Monthly Operating Rept for Oct 1984
ML20099C715
Person / Time
Site: Callaway Ameren icon.png
Issue date: 10/31/1984
From: Bryant K, Miltenberger S, Patterson J
UNION ELECTRIC CO.
To:
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
ULNRC-966, NUDOCS 8411200036
Download: ML20099C715 (7)


Text

. - - -

MONTHLY OPERATING REPORT 4

DOCKET NO.

50-483

. UNIT NAME-6 DATE NOVEMBER 2, 1984 COMPLaTau BY J. T: PATTERSON-TELEPHONE (314) 676-8207 PART A OPERATIONS SUMARY OCTOBER, 1984 Callaway Plant started the month in Mode 3.

Initial Criticality was on 10-2-84 (Mode 2).

Power ascension to Mode 1 was on 10-19-84.

Turbine roll and load was on 10-24-84.

4

~

o.

4 e

PART B PORV AND SAFETY VALVE

SUMMARY

~

None I

1 i

4 E

4 4

CA-#804 05/09/84 8411200036 841031 QDP-ZZ-04204 PDR ADOCK 05000483 pk{

i R

PDR th

Part C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-483 UNIT Callaway DATE NOVEMBER 2.1984

  • ~

K. R. BRYANT COMPLETED BY TELEPHONE (314) 676-8292 MONTH OCTOBER a

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 0 0

1 37, 0

0 2

0 0

3 j,,

0 0

4 3

0 0

5 21 0

0 6

3 0

7 0

23 0

102 g

24 0

0 9

3 10 0

26 66 11 0

27 86 12 0

23 230 13 0

3 203 14 0

30 189 15 0

31 0

16 0

0[

84 i

g, QDP-ZZ-04204 LQ.

1 i

Part D OPERATING DATA REPORT 50-483 DOCKET NO.

j UNIT-Callaway DATE NOVEMBER 2. 1984 COMPLETED BY K. R. BRYANT TELEPHONg (314) 676-8292 OPERATING STATUS OCTOBER GROM MOURS IN RitPORTING PERICO:

744

1. REPORTING PERIOD:
2. CURRENTLY AUTHORIZEO POWER LEVELIMWo: 3411 max. DEPENO. CAPACITY lml:Not vet known-still DESIGN ELECTRICAL RATING (MWo Net):

1190 in StarCup 5#

100%

2. ; POWER LEVEL TO WHICH RESTRICTED (IP ANY) (MWo.Neti:
4. REASONS FOR RESTRICTION DP ANYl: None 1:I' THIS MONTH YR TO DATE CUMULATIVE 532 532 532-
5. NUMSER OF MOURS REACTOR WAS CRITICAL U
8. REACTOR RESERVE SMUTDOWN MOURS 77 77 77 T
7. MOURS GENERATOR ON LINE 0

0 0

i;

8. UNIT RESERVE SMUTDOWN MOURS 100,269 100,269 100,269
9. GROSS THERMAL ENERGY GENERATED (MWM) to. GROSS ELECTRICAL ENERGY GENERATED IMWMI...

. 18,105 18,105 18,105 14.133 14.133 14 til

11. NET ELECTRICAL ENERGY GENERATED IMWM) l 71.5%

71.5%

71. 5% _
12. REACTOR SERVICE PACTOR 71.5%

71.5%

71.5%

13. REACTOR AVAILAsluTY PACTOR 10.3%

10.3%

1n.17

14. UNIT SERVICE PACTOR 10.3%

10.3%

10.3%

15. ' UNIT AVAILAstLITY PACTOR I

NA NA NA

16. UNIT CAPACITY PACTOR (Ueme MOC)

I.7%

1.7%

1 77

17. UNIT CAPACITY PACTOR tuong Demon MWel....

. 61.2%

61.2%

61.2%

te. UNIT PORCED OUTAGE RATE l-

19. SMUTDOWNS SCHEDULED OVER NEXT 4 MONTHS (TYPE. DATE. ANO OURATION OF EACMI: None v

~

i l

20. IP SMUT OOWN AT END OF REPORT PERIOO. ESTIMATED OATE OF STARTUP:
21. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATIONI:

PORECAST ACHIEVED 10/2/84 INITI AL CRITICAuTY INITIAL ELECTRICITY 10/24/84 COMMERCIAL OPERATION

  • Forecast completion of ascension testing 1/20/85 hh484 QDP-ZZ-04204 i

-,.--w-y v.,wwww~e

.w e,-,--ew v---

+e

-w-

=v y-

,=y<------+v+.<-w-

-v-

--w-.-----w-,-w'+w--++*w---cwv-

---w-=----.'

gw-

,s 9

a I*

/

Part E DOCKET NO.

50-483 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME callaway DATE NOVEMBER 2.1984 COMPLETED BY J. T. PATTERSON TELErilONE (314) 676-8207 REPORT MONTil OCTOBER METHOD OF TYPE SHUTTING DOWN F: FORCED DURATION THE REACTOR OR NO.

DATE S: SCHEDULED (HOURSI RCASON REDUCING POWER CORRECTIVE ACTIONS / COMMENTS 1

10/5 Forced 35.9 A

3 Reactor Trip from 10~8 Amps due to Lo-Lo Steam Generator level.

2 10/10 Forced 16.6 A

3 Reactor Trip from 10-8 Amps due'to Lo-Lo Steam Generator level.

3 10/J1 Scheduled 8.9 B

2 Manual Reactor Trip from 10-8 Amps while performing ETT-SF-07085, ' Shutdown Banks and Highest Worth Stuck RCCA Reactivity Worth Measurements.

i 4

10/16 Fordad _

12.7 A

3 Reactor Trip from 2% Power due to under-voltage on NB01.

5 10/22 Forced 20.2 A

3 Reactor Trip from 3.5% Power due to Lo-Lo Steam Generator level.

6 10/23 Forced S 8.4 A

3s Reactor Trip from 14% Power due to Lo-Lo Steam Generat.oc level.

SUMMARY

Plant is in Mode 1 in its initial sta'ctup; 7

CA-f804 05/09/84 QDP-ZZ-04204

g t

Part E DOCKET NO.

50-483 l

UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Callaway I) ATE NOVEMBER 2, 1984 J. T. PATT5kSON e:

COMPLETED BY REPORT MONTil OCTOBER TELEPHONE (314) 676-8207 1

METHOD OF TYPE SWJTTING DOWN F: FORCED DURATION THE REACTOR OR NO.

DATE S: SCHEDULED (HOURSI REASON REDUCING POWER CORRECTIVE ACTMNTS 7

10/24 Scheduled 8.0 B

2 Manual Reactor Trip from 16% power while performing ETT-ZZ-07140, ' Shutdown and Maintenance of ilot Standby External to the Control Room.'

8 10/27 Forced 3.3 A

3 Reactor Trip from 19% Power due to failed Main Feedwater Control valve.

9 10/30 Forced 24.2 A

3 Turbine Trip from 30% Power due to high vibrations.

l I

ta -R Y:

Plant is in Mode 1 in its initial startup.

4 CA-#804

' 05/09/84 QDP-ZZ-04204

. :J 33c.

' 4, -

g 't

,U NION EtscTaic COMPANY CALLAWAY PLANT M AILING ADDRESS

  • P.O. BOX Sao FULTON MO. 85258 November 7, 1984

,3 Director, Resource Management U. S. Nuclear Regulatory Commission Washington, DC 20555 ULNRC-966 DOCKET. NUMBER 50-483 CALLAWAY PLANT UNIT 1 FACILITY OPERATING LICENSE NPF-30 MONTHLY OPERATING REPORT

+

OCTOBER 1984

Dear Sir:

The enclosed Monthly Operating Report for October 1984 is submitted pursuant to section 6.9.1.8 of the Callaway Unit 1. Technical Specifications.

ti' A E/L S. E. Miltenberger Manager, Callaway Plant i

i i

JTP/WRC/RRG/drs Enclosure L.

)

cc: Distribution attached i

i

[

'lI L

, 5 *..

i

~ *

.i i

e' j

,1 cc distribution for ULNRC-966 with enclosures s

Mr. James G. Keppler Gr:

Regional Administrator

0ffice of
Inspection & Enforcement U.,S. Nuclear Regulatory Commission-Region III 1799 Roosevelt Road Glen Ellyn, IL 60137 Director

.0ffice of Inspection & Enforcement U. S. Nuclear Regulatory. Commission Washington, DC 20555 Records Center Institute of Nuclear Power Operations Suite 1500 1100 Circle 75 Parkway Atlanta, GA 30339 American Nuclear Insurers Library c/o Dottie Sherman The Exchange Suite 245 270 Farmington Avenue Farmington, CT 06032 NRC Resident Inspector Missouri Public Service Commission j

D. F. Schnell J. E. Davis (Z40MOR)

R. L. Powers D. W. Capone A. C. Passwater/D. E. Shafer/D. J. Walker G. A. Hughes W. R. Robinson (QA Record)

P. T. Appleby SEM Chrono 3456-0021.6 Z40ULNRC G56.37 N. Date f

E6)

., I t.

t A

4 i

a