Text
-.
8 sA RCGg 3
,h Io UNITED STATES g
y T c. ;
g NUCLEAR REGULATORY COMMISSION E
WASHINGTON. D. C 30555 3
i
%...../
NORTHEAST NUCLEAR ENERGY COMPANY THE CONNECTICUT LIGHT AND POWER COMPANY THE WESTERN MASSACHUSETTS ELECTRIC COMPANY DOCKET NO. 50-336 MJ1LLTONE NUCLEAR POWER STATION. UNIT NO. 2
& sNDMENT TO FACIllTY OPERATING LICENSE Amendment No. 154 License No. DPk-65 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Northeast Nuclear Energy Company, et al. (the licensee), dated June 10, 1991, complies with the sta.c?s/ds and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; 8.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
9203180052 920312 PDR ADOCK 05000336 P
e Q' 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. OPR-65 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No.154, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of issuance, to be implemented within 30 days of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
(.f '
E'
& *WuC A
John F;'Stolz, Director u
Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: March 12, 1992 l
l l
l l
l' l
L
1 p
ATTACHMENT TO LICENSE AMENDMENT-NO.154 EACILITY OPERATING LICENSE N0. DPR-qi DOCKET NO. 50-336 Replace the following page of the Appendix A Technical Specifications with the enclosed page.
The revised page is identified by amendment number and contains vertical lines indicating the areas of change, Remove Insert 3/4 10-1 3/4 10-1 i
_. ~
4-i
),4.10 SPECIAL TEST EXCEPTIONS SHUTOOWN MARGIN llMITING CONDITION FOR OPERATION 3.10.1 The SHUTDOWN MARGIN requirement of Specification 3.1.1.1 may be suspended for measurement of CEA worth and shutdown margin provided reactivity equivalent to at -least the highest estimated CEA worth is available for trip
-insertion from OPERABLE CEA(s).
APPLICABillTY: MODES 2 and 3.
6.CTION:
a.
With any full length CEA not fully inserted and with less than the above reactivity equivalent available for trip insertion, within 15 minutes initiate and continue boration at > 40 gpm of boric acid solution at or greater than the required refueling water storage tank (RWST) concentration (ppm) until the SHUTDOWN MARGIN required by Specification 3.1.1.1 is restored.
b.
With all full length CEAs inserted and the reactor subcritical by less than the above reactivity equivalent, immediately initiate and continue boration at > 40 gpm of boric acid solution at or greater than the required refueling water storage tank (RWST) concentration (ppm) until the SHUTDOWN MARGIN required by Specification 3.1.1.1 is restored.
SURVEILLANCE RE0VIREMENTS 4.10.1.1. The position of each full length CEA required either partially or fully withdrawn shall be determined at least once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />.
4.10.1.2 Each CEA not fully inserted shall be demonstrated capable of full insertion when tripped from at least the 50% withdrawn position within 7 days prior to reducing the SHUTDOWN MARGIN to less than the limits of Specification 3.1.1.1.
f L
l.
t MILLSTONE - UNIT 2 3/4 10-1 Amendment No. E2, E7, 72,154 0024
. ~...
.