CONTAINMENT SYSTEMS SURVEILLANCE REQUIREMENTS (Continued)
-d.
At least once per.18 months, during shutdown, by:
1.
Verifying that each automatic valve in the flow path actuates to its correct position on a CSAS test signal.
2.
Verifying that each sodium hydroxide addition pump starts automatically on CSAS test signal.
e.
At least once per 5 years by verifying a flow rate of at least 14 gpm through each sodium hydroxide injection path from the sodium hydroxide pump discharge to the containment spray pump discharge.