)
- ML20093G176 + (15:26:12, 13 December 2024)
- ML20093G159 + (15:26:13, 13 December 2024)
- ML20093G154 + (15:26:14, 13 December 2024)
- ML20093G151 + (15:26:14, 13 December 2024)
- ML20093G146 + (15:26:15, 13 December 2024)
- ML20093G143 + (15:26:16, 13 December 2024)
- ML20093G139 + (15:26:17, 13 December 2024)
- ML20093G135 + (15:26:23, 13 December 2024)
- ML20093G134 + (15:26:24, 13 December 2024)
- ML20093G132 + (15:26:25, 13 December 2024)
- ML20093G129 + (15:26:27, 13 December 2024)
- ML20093G126 + (15:26:29, 13 December 2024)
- ML20093G125 + (15:26:30, 13 December 2024)
- ML20093G123 + (15:26:32, 13 December 2024)
- ML20093G121 + (15:26:32, 13 December 2024)
- ML20093G119 + (15:26:33, 13 December 2024)