Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101S682 + (09:00:19, 13 December 2024)
- TXX-9218, Supplemental Deficiency Rept CP-87-133,clarifying Performance of Target Identification Surveys for Safety Related Equipment.Initially Reported on 871218.Deficiency to Be Resolved Before Unit 2 Fuel Load + (09:00:20, 13 December 2024)
- ML20101S680 + (09:00:21, 13 December 2024)
- ML20101S676 + (09:00:22, 13 December 2024)
- ML20101S675 + (09:00:23, 13 December 2024)
- ML20101S671 + (09:00:24, 13 December 2024)
- ML20101S669 + (09:00:25, 13 December 2024)
- ML20101S667 + (09:00:26, 13 December 2024)
- PY-CEI-NRR-1522, Monthly Operating Rept for June 1992 for Perry Nuclear Power Plant,Unit 1 + (09:00:26, 13 December 2024)
- ML20101S663 + (09:00:28, 13 December 2024)
- DCL-92-145, Forwards Public Version of Rev 2,change 12 to Emergency Plan. W/920714 Release Memo + (09:00:29, 13 December 2024)
- TAC:54730 + (09:00:30, 13 December 2024)
- ML20101S656 + (09:00:32, 13 December 2024)
- 05000338/LER-1984-025-01, :on 841217,fire Detection Sys for Emergency Switchgear & Air Conditioning Rooms Did Not Meet Operability Requirements.Cause Not Stated.Fire Watch Established + (09:00:33, 13 December 2024)
- ML20101S651 + (09:00:35, 13 December 2024)
- ML20101S646 + (09:00:36, 13 December 2024)
- ML20101S644 + (09:00:38, 13 December 2024)
- ML20101S642 + (09:00:38, 13 December 2024)
- 05000275/LER-1985-002, :on 850104,w/unit in Mode 1,reactor Tripped on Turbine Auto Stop Oil Pressure.Caused by Voltage Transient Due to Second Condensate Booster Pump Startup.All Automatic Equipment Responded as Designed + (09:00:40, 13 December 2024)
- ML20101S621 + (09:00:41, 13 December 2024)
- ML20101S620 + (09:00:42, 13 December 2024)
- DCL-92-137, Forwards Public Version of Revised EPIPs Vols 3A & 3B, Including Rev 21 to EP R-1,rev 21 to EP G-3,rev 2 to EP RB-10 & Rev 11 to EP EF-4.W/920713 Release Memo + (09:00:43, 13 December 2024)
- ML20101S618 + (09:00:43, 13 December 2024)
- ML20101S614 + (09:00:44, 13 December 2024)
- ML20101S604 + (09:00:45, 13 December 2024)
- ML20101S600 + (09:00:46, 13 December 2024)
- ML20101S595 + (09:00:47, 13 December 2024)
- ML20101S590 + (09:00:48, 13 December 2024)
- ML20101S581 + (09:00:49, 13 December 2024)
- ML20101S577 + (09:00:49, 13 December 2024)
- ML20101S573 + (09:00:51, 13 December 2024)
- ML20101S571 + (09:00:52, 13 December 2024)
- ML20101S564 + (09:00:53, 13 December 2024)
- ML20101S559 + (09:00:53, 13 December 2024)
- ML20101S552 + (09:00:55, 13 December 2024)
- ML20101S551 + (09:00:56, 13 December 2024)
- ML20101S550 + (09:00:57, 13 December 2024)
- ML20101S549 + (09:00:58, 13 December 2024)
- ML20101S543 + (09:00:58, 13 December 2024)
- ML20101S536 + (09:00:59, 13 December 2024)
- ML20101S533 + (09:01:00, 13 December 2024)
- ML20101S529 + (09:01:01, 13 December 2024)
- ML20101S527 + (09:01:01, 13 December 2024)
- ML20101S525 + (09:01:02, 13 December 2024)
- ML20101S518 + (09:01:03, 13 December 2024)
- ML20101S512 + (09:01:03, 13 December 2024)
- 2CAN018502, Application for Amend to License NPF-6,clarifying Intent of Tech Spec 4.6.2.2.e Re Sodium Hydroxide Addition Sys.Fee Paid + (09:01:04, 13 December 2024)
- B11422, Forwards Responses to Power Sys Branch 840802 Mechanical Series SER (NUREG-1031) Open Item 2.6,Confirmatory Items 56 & 57 & License Conditions 4,5,6 & 7 + (09:01:05, 13 December 2024)
- ML20101S507 + (09:01:06, 13 December 2024)
- ML20101S504 + (09:01:08, 13 December 2024)
- ML20101S499 + (09:01:09, 13 December 2024)