Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099C936 + (11:42:26, 13 December 2024)
- RBG-19328, Interim Deficiency Rept DR-157 Re ASME Stock Fittings W/Painted Exteriors & Interiors.Next Rept Will Be Provided by 841205 + (11:42:27, 13 December 2024)
- RBG-20-313, Forwards Revised FSAR Section 9A.2.1 Responding to Concerns Identified in NRC .Section 9A.2 Provides Fire Hazards Analysis,Including Safe Shutdown Analysis.Submittal Completes Response to SER Outstanding Issue 13 + (11:42:27, 13 December 2024)
- ML20099C929 + (11:42:28, 13 December 2024)
- B11466, Application for Amend to CPPR-113,reflecting Exemption from GDC-4 Requirements Re Dynamic Effects of RCS Main Loop Pipe Breaks & Revising Paragraph 3.C of CP + (11:42:29, 13 December 2024)
- ML20099C922 + (11:42:30, 13 December 2024)
- ML20099C919 + (11:42:30, 13 December 2024)
- ML20099C918 + (11:42:31, 13 December 2024)
- B11472, Provides Status of Simulator Project & Training Program & Revised Position on Use of Simulator in Operator Licensing Exams.Meeting Suggested to Finalize Arrangements for Operator Exams.Outline of Training Program Encl + (11:42:32, 13 December 2024)
- RBG-20-270, Responds to 850125 Questions & Comments Re Pool Dynamic Loads for Facility.Revs to FSAR Supporting Responses Encl. Info Will Be Included in Future Amend to FSAR to Closeout SER Outstanding Issue 7 + (11:42:32, 13 December 2024)
- ML20099C903 + (11:42:33, 13 December 2024)
- ML20099C899 + (11:42:34, 13 December 2024)
- ELV-03869, Confirms That Instrument Striping,Only Remaining Item in Dcrdr,Completed,As Followup to Util + (11:42:37, 13 December 2024)
- ML20099C888 + (11:42:37, 13 December 2024)
- ML20099C876 + (11:42:38, 13 December 2024)
- ML20099C870 + (11:42:39, 13 December 2024)
- ML20099C857 + (11:42:40, 13 December 2024)
- ML20099C854 + (11:42:41, 13 December 2024)
- ML20099C852 + (11:42:41, 13 December 2024)
- ML20099C848 + (11:42:46, 13 December 2024)
- ML20099C850 + (11:42:46, 13 December 2024)
- ML20099C842 + (11:42:47, 13 December 2024)
- ML20099C836 + (11:42:48, 13 December 2024)
- ML20099C841 + (11:42:48, 13 December 2024)
- ML20099C834 + (11:42:49, 13 December 2024)
- TAC:54351 + (11:42:50, 13 December 2024)
- B11453, Forwards Addl Info Re SER Confirmatory Item 70 Concerning 260 Series Questions on QA Program During Operational Phase, Per Discussion During 850129 Telcon.Item Resolved + (11:42:52, 13 December 2024)
- ML20099C832 + (11:42:52, 13 December 2024)
- AECM-84-0465, Forwards Response to Generic Ltr 83-28,Items 1.1 & 1.2 Re post-trip Review Program Description & Procedure & Data & Info Capability,Respectively + (11:42:53, 13 December 2024)
- ML20099C824 + (11:42:54, 13 December 2024)
- ML20099C802 + (11:42:55, 13 December 2024)
- ML20099C812 + (11:42:55, 13 December 2024)
- IR 05000456/2020501 + (11:42:56, 13 December 2024)
- ML20099C790 + (11:42:57, 13 December 2024)
- ML20099C786 + (11:42:57, 13 December 2024)
- ML20099C784 + (11:42:58, 13 December 2024)
- ML20099C775 + (11:42:59, 13 December 2024)
- ML20099C778 + (11:42:59, 13 December 2024)
- ML20099C774 + (11:43:00, 13 December 2024)
- ML20099C762 + (11:43:01, 13 December 2024)
- ML20099C767 + (11:43:01, 13 December 2024)
- 1CAN028510, Forwards Response to 840423 Request for Addl Info Re Generic Ltr 81-21 Concerning Natural Circulation Cooldown Analysis.Natural Circulation Cooldown Procedure Will Be Revised to Reflect Cooldown Method Modeled in Analysis + (11:43:02, 13 December 2024)
- ML20099C758 + (11:43:03, 13 December 2024)
- ML20099C754 + (11:43:03, 13 December 2024)
- ML20099C747 + (11:43:04, 13 December 2024)
- ML20099C746 + (11:43:05, 13 December 2024)
- RBG-20-312, Submits Revised Response to Item 9 of SER Table 1.3,changing Info Provided in Je Booker .Revised FSAR Table 1.5-12 Re Indication of Bypass/Inoperability Due to Auxiliary/Support Sys,Encl + (11:43:06, 13 December 2024)
- ML20099C742 + (11:43:07, 13 December 2024)
- AECM-84-0460, RO 84-035/0:on 840912,during Routine Calibr Check of Portable instrument,152 Uci Calibr Source Found Leaking. Caused by Breached Mylar Coating on Sealed Calibr Source. Source Disposed of as Radwaste & Lockers Inspected + (11:43:08, 13 December 2024)
- B11471, Submits Partial Response to SER Open Item 10 Re Structural Capability of Refueling Cavity Wall.Fsar Table 6.2-43 Encl Showing That Refueling Cavity Wall Designed to Withstand Uniform Pressure of 11.6 Psid + (11:43:09, 13 December 2024)
- ML20099C725 + (11:43:09, 13 December 2024)
- ML20099C715 + (11:43:10, 13 December 2024)