Text
'
4:
,, ~
DISTRIBUTION:
NMSS r/f SGPR r/f SGPR:DAK APR 2 71983 Case file t/
50-255 PStarcher RDiggs DKers MEMORANDUM FOR: Cecil 0. Thomas, Chief Standardization and Special Projects Branch Division of Licensing, NRR FROM:
George W. McCorkle, Chief Power Reactor SG Licensing Branch Division of Safeguards, NMSS
SUBJECT:
CONSUMERS POWER COMPANY'S RESPONSE TO THE REGULATORY EFFECTIVENESS REVIEW REPORT By letter dated February 18, 1983, the licensee, Consumers Power Company, responded to the recomendations contained in.the Regulato_ry Effectiveness Review (RER) Report dated December 9,1982.
Region III, as part of their most recent safeguards inspection, has verified that -
the licensee has taken appropriate actions to resolve the identified safeguards concerns with the exception of two items. A proposed letter to the licensee requesting additional infomation on this matter is enclosed.
b J
George W. McCorkle, Chief Power Reactor SG Licensing Branch Division of Safeguards, HMSS
Enclosure:
As stated 8412170211 840430 cc:
J. R. Miller, Region,III PDR FOIA T. Wamback, ORB #5,/NRR SHOLLYB3-531 PDR
\\
CONTACT:
g D. A. Kers, NHSS h
05000255070X 217/id 42-74383
....S.G,P,R %,,,,,,S G,P R,
,,,,,,S,G,y,
- SGPR, SGPR.,,,@
omcc>
sun - e>.DKe.ts.;il.........E.0v.f.an.........QKa
..GMcC kle..
..RStarcher...
./a7/83
......../r ' re 3. $.........
... 4 83 4
3 4
...../..Z. 2/. 83 4
4 oaey
.... ~ ~,.....
... ~....
W ENCLOSURE
[..
Jk J0-255
' PROPOSED' LETTER Mr. David J. VandeWalle Nuclear Licensing Administrator Consumers Power Company 212 Kest Michigan Avenue Jackson, Michigan 49201
Dear Mr.. VandeWalle:
This is'to acknowledge receipt of y'our letter dated February 18, 1983, which provided Consumers Power Company's responses to the Regulatory
. Effectiveness Review Report dated December 9,1982. As the : result of Region III's saf.eguards inspection conducted on March"28' April 1,1983.by J. Bela.nger and G. Christoffer, th.e' followi,ng deter-minations haye.been made:
- 1) An implementation schedule for th.e resolution of Item.fl, Perimeter Detection System needs to be submitted. The schedule should include (i) the dates when testing of detection systems will-be inittated and termina.ted, (.ii) the timeframe for deciding on what system to
~
use, and ('iii) the period neces.sary for installation, operational tes.ti.ng and fi.nal s'ystem acceptance s 2)
Ite.m #2, Protected A.rea Entry Search will be reyiewed, by R,egion III inspectors a.fter the new: administration and warehouse buildings are completed in July 198'3.
At this time, we will verify whether or not additional controis are needed to preclude the possibility of contraband bei.ng introduced i.ntg the protected area..
Sincerely, 6
.