Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100Q824 + (10:22:07, 13 December 2024)
- ML20100Q825 + (10:22:07, 13 December 2024)
- ML20100Q820 + (10:22:08, 13 December 2024)
- 05000374/LER-1996-002-02, :on 960204,Unit 2 Manually Scrammed.Caused by Power Not Available to Transformer Control Logic Even Though Associated Breakers Closed.Conduits Evacuated of Water/Ice & Properly Sealed + (10:22:10, 13 December 2024)
- ML20100Q809 + (10:22:12, 13 December 2024)
- ML20100Q807 + (10:22:13, 13 December 2024)
- ML20100Q805 + (10:22:14, 13 December 2024)
- 05000338/LER-1992-004, :on 920226,inadvertent RPS Trip Signal Resulted During Turbine Trip Response Time Test.Caused by Personnel Error & Unclear Procedure Language.Individual Counselled & More Precise Procedure Instruction Submitted + (10:22:16, 13 December 2024)
- 05000328/LER-1992-002-01, :on 920215,LCO 3.0.3 Entered Upon Loss of Level Indication for Cold Leg Accumulator.Caused by Result of Failure to Follow Work Instruction.Individuals Involved W/ Event Received Appropriate Disciplinary Action + (10:22:18, 13 December 2024)
- ML20100Q792 + (10:22:20, 13 December 2024)
- W3P84-3459, Forwards Compilation of FSAR Changes Intended for Inclusion in Final Updated Sar,Per 841212 Discussion.Changes Stem from Correspondence W/Nrc,Design Changes Implemented Since Amend 36 to FSAR & Administrative Reviews + (10:22:21, 13 December 2024)
- ML20100Q782 + (10:22:22, 13 December 2024)
- ML20100Q775 + (10:22:22, 13 December 2024)
- ML20100Q752 + (10:22:24, 13 December 2024)
- ML20100Q750 + (10:22:24, 13 December 2024)
- SNRC-1116, Forwards Addl Info Re Response to Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events. INPO 84-010, Vendor Equipment Technical Info Program Also Encl.Rept Contains Copyrighted Matl + (10:22:25, 13 December 2024)
- ML20100Q735 + (10:22:26, 13 December 2024)
- 05000440/LER-1996-001, :on 960209,CR Emergency Recirculation Sys TS Time Limit Exceeded Due to Personnel Error.Shift Supervisor & Unit Supervisor Counseled.Licensed Operators & STAs Will Be Trained on Lessons Learned from Event + (10:22:28, 13 December 2024)
- U-602562, Monthly Operating Rept for Feb 1996 for Clinton Power Station Unit 1 + (10:22:29, 13 December 2024)
- ML20100Q726 + (10:22:30, 13 December 2024)
- ML20100Q716 + (10:22:31, 13 December 2024)
- 05000341/LER-1996-002, :on 960207,ESFA of Torus to Drywell Vacuum Breaker Occurred Due to Personnel Error.Enhanced TRS Procedure to Improve Human Factors Aspect of Using Procedure + (10:22:32, 13 December 2024)
- ML20100Q705 + (10:22:33, 13 December 2024)
- ML20100Q702 + (10:22:34, 13 December 2024)
- ML20100Q699 + (10:22:35, 13 December 2024)
- ML20100Q697 + (10:22:36, 13 December 2024)
- ML20100Q676 + (10:22:37, 13 December 2024)
- ML20100Q692 + (10:22:37, 13 December 2024)
- GO2-84-623, Responds to IE Bulletin 84-03, Refueling Cavity Water Seal. Gross Seal Failure Not Expected Because Critical Components Welded or Bolted in Place.Seven Methods Identified to Move Makeup Water to Fuel Pool & Reactor Well + (10:22:42, 13 December 2024)
- ML20100Q660 + (10:22:42, 13 December 2024)
- ML20100Q652 + (10:22:43, 13 December 2024)
- ML20100Q643 + (10:22:45, 13 December 2024)
- ML20100Q636 + (10:22:46, 13 December 2024)
- ML20100Q634 + (10:22:47, 13 December 2024)
- ML20100Q633 + (10:22:48, 13 December 2024)
- ML20100Q632 + (10:22:49, 13 December 2024)
- BECO-LTR-96-017, Forwards Anticipated Operator Licensing Exam Schedule as Requested by NRC Administrative Ltr 96-01 + (10:22:50, 13 December 2024)
- ML20100Q623 + (10:22:51, 13 December 2024)
- ML20100Q627 + (10:22:51, 13 December 2024)
- ML20100Q612 + (10:22:52, 13 December 2024)
- ML20100Q608 + (10:22:56, 13 December 2024)
- ML20100Q598 + (10:22:57, 13 December 2024)
- ML20100Q597 + (10:22:59, 13 December 2024)
- ML20100Q592 + (10:23:00, 13 December 2024)
- ML20100Q568 + (10:23:03, 13 December 2024)
- ML20100Q562 + (10:23:04, 13 December 2024)
- ML20100Q561 + (10:23:05, 13 December 2024)
- ML20100Q559 + (10:23:06, 13 December 2024)
- FVY-84-142, Submits Addl Response to NRC Re Violation Noted in Insp Rept 50-271/84-05.Corrective Action:Ap 0155 Revised to Require Two Operators to Concur w/long-term Change to Normal Equipment Status of Tech Spec + (10:23:07, 13 December 2024)
- ML20100Q550 + (10:23:07, 13 December 2024)
- ML20100Q549 + (10:23:08, 13 December 2024)
- ML20100Q523 + (10:23:09, 13 December 2024)