MONTHYEARML19316A7241980-05-21021 May 1980 Forwards Test Rept for Environ Qualification Test of Penn Union & Marathon Terminal Blocks. Rept Satisfies Util August 1979 Commitment to Test Electrical Terminal Blocks Project stage: Other ML19345D0641980-11-0707 November 1980 Submits Supplemental Response to IE Bulletin 79-01B Re Pressurizer Level Transmitter LT-RC-459 Failure & Replacement Transmitter Failure.Sys Component Work Sheet Encl Project stage: Supplement ML19340E8351980-12-12012 December 1980 Forwards Supplemental Response to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment, Identifying Procedures to Provide Addl Guidance for Coping W/Environmentally Unqualified Electrical Equipment Project stage: Supplement ML19343B7681980-12-19019 December 1980 Submits List of Westinghouse Documents to Be Marked as Proprietary & Removed from Pdr.Documents Also Identified in Westinghouse Project stage: Other ML19341A3921980-12-30030 December 1980 Summary of 801202 Meeting W/Util Re Deficiencies in Licensee Response to IE Bulletin 79-01.Agenda Encl Project stage: Meeting ML19347E2261981-03-12012 March 1981 Forwards Supplemental Info to 801231 Response to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. Info Provides Description of Ongoing Qualification Assurance Program Project stage: Supplement ML20004B5981981-04-28028 April 1981 Responds to IE Bulletin 79-01B Re Namco Limit Switches. Prototype Design Being Developed.Limit Switch Sealing Scheduled for First Outage Following Design Completion Project stage: Other ML20004F9671981-06-22022 June 1981 Informs That Applicant Performed Review of & Subsequent Replies ,0202,0312 & 0428 in Response to IE Bulletin 79-01B.Item-by-item re-evaluation in Detailed,Documented Manner Will Be Provided Project stage: Other ML20009B1061981-06-29029 June 1981 Forwards Equipment Qualification Branch Safety Evaluation for Environ Qualification of safety-related Electrical Equipment.Also Forwards Technical Evaluation of Revision 1 to Licensee Response to IE Bulletin 79-01B Project stage: Approval ML20031G1331981-10-15015 October 1981 Forwards Amend 1 to Environ Qualification Documentation Rept for IE Bulletin 79-01B,Vols 1 & 2,in Response to NRC 810608 Safety Evaluation Re Environ Qualification of safety- Related Electrical Equipment Project stage: Other ML20041A1401982-02-11011 February 1982 Advises That Info Requested in NRC Re Environ Qualification of safety-related Electrical Equipment Is Being Submitted to Franklin Research Ctr W/Ltr Project stage: Other ML20054L5141982-06-30030 June 1982 Forwards Updated Executive Summary,Section 1.2 of IE Bulletin 79-01B Rept.List Updated to Reflect Replacement Equipment Installed During Refueling Outage as Well as Info Re Equipment Testing & Procurement/Delivery Schedules Project stage: Other ML20070T3231983-02-0101 February 1983 Responds to SER for Environ Qualification of safety-related Electrical Equipment.Deficiencies Identified Will Not Impair Continued Safe Operation.Reclassification of Manufacturers Info Continuing.Justification for Continued Operation Encl Project stage: Other ML20072L3461983-03-25025 March 1983 Forwards Environ Qualification Documentation Rept, 90-day Response Required by NRC SER for Environ Qualification of safety-related Electrical Equipment Project stage: Other ML20073T1161983-05-0202 May 1983 Forwards Franklin Research Ctr Proprietary Equipment Environ Qualification Worksheets,In Response to 830329 Clarification of Environ Qualification Ser.Previous Submittals Justified Continued Operation.Worksheets Withheld (Ref 10CFR2.790) Project stage: Other ML20071G8321983-05-19019 May 1983 Forwards Response to 10CFR50.49 Rulemaking Re Environ Qualification of Electrical Equipment.When Master List of Equipment Is Coupled W/Recent Response to Ser,More Complete Overview Is Presented Project stage: Other ML20100M5211984-11-29029 November 1984 Forwards Updated Equipment Qualification Items Summary, Including Description of Methods of Environ Qualification for Each Equipment Item Discussed at 840405 Meeting,In Response to SER Re Environ Qualification Project stage: Meeting ML20101Q4941985-01-0202 January 1985 Informs That Actions for Resolving Environ Qualification Deficiencies for Cold Leg Safety Injection Branch Line Flow Transmitters FT-SI-961,962 & 963 Stated in 841129 Rept Will Differ.Rosemount Transmitter FT-SI-943 Installed Project stage: Other ML20101S6001985-01-25025 January 1985 Certifies Compliance w/10CFR50.49, Environ Qualification of Electric Equipment Important to Safety for Nuclear Power Plants, Per Generic Ltr 84-24.Certifications Do Not Apply to Reg Guide 1.97 Equipment Project stage: Other 1981-06-29
[Table View] |
Text
c/o
(
'Af Telephone (412)3934000 Nuclear Division h pping rt, PA 150774004 January 25, 1985 Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Attn: Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Washington, DC 20555
Reference:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334, License No. DPR-66 Generic Letter 84-24 Gentlemen:
On Janua y 11,1985, Duquesne Light Company received Generic Letter 84-24 which reuested a certification of compliance to 10 CFR 50.49,
" Environmental lualification of Electric Equipment Important to Safety for Nuclear Power Piants."
This is to certify that:
(a)
Duquesne Light Company has implemented the requirements of 10 CFR 50.49, as detailed in our submittals on Equip-ment Qualification, for Beaver Valley Unit I within the established schedule except for an extension requested on December 14, 1984 and granted by NRC correspondence dated December 31, 1984. This extension (until November 30,1985) was requested in order to obtain additional docw.entation to fully establish qualifica-tion for Westinghouse motors associated with the 1A and 1B Low Head Safety Injection Pumps and the 1A, IB, and 1C Charging Pumps.
'(b)'
down using fully qualified equipment except as noted Beaver Valley Unit I has at least one path to safe shut-above.
Justification for continued safe operation has been submitted for these items pending the establish-ment of full qualification.
(c)
All other equipment considered to be within the scope of 50.49, as described in our submittals on Equipment Quali-
[g fication, is fully qualified for the conditions under which its operation is ' required.
DO$fof0f0$.'
O PDR
\\
yy x
January 25, 1985 Beaver Valley Power Station, Unit No.1 Docket No. 50-334, License No. DPR-66 Generic Letter 84-24 Page 2 These certifications do not apply to Regulatory Guide 1.97 equipment that was not listed in our previous EQ submittals. The schedule for quali-fication of Regulatory Guide 1.97 equipment is not governed by 10 CFR 50.49(g), but rather will. be established in the Regulatory Guide 1.97 reso-lution-process.
NRC Confinnatory Order dated June 12, 1984 established a
-Regulatory Guide 1.97 submittal date of November 30, 1985 for Beaver Valley Unit 1.
.This also certifies that all IE Bulletins and Infonnation Notices that identify EQ problems are reviewed for their relevance to Beaver Valley Unit 1 and when applicable, are included in the EQ program.
Very truly yours,
. D. Sieber Senior Manager Nuclear Group cc: Mr. W.~ M. Troskoski, Resident Inspector cU.S. Nuclear Regulatory Commission Beaver Valley Power Station Shippingport, PA 15077 Mr. Peter Tam, Project Manager U.S. Nuclear Regulatory Commission Phillips Building Washington, DC 20555
-Mail Stop 438-U.S Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 Director, Safety Evaluation and Control Virginia Electric & Power Company P.O. Box 26666 One James River Plaza Richmond, VA 23261 t.
r, COMMONWEALTH OF PENNSYLVANIA)
SS:
COUNTY OF BEAVER n this ((fIdayof
/44/A M
, ((6
, before 6t/ T, V X//f271
- and Cduhty, personally appeared J. D./iotary Public in and
,a said Commonwealth me,-
Sieber, who being duly sworn, deposed, and said that (1) he is Senior Manager, Nuclear Group, of Duquesne Light, (2)
-heiis duly authorized to execute and file the foregoing Submittal on behalf
- of said Company, and:(3) the statements set forth in the Submittal are true
-'and correct to the best of his knowledge, infonnation and belief.