k ver Vaney Power Station Shippingport, PA 15077-0004 hr nV eskient Fax (412 3-8 EZLion March 5,1996 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Subject:
Beaver Valley Power Station, Unit No.1 and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Typed Pages for Technical Specification Change Request Nos. 223 and 94 I
Typed, final technical specification pages f>r Technical Specification Change Request Nos. 223 and 94 are enclosed as Attachmchts B-1 and B-2, respectively. Also, summary descriptions of non-intent editorial chang <:s widch have been incorporated into
)
the specifications are provided in Attachments A-1 (Unit No.1) and A-2 (Unit No. 2).
The enclosed technical specification pages have been amended to reflect non-intent editorial changes. The changes denoted in Attachments A-1 and A-2 are the result of a conference call, conducted on March 4,1996, between the NRC and members of my staff, concerning the change request noted above. This submittal represents the revised proposed wording to resolve the NRC reviewer's concern on the original proposed wording submitted on December 15, 1995. In addition, minor non-substantive format changes have been incorporated in this submittal that have no effect on the intent of the technical specification requirements.
If you have any questions regarding the attached information, please contact Mr. G. S. Sovick at (412) 393-5211.
Sincerely, 9603120087 960305
~
DR ADOCK 0500 4-Sushil C. Jain p
b Attachments 11I c:
Mr. L. W. Rossbach, Sr. Resident Inspector DELIVERING Mr. T. T. Martin, NRC Region I Administrator 0UALITY Mr. D. S. Brinkman, Sr. Project Manager ENERGV 110090
l AFFIDAVIT FOR APPLICATION OF AMENDMENT COMMONWEALTH OF PENNSYLVANIA)
) SS:
)
COUNTY OF BEAVER
)
Subject:
Beaver Valley Power Station, Unit No. I and No. 2 BV-1 Docket No. 50-334, License No. DPR-66 BV-2 Docket No. 50-412, License No. NPF-73 Typed Pages for Technical Specification Change Request Nos. 223 and 94 Before me, the undersigned notary public, in and for the County and Commonwealth aforesaid, this day personally appeared Sushil C. Jain, to me known, who being duly sworn according to law, deposes and says that he is Division Vice President, Nuclear Services of the Nuclear Power Division, Duquesne Light Company, he is duly authorized to execute and file the foregoing submittal on behalf of said Company, and the statements set forth in the submittal are true and correct to the best of his knowledge, information and belief.
Sushil C. Jain Subscribed and sworn to before me on this8 day of NAA.ZM, /f96 L b a n u $
htlC ma _ _
" M Seal TaceyA Bacek.gPthic dNEgresAug
.~.:= ~. -
1 ATTACHMENT A-1 Unit 1 Non-Intent Changes PAGE(S)
CHANGE DESCRIPTION INSERT "A" on 1.
Delete the word "only" following the word " testing"in the B 3/4 6-1 following "...(MXPLR) bases for combined Type B and C leakage following an outage or shutdown that included Type B and C testing..."
INSERT "A" on 2.
Add the words "a combined Type B and C leakage limit of" B 3/4 6-1 after the word "and" in the following, "At all other times j
between required leakage rate tests, the acceptance criteria is based on an overall Type A leakage limit of s 1.0 L and..."
ATTACIIMENT A-2 Unit 2 Non-Intent Changes l
PAGE(S)
CHANGE DESCRIPTION INSERT "C" on 1.
Delete the word "only" following the word " testing"in the B 3/4 6-1 following "...(MXPLR) bases.for combined Type B and C leakage following an outage or shutdown that included Type B and C testing..."
l INSERT "C" on 2.
Add the words "a combined Type B and C leakage limit of" l
B 3/4 6-1 after the word "and" in the following, "At all other times between required leakage rate tests, the acceptance criteria is based on an overall Type A leakage limit of < l.0 L, and..."
1 i
i l