Public Version of Rev 5 to Emergency Plan Implementing Procedure EPIP 1.2, Notification & Rev 19 to Index. W/J Felton 840714 Release Memo
ML20093G385
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 10/31/1983
From: Denise Wilson
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
To:
Shared Package
ML112410408 List:
References
EPIP-1.2, NUDOCS 8407240118
Download: ML20093G385 (24)


Text

- , .

., ,d

. . EMERGENCY PLAN IMPLEMENTING PROCEDURES REVISION CONTROL SHEET r%

Revision No. 19 Revision Dat._10231/,83, Pare / Proc Date Rev. Page/ Proc Date Rev. Paire/ Proc Date Rev.' *~

INDEI 10-31-P3 11 1.1 3-22-83" 3 1.2 10-12-83 5 1.3 1-13-83 0 2.1 8-8-83 3

. 2.2 7-14-83 5

~

2.3 DELETED 2.4 6-20-83 ,

0 2.5 7-1-83 0 2.6 7-25-83 0 h, 2.7 7-25-83 0 3.1 8-1-83 3 3.2 8-1-83 4 3.3a 6-6-83 4 3.3b 8-2-83 4 4.1 DELETE.D 4.2 '7-14-83 1 4.3 5-27-83 2 4.4 DELETED 4.5 3-15-83 1 5.1 11-24-81 1 5.2 11-24-81 1 6.1 1-31-83 1 6.2 5-11-81 0 6.3 8-3-83 3 6.4 3-19-83 3 7.1 8-16-83 1 ,

(

8407240110 831102 PDRADOCK05000g ,

F -.

geS g --

... .e-

~

EMERGENCY PLAN ZMPLEMENTZNG PROCEDURES

^

INDEX

,-~.

j Document No. Title 1.1 Determination of the Emergency Action Level 1.2 Notification 1.3 Plant and Site Evacuation 4 2.1 Activation and Operation of the Operational Support Center 2.2 Activation and Operation of the Technical Support Center 2.3 DELETED 2.4 Activation and Operation of the ORAA 2.5 Control Room Emergency Response Operation

. 2.6 Activation and Operation of the DAEC Off-Site Radiological and Analytical Laboratory (ORAL) 2.7 Activation and Operation of the DAEC Off-Site Decontamination Facility (ODEF) 3.1 Onsite Radiological Monitoring 3.2 Offsite Radiological Monitoring 3.3a Manual Dose Projections 3.3b Computerized Dose Projections

, . . 4.1 DELETED 4.2 First Aid, Decontamination and Medical Support 4.3 Rescue and Emergency Repair Work 4.4 DELETED 4.5 Administration of Potassium Iodide (KI) 5.1 Deactivation of the Emergency Response Organization ,

!- 5.2 Racovery and Re-entry

! 6.1 Maintenance of DAEC Emergency. Preparedness <

6.2 Training and Drills 6.3 Maintenance of Emergency Facilities Equipment and Supplies 6.4 Emergency Preparedness Comunications Testing 7.1 Emergency Coordinator Duties I

(

Rev. 11

.10/31/83

~

i~'  ;

' EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP 1.2 Page of 19 4

NOTIFICATION Revision 5*

Date 10/12/83

. /%

1.0 PURPOSE ,

1.1 This procedure provides instructions for notifying the Emergency Response Organization and Offsite Ager.cies of the declaration of an Emergency Action e-Level-(EAL).

- 1.2 Additionally, this procedure also provides guidance associated with NRC notification of significant events as prescribed by 1.2.1 Inspection and Enforcement Information Notice 80-06.

1.2.2 Inspection and Enforcement Information Notice 80-06, Supplement 1.

1.2.3 Inspection and Enforcement Bulletin 80-15 1.2.4 10 CFR 50.72.

- 1.2.5 10 CFR 20.403.

t 2.0 APPLICA81LITY 2.1 This procedure applies to msnbers of the on duty Operations and Security

,T

- Shifts and to the Emergency Response Organization upon declaration of an u' EAL.

  • 2.2 The procedure is also applieble to DAEC supervisory personnel in those cases where events occur at the DAEC which do not require implementation of

{

emergency planning requirements, but for which NRC notification is required.

i 3.0 RESPONSIBILITIES

. 3.1 Operations Shift Supervisor 3.1.1 Initiate the notification process appropriate for the event.

I 3.1.2 Insure that notifications made to Off-Site Agencies are conducted within 15 minutes of declaring an Emergency Action Level (EAL).

3.1.3 Verify that the NRC is contacted within one hour of declaration of an event.

3.2 $_ecurity Shift Supervisor 3.2.1 Assign comunicators as required to conduct notifications.

3.2.2 Advise the Security and Support Supervisor upon completion of all

required notifications and appraise him of problems encountered. l 3.3 Emergency Coordinator f

l- 3.3.1 Ensure that initial notifications are made to Off-Site Agencies.

L

~ . . _

~. .

l

~ '

EMERGENCY PLAN IMPLEMENTfNS PROCEDURE EPIP s.2 -

Page of 19 NOTIFICATION Revision 5' .

Date 10/12/83

~,

3.3.2 For, all events classified as an ALERT or higher, verify that continuous connunications have been established with the NRC.

l 3.3.3 For events classified as an ALERT or greater, ensure that follow-up {

i communications are made to the Linn and Benton County Civil Defense

. Offices and the State Office of Disaster Services until relieved of this function by the EOF.

3.4 Assistant Plant Superintendent - Radiation Protection and Security y

3.4.1 Ensure that the Duty Emergency Response Assignments Special Order is i

updated and published as required, m 3.5 Emergency Planning Assistant 1 .

l 3.5.1 Ensure that the listings in the Emergency Telephone Book are reviewed

and updated as necessary on a quarterly basis.

3.5.2 Verify that the auto dialer syste is updated as required to reflect the most current telephone numbers contained in the Emergency Telephone Book. .

i 4.0 INSTRUCTIONS l

JQ) 4.1 GENERAL REQUIREENTS i

4.1.1 All telephone numbers required for notification purposes may be found in the Emergency Telephone Book.

! 4.1.2 Notification of DAEC, Corporate, and Off-site Agency personnel, including the NRC, shall be accomplished for all events classified as

! an emergency.  ;

a) Off-Site Agencies shall be contacted within 15 minutes, as required by 10CFR50, Appendix E, of declaration of an mergency condition or of upgrading an emergency classification, b)- NRC contact shall be made within one (1) hour, as required by 10CFR50.72 of declaration of an emergency condition.-

l 4.1.3 DAEC and Corporat) management personnel .and NRC shall also be contacted for any of the events listed on Attachment.1, prescribed in 10CFR50.72.

p I

s O

,n s_,- . - , - - - , . -. - . ,

n - e. . . - , . - ,

e

'~'

~ EMERGENCY PLAN XMPLEMENTXNG PROCEDURE EPIP 1.2

  • ~

Page of 19

~

NOTIFICATION Revision 5 -

^

( t Date 10/12/83

.~

l NOTE Some of the events listed on Attachment 1 may require implementation of emergency planning requirements.

4 a) NRC contact shall be made within (1) hour, as required by 10CFR50.72 of the determination that such an event has occurred.

b) For those events which require reporting in accordance with a verbal and written report shall also be provided r

i 10CFR20.403,1) within one ( hour or 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, as applicable, to NRC Region III.

4.1.4 For events which require implementation of emergency planning

?

- requirements, the notification process will generally be initiated by the Operations Shift Supervisor.

- 4.1.5 For events which require reporting as defined on Attachment 1 but l

which do not require implementation of emergency planning i requirements, the notification process shall be initiated as directed l' by the Plant Superintendent-Nuclear or his designee.

4.1.6 DAEC and Corporate management personnel to be contacted include:

(~3 a) Plant Superintendent-Nuclear or his designee b) Director of Nuclear Generation or his designee.

NOTE:

1) During normal working hours, the standard organizational reporting relationship should be followed in making contacts.
2) During off-hours, the Operations Shift Supervisor may elect to contact only the on-call Emergency Coordinator. Further internal contacts may then be made as agreed to.

4.1.7 Off-Site Agencies and local response organizations to be contacted i for events which require-implementation of emergency planning requirements include:

a) Linn and Benton County EOC's - via the respective Sheriff's Offices b) State Office of Disaster Services c) Palo Fire Department - as necessary l

- y. . d) Palo Ambulance Service - as necessary l

._.w ._.- .y , ., y

~

EMERGENCY PLAN IMPLEMENTING PROCEDURE EPfP 1.2 Page of 19 NOTIFICATION Revision 5 Date 10/12/83 4.1.8 Notification of the Lir.a and Benton County EOC's of the emergency classification and any subsequent reclassifiction will be provided via the respective County Sheriff's Offices.

{

a) The respective Sheriff's Offices w'll notify local civil defense and advise of event classification and re-classification, b) When the Linn and Benten County E0Cs are staffed, generally not until the SITE EMERGENCY classification is reached, civil defense officials will contact the EOF.

c) Follow-up notifications shall be p'rovided from the DAEC to the local EOCs via the respective Sheriff's Offices for all events classified as an ALERT or greater unless relieved of this function by the EOF.

d) If contact by telephone can not be made, backup communications capabilities to be used include the point-to-point radio and IWAS telephone, in that order.

4 .1.9 If off-site assistance is required for fire or medical emergencies, notification of the need for assistance shall be made as follows:

)

a) Fire Fighting Assistance - The Fire Brigade Leader shall contact the CAS Operator who shall notify Palo Volunteer Fire Department for assistance.

b) Medical Assistance - First-aid personnel on the scene will contact the CAS Operator who shall notify Palo Ambulance Service.

NOTE:

If additional transportation assistance is required, the CAS Operator will make further contacts.

4.1.10 The NRC shall be contacted within one (1) hour of declaration of an emergency condition or determination of any of the events defined on Attachment 1.

a) For events classified as a NOTIFICATION OF UNUSUAL EVENT, the Operations Shift Supervisor will normally make the contact.

b) For events classified or reclassified as an ALERT or greater, the Emergency Coordinator shall insure that such notification is made and that an open continuous communications path is established, prefereable via the NRC " Hot Line" (ENS).

c) For the events indentified on Attachment I wnich do not require implementation of emergency planning requirements, NRC contact shall be made as directed by the Plant Superintendent-Nuclear.

. ' EMERGENCY PLAN 8MplEMENTfNG PROCEDURE EPIP 1.2 Page of 19

~

NOTIFICATION Revision 5

  • O Date 10/12/83 P

4.1.11 Upon completion of notifications Attachment 2, " Initial Notification Message", should be forwarded to the Operations Supervisor for his review.

a) At the conclusion of his review the Operations Supervisor, should

distribute copies of Attachment 2, as follows
1) Send the original to the Control Room, where it should be kept on file for approximately six months after which it may be discarded at his discretion.
2) Send a copy to the Technical Support Supervisor.

s b) Should the Operations Supervisor review mentioned in a) result in

- detecting deviations from procedural guidance he should initiate appropriate corrective actions, this may include additional training, procedural revisions, etc.

i 4.2 NOTIFICATION OF UNUSUAL EVENT 4.2.1 During normal working hours the Operations Shift Supervisor shall initiate notification of DAEC rnd Corporate management by contacting

! - t the Operations Supervisor or his designee.

a) Further notification of DAEC and Corporate management will be conducted following the standard organizational reperting relationship.

b) Contact of Off-Site Agencies including the NRC, shall be conducted as directed by the Operations Supervisor. ,

NOTE:

! Notification to Off-Site Agencies shall be made within 15 minutes i of declaring an EAL.

c) Comunications with Off-Site Agencies shall be documented using Attachment 2, " Initial Notification Message".

l NOTE:

l '

Unless directed otherwise by the Plant Superintendent-Nuclear, no l follow-up calls need be made to Off-Site Agencies. Therefore, as l

part of the message provided, actions being taken to correct the condition may be discussed and the agency so notified that no further calls are planned.

d) Contact with the NRC shall be documented in the Shif t 3upervisor's Log.

i . ..

EMERGENCY PLAN XMPLEMENTING PROCCOURE EPIP 1.2 .. '

6 Page of 19 NOTIFICATION Revision 5 Date 10/12/83 4.2.2 During non-normal working hours, the Operations Shift Supervisor shall initiate notification of DAEC and Corporate management by contacting the on-call Emergency Coordinator, a) Further notification of DAEC and Corporate management will be  ;

conducted as agreed to by the Operations Shift Supervisor and on-i call Emergency Coordinator.

b) Contact of Off-Site Agencies shall be conducted by the second SRO on shift and documented using Attachment 2.

i c) If the second SRO is not available, the Security Shift Supervisor may be requested to make such calls, d) Contact shall be made with the NRC as directed by the Operations

! Shift Supervisor. Such notification will normally be made by a

! licensed SRO. Documentation of such notification shall be recorded in the Shift Supervisor's Log.

4.3 ALERT. SITE EMERGENCY OR GENERAL EMERGENCY NOTE:

Full activation of the DAEC Emergency Response Organization is required for all events classified as an ALERT or greater.

, 4.3.1 The Operations Shift Supervisor shall direct implementation of EPIP i 1.3, " Plant and Site Evacuattor.".

4.3.2 Duaing normal working hours, the Emergency Coordinator shall assume

! all responsibility for contact of Corporate Management and Off-Site Agency personnel.

4 NOTE:

Use of the common pager number to notify the Emergency Response Organization need not be done under these circumstances.

i a) Such notifications shall normally be made from the Technical Support Center.

b) Notification to Off-Site Agencies shall De made within 15 minutes of declaring an EAL as required by 10CFR50, Appendix E.

c) Notifications n.ade to Off-Site Agencies shall be documented using Attachment 2.

l d) NRC contact and establishment of a continuous open communication-path with NRC Headquarters as required by 10CFR50.72 shall normally by made from the TSC as prescribed in paragraph 4.3 .

h

, f' .,

~ EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP 1.2 i

~

~

Page of 19 NOTIFICATION Revision 5

's Date 10/12/83 4.3.3 Ouring non-normal working hours, notification of Corporate Managemart, DAEC Emergency Response Organization personnel and Off-Site Agencies shall be initiated as follows:

i NOTE:

If an EAL is declared due to a security related mergency, all notification functions performed by Security Force personnel shall be assumed by Operations.

a) Upon hearing the evacuation alam and paging announcement the Security Shift Supervisor shall dispatch a member of the Security Force to the Control, Room.

. b) The Operations Shift Supervisor shall ensure that items 2 through 7 of the initial Mtification Message, Attachment 2, is completed and verify that notification of the Off-Site Agencies is initiated. Normally such notification will be accomplished by the second SRO on, shift as described in paragraph 4.5 of this procedure. s c) The Operations Shift Supervirer shall insure that the Emergency

( Response Organization Notification Message, Attachment 3, is

, completed and provided to the Security Force member dispatched to the Control Room, d). The Operations Shift Supervisor shall direct notification of key members of.the Emergency Response Organization using the group pager telephone o.:mber and pre-planned message as prescribed in the current Outy Emergency Response Assignments Special Order.

NOTE:

The group pager message should be repeated twice more at 5 minute intaryals each.

e) The Operations Shift Supervisor shall also notify or insure that the 'on call Emergency Coordinator is notified of the event by

, making direct telephone contact.

i ' f) The<an cal 1 Emergency Coordinator shall notify the Emergency Responsa and Recovery Director by making direct telephone contact

' end appraise him of the situation, the sequence of events, as appropriate, and corrective actions being taken.

}. , NOTE:

This initial conta.t should be brief and, if at all practicable, I made befcre traveling to 'the site.

t

, .J' N a . i

'q

, i. ,

\' ,

'~

,s 3

<tg -( --

6 l, ,

_y+.+4, -

g

  • 6 -

EMERGENCY PLAN EMPLEMENTXNG PROCEDURE EPIP 1.2 -

8 Page of 19 NOTIFICATION Revision 5 Date 10/12/83 g) Off-Site Agency contact shall be accomplished as described in paragraph 4.5.

h) NRC contact and establishment of an open continuous communi- {

cacions path will nonnally be accomplished by the assigned commJnicator in the TSC as described in paragraph 4.8.

NOTE:

Regardless of the situation the Emergency Coordinator - the Operations Shift Supervisor until relieved- shall insure the NRC is contacted within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of declaration of the event.

4.4 Significant Events Requiring Promat Notification 4.4.1 Additional events which may not be considered as those which require notification and/or activation of the Emergency Response Organization but which require prompt reporting to the NRC are tabulated in Attachment 1, " Additional Events Requiring Prompt NRC

Notification".

a) Events which require not only prompt notification of the NRC but also establishment of an open, continuous cannunications path are so noted.

b) In those cases where an open, continuous canmunications path is required to be maintained, activation of the Emergency Response Org,anization will most likely be required.

4.4.2 Notification of OAEC and Corporate management personnel shall be conducted as follows:

a) During normal working hours - see paragrapn 4.2.1.

b) During non-normal working hours - see paragraph 4.2.2.

NOTE:

If activation of the Emergency Response Organization is required, notification shall be conducted as prescribed in parayaph 4.3, including notification of Off-Site Agencies and the NRC.

4.4.3 Contact with the NRC shall be made as directed by the Plant Superintendent-Nuclear.

4.4.4 In the event that the ENS System is determined to be inoperable, the NRC Operations Center in Bethesda, Md. shall be notified within one' (1) hour of such determination.

[

+  ?-; . , '. .~. r '

i e 1.2

  • F EPIP EMERGENCY 'PLQIMPLEMENTING PROCE01)RE -:j .

2-Page; 9 of 19

, f, p _

~_.,

' NOTIFICATION

~

- Revision 5 *

~,4 - ,, DateIN12/83 P

4.4.5 # ' Events defined in 10CFR20NO3 being vcNDdlly reocrted to both NRC Headquarters and Reg. ion III'.shall also be repcrted by telegraon, mailgra?, or f acsimile to NRC~ Region III. Written reports shall De prepared so that names of individuals who have received exposure to e~

radiation are stated in a separate part of thKreport.

,/

4.5 Notification of Off-SitrAgencies y .

4.5.1 Unless directed'otherwise by th.e Opera: ions Shift .Suoervisor, the second JRLon shift.will" provide initial nodf1 ~~

cation of the-event to

- -:Off-Si tw. , Agencies. - //

. .; /

- < -NOTE: /

~

Notifications to OffiS1IeAgenciessnallbemadewithin15minutesof v

declirfaq an EAi.. / '

s - -

O ,. ,, s .

4. 5.2 If the -second SRO its not, available, the Operations Shift Supervisor may ' direct the Security. Shift Supervisor to make such calls. In such e cases:

, j ,

~

a) Tne Operations ShifL3upervisor- will provide the Security Force

, mirtber.' 6 resent ay /the Control Room, with the Initial Notification Message form.

,, 'f .

b) The Security Force' member wil l provide the message fonn lo the Security Shift;5upervisor who will: assign a Security Force member

~

,as contunicatort

~4.5.3 tipon contacting eacn agenEy, the Initial Notification Message snall

- be read to the' individual wna received the call, confirmec to be

- understood by the" recipient, and the message '

fonn annotated to

,, reficcti: /

" ,- /

, a} . Titce and date 5of the contact. m.,._

b) Name of the' individual who received the call.

n ua-NOTE: Y -

' 1) Confirr3tien that the recipient has correctly recorded the information can be'obtained by requesting that 'the message be read back. . p

2) Call back verification of tnese initial notifications can be expected from,the .0ff-Site Agencies contacted.

4.5.4 Upon completion of all'eails, the' on esil Emergency Coordinator shall be advised upon his arrival on site.

a a

..,.2.

.., 9

.d_ 'N .,:'

_ s h_ e

EMERGENCY PLAN TMPLEMENT!NG PROCEDURE EPIP 1.2 .

Page of 19 NOTIFICATION Revision 5 l

Date 10/12/83 4

4 4.6 Notification of the.0AEC Emergency Response Orgcnization 4.6.1 The Security Force member returning from the Control Room shall 1E provide the Emergency Response Org'anization Notification Message fonn to the Security Shift Supervisor.

4.6.2 The Security Shift Supervisor shall assign two communicators to contact members of the DAEC Emergency Response Organization and provide each with a copy of the Emergency. Response Organization

Notification Message.

1 a) Notification Lists Nos.1 and 2 contained in the Emergency 1

Telephone Book shall be provided to the conmunicators, b) Notification of the Dnergency Response Organization by the assigned connunicators shall proceed in parallel to enable rapid response by personnel who may be needed at the site.

4.6.3 The Security Force Communicators shall perform the following:

a) Telephone, in sequence, tha individuals for each emergency

- position and repeat the Emergency Response Organization Notification Message (Attachment 2).

)

b) Use the priority established in the respective Notification Lists

. until all positions have been filled.

NOTE:

Reference shall be made to the current Duty Emergency Response l

Assignments Special Order. Those individuals assigned should be 4

called first.

< c) Allow approximately 10 rings (about-1 minute) for a call to be answered.

d) Log all calls and attempts on the Notification Log form (Attachment 4).

e) Proceed through the entire sequence identified on the respective Notification List.

f) . If the total number of people required for each energancy .

position has not been reached, attempt notification _ of these L

individuals unavailable during the first calling cycle.

g) Advise the Security Shift Supervisor of problens encountereo and positions which 'can not be successfully filled.

l' .

1

^

. i I

~ ~

~~

EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP 1.2 11 >

L Page of 19 NOTIFICATION Revision 5 -

L Date 10/12/83 i

4.6.4 - Upon being advised of the completion of all calls by the Security Force Communicators and of problems encountered, the Security Shif t Supervisor shall report the status to the Security and Support Supervisor or, if not present, the Emergency Coordinator. .-

' 4.7 Upon completion of all required notifications, the Security and Support )

Supervisor shall advise the Emergency Coordinator of their completion and of significant problems encountered.

4.7.1 If the required Emergency Response Organization positions <, ave not been filled. the Emergency Coordinator shall designate temporary personnel reassignments which may be necessary to fill the positions.

4.7.2 If additional support personnel are required and available from the Corporate Emergency Response Organization, the Security and Support 4 Supervisor shall coordinate such needs with the Emergency Sepport Manager.

4.8 Notification of the Nuclear Regulatory Commission (NRC) ; hall proceed as

, follows:

4.8.1 Notification of the NRC should occur following activation of the TSC by the communicator assigned.

a) As directed by the Emergency Coordinator or Technical Support Center Supervisor, the cannunicator shall notify the NRC of the declared EAL.

b) The time of the initial call and the recipients name shall be recorded in the TSC log.

4.8.2 Notification of the NRC shall be accomplished within one hour of

' declaration of the event, as prescribed in 10CFR50.72.

4.8.3 Once communications with the NRC have been established, ' continuous 2 communications must be maintained as prescribed in 10CFR50.72 unless-terminated by the NRC.

4.9 Notification of Event Re-classification-4.9.1 The Emergency Coordinator shall ensure that offsite authorities are notified of event reclassification.-

4.9.2 If the event is reclassified to a more severe condition, such notification should be made.within 15 minutes.

NOTE:

If the EOF has been activated, this responsibility shall be assumed by the Emergency Response and Recovery. Director.

f

- , . 1-

EMERGENCY PLAN FMPLEMENTING PROCEDURE EPIP 1.2 ~.

12 Page df 19 NOTIFICATION Revision 5 Date 10/12/83 l.

I l a. When the event is classified as more severe, contact shall be made with each organization or indivioual required by the new EAL.

\

b. When the event is classified as less severe, contact shall be
made with each organization or individual required by the fomer

' EAL.

4.9.3 Upon deactivation of Emergency Response Organization from events

? classified as an ALERT, SITE EMERGENCY or GENERAL EMERGENCY, contact shall be made with each organization or individual providing or coordinating support functions with the Emergency Response Organization.

! 4.9.4 Documentation of such notifications shall be made in the TSC Log.

5.0 REFERENCES

5.1 Iowa Electric Light and Power Company Emergency Response Plan.

5.2 Duane Arnold Energy Center Emergency Plan 5.3 10CFR50.72 5.4 10CFR50, Appendix E.

5.5 10CFR20.403 5.6 NUREG 0654, Rey 1.

6.0 ATTACHMENTS

1. Additional Events Requiring Prompt NRC Notification
2. Initial Notification Message Content 9
3. Emergency Response Organization Notification Message Content
4. Notification Log l

l^

i , l

' EMERGENCY PLAN iMPL:MtN.1Na enol:UUKd UU i.2

~- Pags of 19 NOTIFICATION Revision 5 -

Date 10/12/33 4

Approved cy. / DATE: /19'

[ /'S / 8 3 N gency Pla i g W itsfP Approved by: efcv.-f s d , DATE: '#[ lI/T1-Operations Supervisor Approved by - 6Zhiu s OA DATE: J Spurity5 Ifiervisor Reviewed by: ~

w # DATE: / o / / N /1r3 ALARA Coordinator Q C

Reviewed by: bM Operatic'nd C ,=r.ittee Chairman DATE: /4-/g-li b

l \ 11 A Approved by DATE: l#9"b P1 ant Superintendent - Nuclear I

{

-r

^

1 EMERGENCY PLAN IMPLEMENTING PROCEDURE EPIP 1.2 . l Page of 19 NOTIFICATION Revision 5 Date 10/12/83 ATTACHMENT _1 ADDITIONAL EVENTS REQUIRING PROMPT NRC NOTIFICATION i !

1. The exceeding of any Technical Specification safety limit. Open, continuous The DAEC Safety Limits are as identified in Tech. Spec. path required to Sections 1.1.A thru 1.1.0,1.2.1, and 1.2.2 and are intended NRC in Bethesda to establish limits below which the reasonable maintenance of the cladding and primary systems is assured.
2. Any event that results in the nuclear power plant not being Open, continuous in a controlled or expected condition while operating or path required to shutdown. NRC in Bethesda
3. Any act that threatens the safety of the nuclear power plant Open, continuous or site personnel or the security of special nuclear path required to material, including instances of sabotage or attempted NRC in Bethesda s abotage.

4 Any event requiring initiation of shutdown of the nuclear Notification only power plant in accordance with Technical Specification within one (1) hour Limitina Conditions for Operation, to NRC in.Bethesda

5. Personnel error or procedural inadequacy which during normal Notification only operations, anticipated operational occurences, or accident within one (1) hour conditions, prevents or could prevent, by itself, the to NRC in Bethesda fulfillment of the safety function of those structures, systems, and components important to safety that are needed to (i) shutdown the reactor safely and maintain it in a safe shutdown condition or (ii) remove residual heat following reactor shutdown or (iii) limit- the release of radioactive material to acceptable levels or reduce the potential for such release.
6. Any event resulting in manual or automatic actuation of Notification only Engineered Safety Features, including the Reactor Protection within one (1) hour System. Actuation of Engineered Safety Features including to NRC in Bethesda the Reactor Protection System which result from and are part of the planned sequence during surveillance testing does not constitute an event reportable under this item.
7. Any accidental, unplanned, or uncontrolled radioactive Notification only release. (Normal or expected releases from maintenance or within one (1) hour other operational activities are not included), to NRC in Bethesda

~ EMERGENCY PLAN XMPLEMENTXNG PROCEDURE EPIP 1.2

    • Page of 19 NOTIFICATION Revision 5 -

1 Date 10/12/83 ATTACHMENT 1(continued)

ADDITIONAL EVENTS REQUIRING PROMPT NRC NOTIFICATION Notification only 5

, 8. Any f atality or serious injury occurring on the site and requiring transport to an offsite medical facility for within one (1) hour treatment. Serious injuury is considered to be any injury to NRC in Bethesda that in the judgement of the licensee representative will require admission of the injured individual to a hopital for treatment or observation for an extended period of time .

(greater than 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />). Injuries that only require treatment and/or medical observation at a hospital or offsite medical f acility, but do not meet the conditions specified above, are not reportable under this item.

9. Any serious personnel radioactive contamination requiring Notification only extensive onsite decontanination or outside assistance. within one (1) hour

- to NRC in Bethesda

10. Strikes of operating employees or security guards, or Notification only honoring of picket lines by these anployees, within one (1) hour to NRC in Bethesda

-n

- 11. In the event that deviation from Technical Specifications Notification only requirenents becomes necessary, reasonable action that within one (1) hour departs from a license condition or Technical Specification to NRC Region III.

in an emergency, when such action is immediately needed to protect the public health and safety, is permissible, as specificed in 10CFR50.54(x).

12. Any event meeting the criteria of 10CFR20.403 for notification, as follows:

NOTE:

Each of the events defined below shall also be verbally reported to NRC in Bethesda within one (1) hour.

a) Exposure of the whole body of any individual to 25 rems Verbal & written j or more of radiation; exposure of the skin of the whole notification with-body of any individual of 150 rems or more of radiation; in one (1) hour to or exposure of the feet, ankles, hands, or forearms of HRC Region III any individual to 375 rems or more of radiation; or b) The release of radioactive material in concentrations Verbal & written which, if averaged over a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, would notification with-exceed 5,000 times the limits specified for such in one (1)_ hour to materials in Appendix B, Table II; or NRC Region III 1

s i

i i .

EMERGENCY PLAN' IMPLEMENTING PROCEDURE EPIP 1.2 .

Page of 19 NOTIFICATION Revision 5' i

Date 10/12/83 ATTACHMENT 1(continued)

ADDITIONAL EVENTS REQUIRING PROMPT NRC NOTIFICATION i

c) A loss of one working week or more of the operation of Verbal & written f

4 any facilities affected; or notification with-in one (1) hour to NRC Region III i

d) Damage to property in excess of $200,000. Verbal & written

' notification with-in one (1) hour to NRC Region III e) Exposure of the whole body of any individual to 5 rems Verbal & written .

I or more of radiation; exposure of the skin of the whole notification with-body of any individual to 30 rems or more of radiation; in twenty-four (24) or exposure of the feet, ankles, hands, or forearms to hours to NRC Region

75 rems or more of radiation; or III l f) The release of radioactive material in concentrations Verbal & written which, if averaged over a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, would notification . with-exceed 500 times the limits specified for such materials in twenty-four (24 in Appendix B, Table II; or hours tc NRC Region. ~

III i g) A loss of one day or more of the operation of any Verbal & written f acilities_ affected; or notification with-

' in twenty-four (24) hours to NRC Region III h) Damage to properly in excess of $2,000. Verbal & written

! notification with-in twenty-four (24)

. hours to NRC Region III.

)

- . - x , -- - . ,

-

'

  • Page of 19 NOTIFICATION Revision 5 *

.( y Date 10/12/83 ATTACHMENT 2 INITIAL NOTIFICATION MESSAGE Date i l Time EAL Declared Operations Shift Supervisor I

\

, ~1) This is calling from the Duane Arnold Energy Center. i Caller's name & title

2) An event has occured which is classified as a:

a) Notification of Unusual Event, a Type A- event. l b) Alert, a Type B- event.

c) Site Emergency, a Type C- event.

d) General Emergency, a Type D- event.

3) Abnormal radiological releases ARE/ARE NOT occuring.

-- If occuring:

,_ a) The wind is out of the . The population of concern is

('/

located in area (s) .
4) Protective measures for the public ARE/ARE NOT recommended.

-- If protective measures are required as a result -of performing dose projections in accordance with EPIP 3.3, provide protection action recommendations.

5) Off-site radiological monitoring IS/IS NOT planned.

-- If planned:

a) Emergency Monitoring Teams are being/have been dispatched _

6) Direct assistance at DAEC by your agency IS/IS NOT' requested. _

-- If assistance is desired, explain:

i-

. ;. a  :. :. ;. ; :. a ww- _ ;. :. :. ; :.wwwwwwwwwwwwwwwwwwwwwwwwwwceewwwwwwwwwwwwwwwwwwwwww :. :. . :. . .

NOTE:

  • Notifications to Off-Site Agencies must be made within 15 minutes of *
  • declaration of an Emergency Action Level (EAL).

www**we;_____; _____________;-____;___;_________________________;__.4.....A.A...

ji . Received by: Linn County Time l

l Benton County Time Office of Disaster Services Time

' -Initial Notifications Conducted by Forward this attachment to Operations Supervisor.

l 1

'1

~

EMERGENCY PLAN XMPLEMENT!NG PROCEDURE EPIP 1.2 .,

18 Page af 19 NOTIFICATION Revision 5 '

Date 10/12/83 ATTACHMENT 3

EMERGENCY RESPONSE ORGANIZATION NOTIFICATION MESSAGE

{

This.is calling from the OAEC.

caller's name and job position

+

An event classified as an has occured at ALERT / SITE EMERGENCY / GENERAL EMERGENCY .

the OAEC.

A release in progress and heading towards l' 15/15 NOT Applicable Town, as Appropriate.

Use access to the site.

NORMAL / ALTERNATE 4

NOTE:

If alternate access routes should be followed, identify the routes to be

. used or identify areas or sectors to be avoided.

Se prepared to provide identification to local law enforcement officials.

Report to the site and assume your assigned emergency response duties.

Please drive cautiously and do not take any unnecessary risks.

EMERGENCY PLAN IMPLEMENTING PROCEDllRE EPIP 1.2 19

- Page of 19 l

~

  • NOTIFICATION Revision 5 1 m

Date 10/12/83 ATTACHMENT 4 NOTIFICATION LOG

{ I CONTACT MADE NAME EMERGENCY RESPONSE POSITION TIME CALLED YES N0 i I

e M'

h i

e m

I i.

f w

G Communicator I

g  :-

'~

+

. b' . i -

UNITED STATES 7:g-

[3'  ; , :; E NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 y%g.;Q.(

. o,

  • *V.

,f)/a July 17,.1984 331 Duane' Arnold .

s MEMORANDUM FOR: Chief, Document Management Branch, TIDC FROM: Director, Division of Rules and Records, ADM

SUBJECT:

REVIEW 0F UTILITY EMERGENCY PLAN DOCUMENTATION The Division'of Rules and Records-has reviewed the attached document and has determined that it may now be made publici available.

/

/

f% /

/'J.M.Felton, Director 1

J Division of Rules and Records ('/g Office of Administration

Attachment:

As' stated.

4 i

r-t fa

,r -

i n .- ,

e __ ,,_-g.