Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20102B863 + (08:43:45, 13 December 2024)
- RBG-19881, Responds to NRC Re Violations Noted in Insp Rept 50-458/84-32.Corrective Actions:Procedures Reviewed & Discrepancies Re Use & Accuracy of Laters Pages Corrected by Temporary Change Notices + (08:43:46, 13 December 2024)
- RBG-20226, Revises Response to Unresolved Item U5.5-1 Noted in Integrated Design Insp Rept 50-458/84-18.Corrective Actions: Rev 4 to PMM-152 & Rev 2 to PMM-160 Issued to Include Specific Ref to Electrical Conduit Requirements + (08:43:50, 13 December 2024)
- TXX-4404, Requests NRC Approval of Use of ASME Code Case N-397 & N-411 for Analysis of ASME Class 1,2 & 3 Piping.Application of Code Cases Provides Sufficient Levels of Conservatism to Assure Functionability Under Design Conditions + (08:43:51, 13 December 2024)
- ML20102B854 + (08:43:53, 13 December 2024)
- ML20102B852 + (08:43:54, 13 December 2024)
- ML20102B850 + (08:43:54, 13 December 2024)
- ML20102B846 + (08:43:55, 13 December 2024)
- ML20102B841 + (08:43:56, 13 December 2024)
- ML20102B834 + (08:43:57, 13 December 2024)
- ML20102B836 + (08:43:57, 13 December 2024)
- ST-HL-AE-1197, Forwards Evaluation of Containment Pressure Boundary for Fracture Prevention,Per NRC GDC-51,based on Commitment Made During 850124 Meeting W/Nrc + (08:43:59, 13 December 2024)
- ML20102B824 + (08:44:00, 13 December 2024)
- NLS8500039, Application for Amend to License DPR-72,revising Proposed Change 16 to Tech Specs Re Reorganization & Definition of Operable + (08:44:01, 13 December 2024)
- 3F0285-23, Requests Schedular Extension of 840221 NRC Confirmatory Order for Submittal of Detailed Control Room Design Review Summary Rept,Per Suppl 1 to NUREG-0737.Approval of Delay Requested by 850315 + (08:44:02, 13 December 2024)
- ML20102B815 + (08:44:02, 13 December 2024)
- ML20102B807 + (08:44:03, 13 December 2024)
- ML20102B798 + (08:44:09, 13 December 2024)
- 3F0285-24, Responds to Generic Ltr 83-10F, Resolution of TMI Action Item II.K.3.5,Automatic Trip of Reactor Coolant Pumps. Analysis Determined RCS Pressure & Subcooling Margin Temp Setpoints Will Trip Reactor Coolant Pumps + (08:44:10, 13 December 2024)
- ML20102B794 + (08:44:11, 13 December 2024)
- BECO-85-037, Comments on Availability of NRC Fire Protection Policy Steering Committee Rept,Per Generic Ltr 85-01.NRC Response Does Not Address Intent of Question But Establishes Guidelines for Seismic Design of Fire Protection Sys + (08:44:11, 13 December 2024)
- 3F0285-27, Confirms That Response to Generic Ltr 85-04 Re Requirements for Operator Licensing Exams Through 880930 Will Be Delayed. Estimated Requirements Will Be Provided by 850401 + (08:44:12, 13 December 2024)
- ML20102B772 + (08:44:13, 13 December 2024)
- ML20102B778 + (08:44:13, 13 December 2024)
- ML20102B763 + (08:44:14, 13 December 2024)
- ML20102B755 + (08:44:15, 13 December 2024)
- AECM-85-0046, Provides Basis That Weir Wall Overflow Following Postulated Inadvertent Upper Containment Pool Dump Does Not Involve Significant Safety Problem.Evaluation Plans & Justification Provided + (08:44:16, 13 December 2024)
- ML20102B752 + (08:44:16, 13 December 2024)
- 3F0285-11, Discusses Interpretation of 10CFR20.203(f) Which Requires Label Identifying Contents of Containers of Licensed Matl. Util Requires Radioactive Matl Tags on Containers of Radioactive Matls.Feedback Requested by 850308 + (08:44:17, 13 December 2024)
- ML20102B748 + (08:44:18, 13 December 2024)
- ML20102B744 + (08:44:19, 13 December 2024)
- ML20102B741 + (08:44:20, 13 December 2024)
- RBG-20013, Responds to NRC Re Deviations Noted in Insp Rept 50-458/84-38.Corrective Actions:Fsar Commitments Will Be Stressed to Personnel Preparing,Reviewing & Approving Preoperational Test Procedures & Results + (08:44:21, 13 December 2024)
- ML20102B711 + (08:44:22, 13 December 2024)
- RBG-20227, Requests That Response Due Date Be Extended to 850329 for Generic Ltr 84-24, Certification of Compliance to 10CFR50.49,Environ Qualification of Electric Equipment Important to Safety for Nuclear Power Plants + (08:44:22, 13 December 2024)
- ML20102B704 + (08:44:23, 13 December 2024)
- ML20102B702 + (08:44:24, 13 December 2024)
- ML20102B688 + (08:44:25, 13 December 2024)
- 3F0285-21, Application for Amend to License DPR-72,consisting of Tech Spec Change Request 130,switching Fire Detection Instrumentation,Deluge & Sprinkler Sys & Fire Hose Station Tables from Tech Specs to Fire Protection Plan + (08:44:26, 13 December 2024)
- ML20102B683 + (08:44:26, 13 December 2024)
- ML20102B669 + (08:44:27, 13 December 2024)
- ML20102B668 + (08:44:28, 13 December 2024)
- AECM-85-0064, Forwards Revised Justifications for Continued Operation of Asco Solenoid Valves on MSIVs & 480-volt Circuit Breakers in Klockner-Moeller Motor Control Ctr.Encl Revs Support Extension of Environ Qualification Deadline to 851130 + (08:44:29, 13 December 2024)
- ML20102B657 + (08:44:31, 13 December 2024)
- ML20102B653 + (08:44:32, 13 December 2024)
- ML20102B645 + (08:44:33, 13 December 2024)
- ML20102B648 + (08:44:33, 13 December 2024)
- B11455, Forwards Procedure EA-062, Program for Completion of Engineering Assurance In-Depth Technical Audits,Millstone Unit 3 Project, Per 850211 Meeting Discussion.Program Describes NRC Involvement in Audit Process + (08:44:34, 13 December 2024)
- ML20102B622 + (08:44:35, 13 December 2024)
- ML20102B617 + (08:44:36, 13 December 2024)
- ML20102B607 + (08:44:37, 13 December 2024)