ML20101S590

From kanterella
Jump to navigation Jump to search
Forwards Public Version of Revised Emergency Response Procedures (Erp),Including Revs 80 & 81 to Erp Index,Rev 17 to ERP-140 App 1,rev 6 to ERP-110,rev 1 to ERP-205,rev 10 to ERP-250 & Rev 3 to ERP-520.W/920714 Release Memo
ML20101S590
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 06/19/1992
From: Beck G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20101S592 List:
References
NUDOCS 9207170230
Download: ML20101S590 (3)


Text

,.

10 CFR 50 Appendix E e

Section V PIIILADELPIHA ELECTRIC COMPANY Lj NUCLEAR GROUP HEADQUARTERS 955-65 CHESTERBROOK BLVD, WAYNE, PA 19087 5691 (215) 640-6000 June 19, 1992 NUCLEAR ENGINEERINO & SERVICES DEPARTMENT Docket Nos.

50-277 50-278 License Nos. DPR-44 DPR-56 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

SUBJECT:

Peach Bottom Atomic Power Station, Units 2 and 3 Emergency Plan Implementing Procedures

Dear Sir:

Enclosed are revisions 80 and 81 to the Emergency Response Procedures for Peach Bottom Atomic Power Station, Units 2 and 3.

These procedures are being submitted in accordance with 10 CFR 50.54(q), 10 CFR 50 - Appendix E, and 10 CFR 50.4.

The following procedures are enclosed.

REVISION 80 ERP-140 App. 1 Rev. 17

" Emergency Directors" REVISION 81 ERP-110 Rev.

6

" Emergency Notifications" ERP-205 Rev.

1

" Emergency Preparedness Coordinator /TSC" ERP-250 Rev. 10

" Technical Support Center (T3C) Activation" ERP-520 Rev.

3

" Security Team Activation" ERP-700 Rev.

5

" Technical Support Team Leader (TSTL)"

In accordance with 10 CFR 2.790(a)(6), we request that names and telephone numbers in the above procedures be withheld from public disclosure since such disclosures would constitute an unwarranted invasion of the personal privacy of the individuals involved.

(of mom 2G0032 D

4' h7

.9207170230 920619 j

PDR ADOCK 05000277

/(,

F PDR

Poach' Bottom Atomic Power Station June 19, 1992 Emergency _ Plan Implementing Procedures Page 2 Please note that Revision 80 is not being submitted within the required-30. days.

We apologize for this error and regret any

' inconvenience it may have caused you.

If you have any questions or require additional information, please contact us.

Sincerely, G.

J.' Beck, Manager Licensing Section Enclosure cc:

T. T. Martin, Administrator, Region I, USNRC (2 copies)

J. J. Lyash, USNRC Senior Resident Inspector, PBAPS

-n v,

--a

.-e e-.

oam g

og UNITED S T ATES j;d

,g NUCLE AR REGUL AlORY COMM!SSION

)3 g

.j w ASHINO10N. O C. 20b55 r3 g

/

July 14,1992 50-277/278 PEACH BOTT0f t AT0f TIC POWER STATION MEMORANDUM FOR:

Chief Document Control Branch, IRM FROM:

Director. Division of Freedom of Information and Publications Services, ACM

SUBJECT:

REVIEW 0F UTilllY EMERGENCY PLAN DOCUMENTAT10t!

The Division of Freedom of Information and Publications Services has reviewed the atta:hed document and has determined that it may now be made publicly available.

i$bn u ~ f/ /Yb k w d.

DonnieH.Grimsley, Director \\

b' vision of Freedom of Infons a

and Publications Services Office of Administration

\\