Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101B912 + (10:11:02, 13 December 2024)
- ML20101B906 + (10:11:04, 13 December 2024)
- ML20101B900 + (10:11:05, 13 December 2024)
- ML20101B874 + (10:11:06, 13 December 2024)
- ML20101B873 + (10:11:07, 13 December 2024)
- ML20101B868 + (10:11:08, 13 December 2024)
- ML20101B863 + (10:11:09, 13 December 2024)
- ML20101B859 + (10:11:10, 13 December 2024)
- ML20101B855 + (10:11:11, 13 December 2024)
- ML20101B854 + (10:11:11, 13 December 2024)
- ML20101B850 + (10:11:13, 13 December 2024)
- PLA-4431, Responds to NRC Re Violations Noted in NOV & Proposed Imposition of Civil Penalty in Amount of $100,000. C/As:Independent Assessment of Security & Nuclear Safety Concerns Program Completed + (10:11:14, 13 December 2024)
- ML20101B832 + (10:11:15, 13 December 2024)
- ML20101B830 + (10:11:17, 13 December 2024)
- ML20101B828 + (10:11:17, 13 December 2024)
- ML20101B827 + (10:11:19, 13 December 2024)
- ML20101B818 + (10:11:20, 13 December 2024)
- ML20101B817 + (10:11:21, 13 December 2024)
- JAFP-96-0110, Forwards Corrected Page of GL 95-07 180-day Response + (10:11:22, 13 December 2024)
- ML20101B801 + (10:11:23, 13 December 2024)
- ML20101B806 + (10:11:23, 13 December 2024)
- U-601991, Ro:On 920522,discovered That External Vessel Surface Was Hot & Chart Recorder Indicated Absorber Bed Temp Greater than 300F.Fire Brigade Was Activated.Sampling Process Established to Monitor Purge Exhaust Composition + (10:11:24, 13 December 2024)
- ML20101B795 + (10:11:25, 13 December 2024)
- ML20101B791 + (10:11:26, 13 December 2024)
- 05000370/LER-1991-012, :on 911108,automatic Reactor Trip Initiated Due to Control Rod Failure.Caused by Equipment Failure. Iae Personnel Downloaded Traces of Electronic Circuit Performance + (10:11:28, 13 December 2024)
- ML20101B789 + (10:11:29, 13 December 2024)
- ML20101B787 + (10:11:30, 13 December 2024)
- ML20101B784 + (10:11:30, 13 December 2024)
- ML20101B781 + (10:11:31, 13 December 2024)
- ML20101B777 + (10:11:32, 13 December 2024)
- ML20101B770 + (10:11:33, 13 December 2024)
- ML20101B768 + (10:11:34, 13 December 2024)
- ML20101B766 + (10:11:35, 13 December 2024)
- BECO-LTR-96-023, Monthly Operating Rept for Feb 1996 for Pilgrim Nuclear Power Station + (10:11:36, 13 December 2024)
- ML20101B759 + (10:11:37, 13 December 2024)
- 05000331/LER-1984-041, :on 841111,reactor Water Conductivity Increased Above Tech Spec Limit.Caused by Resin or Air Intrusion. Operating Procedures Improved to Minimize Sys Disturbances + (10:11:39, 13 December 2024)
- ML20101B755 + (10:11:40, 13 December 2024)
- ML20101B753 + (10:11:41, 13 December 2024)
- ML20101B752 + (10:11:42, 13 December 2024)
- 05000364/LER-1992-003, :on 920502,inadvertent Actuation of ESF Equipment Occurred.Caused by Inadequate Procedural Guidance. New Procedure Was Developed to Provide Guidelines for Temp Signal Test + (10:11:44, 13 December 2024)
- ML20101B750 + (10:11:45, 13 December 2024)
- 05000331/LER-1992-008, :on 920402,discovered That Two Bolts Broke When Subjected to Less than Required Torque Requirements.Caused by Hydrogen Induced Cracking.Bolts Replaced & Sent Offsite for Testing to Determine Cause + (10:11:47, 13 December 2024)
- 05000302/LER-1992-007, :on 920501,facility Determined That Calculated Input Voltage to Motor Operators on Two Steam Admission Valves May Experience Voltage Lower than Minimun Required. Caused by Initial Plant Design.Mod in Progress + (10:11:50, 13 December 2024)
- ML20101B740 + (10:11:51, 13 December 2024)
- ML20101B738 + (10:11:52, 13 December 2024)
- 05000413/LER-1992-006-01, :on 920429,particulate Activity Monitors Declared Inoperable Due to Technical Deficiency in Procedure.Calibr Procedure Revised & Particulate Activity Monitors Recalibr + (10:11:54, 13 December 2024)
- 3F0592-11, Suppls 880830 & 890913 Responses to NRC Bulletin 88-008, Thermal Stresses in Piping Connected to Rcs. Potential for Adverse Thermal Effects Remains Limited to Hpi/Makeup Lines, Based on Complete Review of RCS Interfaces + (10:11:58, 13 December 2024)
- ML20101B711 + (10:11:59, 13 December 2024)
- 05000325/LER-1992-003-02, :on 920413,discovered That Foundation Bolts on Control Bldg Emergency Air Filtration Unit 2A Not in Full Contact W/Nuts.Root Cause Analysis in Progress.Angles & Bolts Removed & Replaced & Welds Fabricated + (10:12:00, 13 December 2024)
- 05000324/LER-1992-013, :on 920430,unexpected Primary Containment Isolation Sys Group 6 Isolation Received & Standby Gas Trains Autostarted.Caused by Incomplete Clearance Instructions.Bus Load Lists Incorporated + (10:12:03, 13 December 2024)
- ML20101B707 + (10:12:05, 13 December 2024)
- ML20101B701 + (10:12:06, 13 December 2024)