Proposed Tech Spec 4.6.2.2.e,ensuring Adequate Piping Capacity to Deliver Required Sodium Hydroxide to Containment Spray Line
ML20101S518
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/28/1985
From:
ARKANSAS POWER & LIGHT CO.
To:
Shared Package
ML20101S511 List:
References
NUDOCS 8502050469
Download: ML20101S518 (1)


Text

.

CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)

-d.

At least once per.18 months, during shutdown, by:

1.

Verifying that each automatic valve in the flow path actuates to its correct position on a CSAS test signal.

2.

Verifying that each sodium hydroxide addition pump starts automatically on CSAS test signal.

e.

At least once per 5 years by verifying a flow rate of at least 14 gpm through each sodium hydroxide injection path from the sodium hydroxide pump discharge to the containment spray pump discharge.

r a

i ARKANSAS -. UNIT 2 3/4 6-13 8502050469 850128 PDR ADOCK 05000368 P