ML20099C832
| ML20099C832 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 11/07/1984 |
| From: | NRC |
| To: | |
| Shared Package | |
| ML20099C837 | List: |
| References | |
| TAC-54351, TAC-54352, TAC-54389, TAC-54390, NUDOCS 8411200085 | |
| Download: ML20099C832 (1) | |
Text
.
je
~
CONTAINMENT SYSTEMS 3/4.6.4 COMBUSTIBLE GAS CONTROL
. HYDROGEN ANALYZERS i
LIMITING CONDITION FOR OPERATION 4
3.6.4.1 Two independent containment hydrogen analyzers shall be
~
APPLICABILITY: MODES 1 and 2.
ACTION:
With one hydrogen monitor inoperable, restore the inoperable l
a.
analyzer to OPERABLE status within 30 days or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, With both hydrogen monitors inoperable, restore at least one monitor b.
to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
SURVEILLANCE REQUIREMENTS 4.6.4.1 Each hydrogen analyzer shall be demonstrated OPERABLE at least once per 92 days on a STAGGERED TEST BASIS by performing a CHANNEL CALIBRATION using sample gases containing:
FARLEY-UNIT 2 3/4 6-19 Amendnient No. 38 Corrected Page h$DO O
P
.