ML20101B768
| ML20101B768 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom, Limerick |
| Issue date: | 03/08/1996 |
| From: | Hunger G PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9603150036 | |
| Download: ML20101B768 (7) | |
Text
Station Suppirt Ecurtmint 6'
l 7
C GY c
ecco emerav ema "v Nuclear Group Headquarters i,65 Chesterbrook Boulevard Wayne. PA 19087 5691 March 8,1996 Docket Nos. 50-277 50-278 50452 50-353 License Nos. DPR-44 DPR-56 NPF-39 NPF-85 l
U.S. Nuclear Regulatory Commission i
Attn: Document Control Desk Washington, DC 20555
Subject:
Peach Bottom Atomic Power Station, Units 2 and 3 Limerick Generating Station, Units 1 and 2 Fitness-for-Duty Program Performance Report Data i
Gentlemen:
l By letter dated February 27,1996, PECO Nuclear submitted its semi-annual Performance Data l
Report for the Fitness-for-Duty (FFD) Program as required by 10CFR26.71(d). This report
[
provided FFD Program performance data for Peach Bottom Atomic Power Station (PBAPS),
Units 2 and 3, Umerick Generating Station (LGS), Units 1 and 2, and the Corporate /PECO Nuclear Headquarters for the period July 1995 through December 1995.
l However, we later discovered that information contained in the attachments to our February 27, l
1996 letter, was inadvertently omitted during the duplication process. Specifically, the FFD Performance Data forms that were provided for PBAPS, LGS, and the Corporate /PECO Nuclear Headquarters were not duplicated on both sides. Therefore, we are resubmitting these forms to ensure that the semi-annual FFD Performance Data Report includes complete information.
Very truly yours,
/ d M*
p G. A. Hunger, J.
Director - Licensing 4
Attachments cc:
T. T. Martin, Administrator, Aegion I, USNRC (w/ attachments) i W. L Schmidt, USNRC Senior Resident inspector, PBAPS (w/ attachments)
N. S. Perry, USNRC Senior Resident inspector, LGS (w/ attachments) i 150023 g
9603150036 96o30s l
PDR ADOCK 05000277
){
R ppy I
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 PECO ENERGY COMPANY DECEMBER 31,1995 h panY 6 kbetha Ending PEACH BOTTOM ATOMIC POWER STATION Lecanon David M. Saricy (215) 841-5703 i
Contac Name Phone (induce area code)
Cutotis: ScreervCentirmation (ng/ml)
O Appendix A to 10CFR 26 Marijuana 50 / 15 Amphetamines 1000 / 500 f
Cocaine 300 / 150 Phencyclidine
'25 / 25
/-
Opiates 300 / 300 Alcohol (% BAC) 0.04
/
Long-Term Short-Term Testing Results Ucensee Employees Contractor Personnel Contractor Personnel Average Number witt-Unescorted Access 2360 1567
-2 5
Categories Tested Positive Tested Positive Tested Positive Pre-Access 48 0
1301 24 k
Post accident 11 0
2 0
0 Observed behavior 3
1 5
5 Random 254 0
202 0
Follow-up 25 0
45 0
l Other 12 0
1 0
Total 353 1
1556 29 REV.1/92
Breakdown of Confirmed Positive Tests for Specific Substances Amphe-Phency-Refusal Marijuana Cocaine Opiales famines cEdine Alcohol to Test 1
2 3
4 5
Licens:e Employees 0
1 0
0 0
0 0
Long.Tarm Contractors Short-Term Contractors 18 6
0 0
0 6
1 Total 18 7
0 0
0 6
1 32 I
Y I
4 g.-
[
n.
r
~
l
==
k l
e e 1
O 9
9 w
,www m
n
-s
Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 PECO ENERGY COMPANY DECEMBER 31, 1995 Company 6 bbnr.s Ending LIMERICK GENERATING STATION Locanon David M. Sarley (215) 841-5703 Contac: Natne Phone Onclude area coce)
Cutoff s: Screen / Confirmation (ng/ml)
O Appendix A to 10CFR 26 4
Marijuana 50 / 15 Amphetamines 1000 /500
/
Cocaine 300 / 150 Phencyclidine 25 / 25
/
Opiates 300 / 300 Alcohol (% BAC) 0.04
/
~
Long-Term Short-Term Testing Results Licensee Employees Contractor Personnel Contractor Personnel Average Number witt-2360 Unescorted Access 1567 Categories Tested Positive Tested Positive Tested Positive Pre-Access 60 1
359 10 k
Post accident 16 0
9 0
0 h
Observed behavior 3
0 1
0 Random 240 1
157 0
i Follow-up 48 0
17 0
Other 4
o 3
o Total 371 2
546 10 REV.1/92
Breakdown of Confirmed Positive Tests for Specific Substances Amphe-Phency-Refusal Marijuana Cocaine Opiates famines ekline Alcohol to Test 1
2 3
4 5
Ucens::e Employees 1
1 0
0 0
0 0
t.on0-Term Contractors Short-Term Contractors 7
2 0
0 1
1-0 A
Total 8
3 0
0 1
1 0
}
13 e
3 9
4 e
k
- e e o 4
9 I
e 0
~
i.
i Fitness for Duty Program Performance Data Personnel Subject to 10CFR 26 l
DFFO FNFRCV rnMPANY DFCFMRFR 11 1945 Company 6 Monr4 Ending CORPORATE AND NUCLEAR GROUP HEAD 0UARTERS Locanon David M. Sarley (215) 841-5703 Contac: Name Phone (inrJude area coce)
Cutotis: Screen /Confirmatio n (ng/ml)
O Appendix A to 10CFR 26 Marijuana 50
/ 15 Amphetamines 1000 / 500 f
Cocaine 300
/ 150 Phencyclidine
~25 / 25
/
Opiates 300
/ 300 Alcohol (% BAC) 0.04
/
Testing Results Long-Term Short-Term Ucensee Employees Contractor Personnel Contractor Personnel Average Number with Unesecried Access l
2360 1567 l
Categories Tested Positive Tested Positive Tested Positive Pre-Access 8
0 4
0 l
[
Post accident 2
0 2
0 9
h Observed behavior i
o o
o Random 69 0
13 0
Follow up 5
0 0
0 j
Other 1
0 0
0 Total 86 0
19 0
i REV.1/.92
4 r
4
>k b
l e
W A
0 W
5 4
3 2
1 lats s e uT a
fe o o
O 0
Rt e
lo s
h e
o 0
c c
o o
n lA a
ts
-ye b
c n e
0 ni u
ed o
o 0
S hl ic P
c i
f i
- s c
e e h n e
pi p
mm o
o 0
S Af a ro f
s e
t s
a o
o 0
t ip se O
Te e
v n
i ia t
c o
o 0
i o
s C
oP an d
a 0
u e
i m
j o
o ra r
M ifn s
s o
r r
C s
o o
t e
tc c
f e
a a
y r
r o
tn o
tn l
n p
o o
w m
C C
E o
m m
r e
r d
e e
e k
s T-T-
a n
g t
l r
e n
o a
e c
O t
o h
o r
iL L
S T
B
,