Other: 05000267/LER-1983-009, Forwards LER 83-009/01T-0.Detailed Event Analysis Encl, 05000267/LER-1983-009-01, /01T-0:on 830223,four Masonry Walls Found to Have Inadequate Structural Strength to Withstand Design Criteria Load Combination.Caused by Lack of Dur-O-Wall.Mod Reinforcing Walls W/Steel Bar Straps Completed, ML20079H542, ML20080G208, ML20080H068, ML20082K457, ML20093G129, ML20108F438, ML20132G022, ML20141K274
|
MONTHYEARML20028E9731982-12-23023 December 1982 Notifies That Response to 821119 Request for Addl Info on Masonry Block Walls Will Be Delayed Until 830114 Project stage: Request 05000267/LER-1983-009, Forwards LER 83-009/01T-0.Detailed Event Analysis Encl1983-03-0909 March 1983 Forwards LER 83-009/01T-0.Detailed Event Analysis Encl Project stage: Other 05000267/LER-1983-009-01, /01T-0:on 830223,four Masonry Walls Found to Have Inadequate Structural Strength to Withstand Design Criteria Load Combination.Caused by Lack of Dur-O-Wall.Mod Reinforcing Walls W/Steel Bar Straps Completed1983-03-0909 March 1983 /01T-0:on 830223,four Masonry Walls Found to Have Inadequate Structural Strength to Withstand Design Criteria Load Combination.Caused by Lack of Dur-O-Wall.Mod Reinforcing Walls W/Steel Bar Straps Completed Project stage: Other ML20080G2081983-09-0606 September 1983 Forwards Response Spectra Curves Used in Reanalysis of Masonry Block Walls,Per Request.Walls Reanalyzed Per IE Bulletin 80-11 for SSE W/Damping Value of 5% Project stage: Other ML20080H0681983-09-16016 September 1983 Masonry Wall Design,Fort St Vrain Nuclear Plant, Technical Evaluation Rept Project stage: Other ML20082K4571983-11-0808 November 1983 Responds to Re IE Bulletin 80-11, Joint Reinforcement in Masonry Walls. Reevaluation Will Be Made of All Class I Masonry Walls Seismically Qualified Considering Dur-o-Wall as Structural Element Project stage: Other ML20079H5421984-01-0606 January 1984 Provides Alternative Acceptance Criteria for Determining Workability of Concrete During Period in Which 1-1/2 H Time Requirement Deleted from Bldg 10 Concrete Spec Project stage: Other ML20093G1291984-07-0606 July 1984 Informs That Util Completed Const Work on 840706 Re Joint Reinforcement in Masonry Walls Per IE Bulletin 80-11.No Structural Credit Taken for Dur-O-Wall in Masonry Block Walls Near safety-related Equipment Project stage: Other ML20108F4381985-03-0101 March 1985 Forwards Sketches Indicating Method Utilized to Reinforce Walls & List of Reworked Walls,Per IE Bulletin 80-11 & Response to NRC 850116 Telcon Questions Project stage: Other ML20132G0221985-07-16016 July 1985 Notifies That Three of Five Unmortared Stacked Block Walls Will Not Be Mortared in Place by 850802,per 850301 Commitment,Due to High Radiation Levels Near Fuel Storage Well.Completion Anticipated by 851231 Project stage: Other ML20141K2701986-01-15015 January 1986 Forwards Sser Based on Review of Util 850301 & 0716 Addl Info Re Compliance W/Ie Bulletin 80-11,Items 2(b) & 3 for safety-related Masonry Walls.Remaining Wall Designs Adequate.Items Fully Implemented Project stage: Approval ML20141K2741986-01-15015 January 1986 Sser Supporting Util 850301 & 0716 Addl Info Re Compliance W/Ie Bulletin 80-11,Items 2(b) & 3 for safety-related Masonry Walls Project stage: Other 1983-09-06
[Table View] |
Text
.
public Service Company *P Odwado P.O. BOX 840 DENVE R. COLORADO 80201 2420 W. 26th Avenue, Suite 100-D Denver, Co 80211 July 6, 1984
- h'h]
Fort St. Vrain Unit No. I P-84195 S
Mr. E. H. Johnson, Chief Reactor Project Branch 1 Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive Suite 1000 Arlington, Texas 76012 DOCKET NO. 50-267
SUBJECT:
I&E Bulletin 80-11 Joint Reinforcement in Masonry Walls
REFERENCE:
PSC Letter to E.H. Johnson from 0.R. Lee Dated November 8, 1983 (P-83364)
Dear Mr. Johnson:
This letter is to inform you that on July 6,1984 Public Service Company of Colorado has completed the construction work for rein-forcing those masonry block walls in which credit had been previously taken for the Dur-0-Wall joint reinforcement.
No structural credit is now taken for the Dur-0-Wall in the masonry block walls located near safety related equipment at FSV.
Mr. Wagner of the NRC was advised on July 3, 1984 that the completion date for this project would be delayed a few days from the original July 2,1984 date as stated in the referenced letter.
Mr. Wagner agreed that this would be acceptable and requested that the NRC be notified as soon as the project is complete.
If you have any questions concerning this project, please contact Mr. M. H. Holmes at (303) 571-8409.
Very truly yours, DO$fo on@f.,
PDR H. L. Brey, Manager Nuclear Engineering Division HLB / RAG:pa 0
\\