Text
'
- h[
f,5f.
[ '-
m
.g
, n; c
. 1,; -
, :.1 f
~
. W CQ'
- Nya &+
E NIAGARA RIONAWK POWER CORPORATION /300 ERIE BOULEVARD WEST SYRACUSE, N.Y.13202/ TELEPHONE (315) 474-1511.
s 3;
+
~
November 9, 1984 (NMP2L0232)-
4 Mr. R..W. Starostecki, Director >
U.. S( Nuclecr Regulatory Comission-
'RegionfI.
Division of-Project-and Resident-Programs.
- 631' Park Avenue
~ King of_ Prussia, PA:(19406 :
~
NineL ile Point - Unit ~2
. Re:
M Docket No. 50-410 '
-x
Dear Mr.~Starostecki:
~
Enclosed--is our_ detailed response to the Notice ' of Violation - dated -
October 10, 1984 and the accompanying Inspection Report No. 50-410/84-13.
Very truly yours, C. V. Mangan Vice President Nuclear Engineering and Licensing
-CYM/GG/dd
- Enclosure
<xc:
R. A. Gram, NRC Resident Inspector Project File (#0447H) 8411200089 841109 PDR ADOCK 05000410 0
/
i
~
P ~ M
$. 5, r:p
- Q
<X
~
^
a s
~ q:
g.
[
- 3
- ~
} " 0;g.[P < {wnMy p;g
,~
p,
~
-MM 65 y 4
j C
r.
'b u y s
z
, ~,
- y _
+
i - '
' ' J.
~
L
' E_
NIAGARA 1 MOHAWK POWER ? CORPORATION 2
- NINE! MILE 1POINTt-UNITJ2J
~
~
' ? DOCKET NO.L50-410;
~
z
~ ^
.. LResponseito Notice of Violation L 1attacheditot NRC Inspection Report Non50-410/84-13
_~
/
G
. _ [ Violation 1:
T
~
'110CFR50, jap'pendixH B; LCriterion LXJand~ XV, 'and. the~ Nine Mile Point,HUnit 2l
{PSAR,1; Sections 1:17.D.3.11 and fl7.D.3.16, l:: require ;that D Enfinspection; 1 program :be: (implementedf sto lverifyi the-: conformance cof : hardware -
sinsta11ations to f design. requirements, sand D furtherb that9 instances L of -
i 3 nonconfoming '. conditions Jshallt;bei identified-ffor { ' evaluation-,and.
disposition 'inTaccordance with established procedu_res. ; Stone:and; Webster 5 1
' Engineering : Corporation procedure QS L15.11 defines i the: nonconfomance Land ' ~
f<
disposition 7 report to c be ;the Lappropriate vehiclejto document situations 4
' in.which ' engineering evaluation and dispost tion:is Traquired. -
-i Contrary to ths ;abovek the?1icensee was. informed on'. September 6,11984,.
that inadequatezvendorfinspection had :been conducted on:the' ASMEL Service Water strainers l4A cthrough 14Fi as thel strainer top 1 bolts.were noti fully engaged Tin ?accordance n with ? ASME E ND-4711( and the ~ component N-2 ; data'
~
s
' The nonconforming' condition -had been 'identifled,to -Stone Eand reports.
Webster ? Engineering Corporation = and an erroneous 1 disposition - had been provided by engineering;on an interofficeicorrespondence :in lieu ;of the'.~
~
- requisite' nonconformance,and disposition report. '
Thistis a Severity Level.-IV' Violation (Supplement II0.
,The following is submitted in response' to this violation:-
- ASME
- Section ND-4711 states "the threads _ of all bolts or studs -shall 'be
[
engaged in accordance with the design."
The Service Water Self-Cleaning
- Strainer design assumed full thread engagement for. the cover bolting.
~
r Full' thread engagement could not be achieved with!the bolts installed on the strainers.
p
. The documentation checklist accompanying Zurn Industries design drawing I-770207-A:Rev. C identifies the: cover bolts as 7/8-9X51/4" HHCS SA193 B7.. The bolts supplied with the strainers were in. accordance with the L
-documentation checklist.
The N-2. data report, however, conflicts with l
the ' documentation checklist in that 51/2"-long bolts were identified.
1 P
},
p-w
?l-L.
I, V
<w
+
m-z-- - -
}..[S
- Noy %g a w
Zurn's Qualit'y Assur:nc6 Prtgram, the' Authorized! Nuclear Inspect:r and
'Es l Stone & Webster's-Procurement Quality Assurance: failed to identify that
~
_ f_
the installed' bolting material-could not provide. full;th ead engagement.
.!(
e
- In' addition, the discrepancy between the N-2
- datatreport and the design.
. j+@w:,.
.l document was not identified.
-Thejlack of-full thread: engagement was' brought to the attention of Stone &
Webster: Site Engineering Group.by.ITT.Grinnell. At that-time, the Stone &
Webster-field engineer! conducted a review'of design. documents _available'on site:for construction and responded to ITT Grinnell~with an interoffice correspondence.. As.noted above, the bolts.in question were in accordance
- with thel design document, and consequently the condition was'not
? recognized as nonconforming.
Corrective and: Preventive ~ Action' Nonconformance and' Disposition Report No. 8974 has been' issued to document the discrepancy between-the N-2 data. report and ;the strainer cover bolts-
'as well as the lack of. full thread engagement. 'The Nonconformance &.
Disposition Report has been dispositioned " accept-as-is" for the lack of thread engagement ~ based on revised. design calculations'which show that the' ithread engagement' achieved.is satisfactory for the specified service.. The N-2 data. report will be revised.to reflect the acceptable bolts.
- Stone & Webster Procurement Quality Assurance will add an inspection-
' attribute to-inspection plans for mechanical equipment to require
- verification of thread engagement... Stone & Webster Field Quality. Control has revised the inspection plan for mechanical equipment installation to include an attribute for fabrication' verification.
Schedule Full compliance wil1.be achieved by: January.1, 1985.-
Violation 2 The Notice ~of Violation specifically indicates-that no written response is required at this time due to Niagara-Mohawk's extensive corrective actions during the conduct of Inspection No. 84-13.
i~
a.
-- =
.-.