ML20100Q782

From kanterella
Jump to navigation Jump to search
Forwards Results of 821202-10 Safeguards Regulatory Effectiveness Review & Proposed Ltr Transmitting Rept to Licensee.Requests Power Reactor Safeguards Licensing Branch Be Provided W/Transmittal Ltr
ML20100Q782
Person / Time
Site: 05000000, Salem
Issue date: 02/10/1983
From: Burnett R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML20100Q372 List:
References
FOIA-83-531 NUDOCS 8412170218
Download: ML20100Q782 (2)


Text

' ' '(

p,,..

p,..

. m T, SM y

~

d~D

..s N !it Ivi4

/

t.f j t., s,

j

_DISTRIBUTI0ft:

l IMSS r/f SGPR r/f Case File E310 1393 JHackert SGPR:JUH g3 50-272 FBurnett MEll0RAliDUM FOR: Darrell Eisenhut, Director Division of Licensing,liRR FROM:

Robert F. Durnett, Director Division of Safeguards, !!!ISS

SUBJECT:

REPORT Oil SALEM REGULATORY EFFECTIVEllESS REVIEW From December 2-10, 1982, members of my staff conducted a Safeguards Regulatory Effectiveness Review at the subject power reactor site.

The results of this review are docu:lented in the enclosed report.

Also enclosed is a proposed letter transmitting the subject report to the licensee and requesting responses to the safeguards concerns identified in the report. Please provide the Power Reactor Safeguards Licensing Branch (SGPR) with a copy of your transmittal letter to the licensee.

c)

Robert F. Burnett, Director Division.of Safeguards,!! MSS

Enclosures:

As stated cc: w/ enclosures Ronald C. Haynes, Regional Ad::linistrator, R-I James G. Partlow, IE C0l1 TACT:

G. W. McCorkle, llMSS nen a parated fre= en:Icec. -(4 42-74018

, M M ETi2E: 32 2 AS 8412QO218840430 PDR p

Sh0LLY83-531 (insert proper classification)

FAFETJAEUS IF*FOR'!).TIO ; %

1.~:mthoriced disclocare subj ect to '

Ad=iulstrative and Cri=inal sanctions.

3 "QAEEPlIli nno Ip,rr 01W:;, kh]

93,4

[MG Tf

.. 'd/l..

....SGP.R.;....

I...$. SG R R.......

...... Sb.........

omen Lg i,g,,,,

Gwraccorkle RFBdrnett sun - o.J.U.he.r t/.cj.,

u 2/ir /a.3.....

. 2/$./83 2z../, z.83... 2/1.0 z.a3...

om>

c r onu ms oo oonmcu mo OFFICIAL RECORD COPY o.c., o m...o. -

w-r..

I.

t i

(

. ~

c PROPOSED LETTER 50-272 Mr. Richard A. Uderitz Vice President - Nuclear Public Service Electric and Gas P.O. Box 236 Hancocks Bridge, New Jersey 08038

Dear Mr. Uderitz:

From December 2-10, 1982, NRC Safeguards Division staff conducted a Regulatory Effectiveness Review at the Salem Nuclear Generating Station.

The findings of that review are documented in the enclosed report.

In order to avoid further delay, the report is being transmitted without which will be sent to you at a later date. Although a number of, notable strengths were observed in the safeguards program, certain safeguards concerns were found that warrant further consideration.

Accordingly, it is requested that you provide comments relative to the areas of concern described in Section 2.2 of the report within days of receipt of this letter.

Sincerely,

Enclosure:

As stated CC:

Robert F. Burnett, Director Arn n ?r tred :'rch onclosur.M a)

~

Division of Safeguards, HMSS

-- _-.-._ _. :il.:M3 7' U N'":

? tc.$

Peter A. Moeller, Manager,

,,(w gdhQ Nuclear Site Protection Ronald C. Haynes, R-I

~ ~[;'~,sytirol:er classificatica)

C'.*.*7.7'I T'.70E% TIC'! N

. ::Mri:.~4 di::h:.n a vn?). it to ini::trativo and Cri=inal sanctions,

' j,'.1 '~~ ~ ^ *y*'9.'7U.T7."T).5 lf [\\, f{O,;3 o i

6

.., n....;..',,, *. ;.;.:.. s *:; U,: \\ ;ylp s ;

6 c a2_J